Summary
Overview
Work History
Education
Skills
Languages
Interests
Timeline
ResearchAssistant
Karthik Ravi Chandran

Karthik Ravi Chandran

Elevator Design Engineer & SAP Coordinator
KVT Avenue, Sholavaram, Chennai

Summary

Professional with 10 years of experience in the elevator industry, designing safe and efficient elevators through technical drawings, material selection, and compliance with safety standards. Skilled in managing SAP systems to streamline business processes, ensure accurate data handling, and troubleshoot issues. Strong ability to collaborate with teams and deliver effective solutions.

Overview

12
12
years of professional experience

Work History

Elevator Design Engineer & SAP Coordinator

Easa Saleh Al Gurg Group
01.2019 - Current
  • Elevator Design and Implementation:
  • Designed and developed innovative elevator systems, ensuring they met both functional and aesthetic requirements.
  • Conducted detailed design calculations and material selection to optimize performance and comply with relevant safety codes and standards (e.g., ASME A17.1, ISO 25745).
  • Implemented safety features, such as emergency communication systems, fail-safe mechanisms, and proper load-bearing capacities, to adhere to stringent safety regulations.
  • Collaborated with cross-functional teams to align design specifications with project goals, while ensuring compliance with safety codes.


  • Cost Management and SAP Utilization:
  • Utilized SAP for planning and managing project costs, including direct and indirect cost allocation for each elevator project.
  • Monitored and tracked expenditures through SAP to ensure accurate cost allocation and adherence to budget constraints.
  • Generated detailed financial reports and analysis, providing insights into cost management and project financial health.


  • Project Coordination:
  • Coordinated with procurement, finance, and project management teams to integrate cost considerations into the design and execution phases.
  • Identified cost-saving opportunities and implemented strategies to optimize budget efficiency without compromising safety or quality.


  • Stakeholder Communication:
  • Provided regular updates and financial reports to stakeholders, detailing cost status, variances, and recommendations.
  • Ensured clear communication regarding safety measures and design compliance with relevant codes.


  • Continuous Improvement:
  • Analyzed project data and feedback to refine cost allocation processes and enhance overall project cost management and safety compliance.
  • Stayed updated on changes in safety codes and industry standards to continually improve design practices and safety measures.

Elevator Layout Engineer

Northern Elevator Engineering LLC
09.2017 - 11.2019

Elevator Layout Engineer

HCL Technologies
01.2016 - 08.2017

Elevator Design Cum Site Engineer

Kamai Elevators Private Ltd
01.2015 - 12.2016

Junior Elevator Engineer

Cooper Elevators Pvt Lts
02.2013 - 12.2015

Education

Bachelor of Engineering - Mechanical Engineering

Sri Ramanujar Engineering College
Kolapakkam, India
04.2001 -

MMDA Government Higher Secondary School
Chennai
04.2001 -

Skills

2D and 3D modeling

Languages

Tamil
English

Interests

Badminton

Cricket

Travel

Gardening

Cooking

Timeline

Elevator Design Engineer & SAP Coordinator

Easa Saleh Al Gurg Group
01.2019 - Current

Elevator Layout Engineer

Northern Elevator Engineering LLC
09.2017 - 11.2019

Elevator Layout Engineer

HCL Technologies
01.2016 - 08.2017

Elevator Design Cum Site Engineer

Kamai Elevators Private Ltd
01.2015 - 12.2016

Junior Elevator Engineer

Cooper Elevators Pvt Lts
02.2013 - 12.2015

Bachelor of Engineering - Mechanical Engineering

Sri Ramanujar Engineering College
04.2001 -

MMDA Government Higher Secondary School
04.2001 -
Karthik Ravi ChandranElevator Design Engineer & SAP Coordinator