Summary
Overview
Work History
Education
Skills
Certification
DECLARATION
JOB PROFILE
WINCH
HYDRAULIC WORKS
PUMPS
TENSIONER
AIR COMPRESSOR
DIESEL ENGINE
CRANE
SEA WATER REVERSE OSMOSIS SYSTEM
FIRE AND GAS EQUIPMENTS
SAFETY EQUIPMENT
NATURE OF JOB
Timeline
Hi, I’m

KARTHIKEYAN PALANIAPPAN

Mechanic
Therunelveil ,TN
KARTHIKEYAN PALANIAPPAN

Summary

To obtain a position that will enable me to use my strong organizational skills, award-winning educational background and ability to work well with people.

Overview

12
years of professional experience
6
Certifications

Work History

LTB300

MECHANIC
02.2019 - Current

Job overview

  • So far 15+Years of Experience in the Oil and Gas Industry
  • PIPE LAYERBARGE

LARSEN&TOUBRO INDIA LTB 300

MECHANIC
02.2019 - 07.2019

Job overview

  • Pipe laying 16”, 14”, 12”, 10” &8” total 7 pipe laying in, MUMBAI SOUTH north field Total =70 Kms
  • LARSEN&TOUBRO INDIA LTB 300 from 06/08/19 to 06/09/19 As Mechanic D2 OUTER ANCHORAGE in Mumbai
  • LARSEN&TOUBRO INDIA LTB 300 from 24/10/19 to 15/12/19 As MECHANIC IN SRILANKA TRADOG maintains job
  • LARSEN&TOUBRO INDIA LTB 300 from 10/06/2020 to 10/09/20 As Mechanic in MUMBAI Riser project
  • LARSEN&TOUBRO INDIA LTB 300 from 11/11/2020 to31/12/2020 As Mechanic Pipe laying 10”, 16”, 12”, 30” &8” total 10 pipe laying in , MUMBAI SOUTH north field Total =55kms
  • LARSEN&TOUBRO INDIA LTB 300 from 08/01/21 to 29/03/21 As Mechanic lifting jobs, MUMBAI SOUTH north field
  • LARSEN&TOUBRO INDIA LTB 300 from 04/05/21 to 10/07/21 As Mechanic Pipe laying 22”, 32”, 12”, 10” &6” total 7 pipe laying in, MUMBAI SOUTH north field Total =60 Kms
  • LARSEN&TOUBRO INDIA LTB 300 from 13/12/21 to 17/03/22 As Mechanic Pipe laying 10”, 18”, 14”, 32” &10” total 20 pipe laying in, MUMBAI SOUTH north field Total =80 Kms
  • LARSEN&TOUBRO INDIA LTB 300 from 02/10/22 to 26/02/23 As Mechanic Pipe laying 10, 06, 22, 30, & 14” total 20 pipe laying in, MUMBAI PANNA field Total =60 Kms
  • LARSEN&TOUBRO INDIA LTB 300 from 11/07/23 to 06/09/23 As Mechanic D2 OUTER ANCHORAGE in Mumbai
  • LARSEN&TOUBRO INDIA LTB 300 from 16/01/24 to 30/03/24 As Mechanic Pipe laying 10”, 18”, 14”, 32” &10” total 20 pipe laying in, MUMBAI SOUTH north field Total =264 Kms
  • LARSEN & TOUBRO LTB 300 BARGE DRY DACK WORK IN BAHRAIN 18/06/24 TO 19/08/24
  • LARSEN&TOUBRO INDIA LTB 300 from 30/10/24 to 11/01/25 As Mechanic Pipe laying 20, 24, 12, 30, & 14” total 20 pipe laying in, MUMBAI DUDP field Total =257 Kms
  • LARSEN&TOUBRO INDIA LTB 300 from 20/03/25 to 11/05/25 As Mechanic Pipe laying 20, 24, 12, 30, & 14” total 20 pipe laying in, MUMBAI DUDP field Total =257 Kms
  • . Barge maintenance dighi port India LTB 300 from 15/07/25 to 12/10/25 as mechanic barge full maintenance jobs

VALENTINE MARITIME

MECHANIC
12.2013 - 12.2018

Job overview

  • PIPE LAYER BARGE & HEAVY LIFTING
  • VALENTINE MARITIME DLB 1600 from 13/02/13 to 10/08/13 (VM GULF LLC) As Mechanic Pipe laying &riser 16”, 14”, 12”, 10” &8” total 14 pipe laying in ADMO Project, Abu Dhabi in south field Total =178Kms
  • VALENTINE MARITIME MAIN YARD 10/10/13 to 15/04/14 (VM GULF LLC) As Mechanic REGINA -250 barge Maintains job
  • VALENTINE MARITIME MARIDIVE CONSTRUCTOR 250 from 20/06/14 to14/03/15 (VM GULF LLC) As Mechanic Pipe laying & riser 10”24’30’18’ & 6” total 20 pipe laying in ADMO Project, Abu Dhabi in south field Total =150Kms
  • VALENTINE MARITIME MAIN YARD 18/05/15 to 05/12/15 (VM GULF LLC) As Mechanic Regina -250 maintains job
  • VALENTINE MARITIME REGINA 250 from 13/02/2016 to 10/05/16 (VM GULF LLC) As Mechanic Pipe laying &riser 06” 10”, 12”, 16” & 8” total 18pipe laying in L&T Project, MUMBAI in south north field Total =102Kms
  • VALENTINE MARITIME MAIN YARD 02/08/16 to 12/04/16 (VM GULF LLC) As Mechanic DLB 1600 maintains job
  • VALENTINE MARITIME DLB 1600 from 24/07/17 to 29/11/17 (VM GULF LLC) As Mechanic Pipe laying &riser 32”, 20”, 24”, 36” total 4 pipe laying in KNPC Project, KUWAIT in Total 150 Kms
  • VALENTINE MARITIME DLB 1600 from 29/01/2018 to 1/05/2018 (VM GULF LLC) As Mechanic Pipe laying &riser 08”, 14”, 06”, 10” 22” total 15 pipe laying in SUB MARINE Project, MUMBAI south field Total =160Kms
  • VALENTINE MARITIME MC 300 from 4/05/2018 to 18/12/2018 (VM GULF LLC) As Mechanic Riser jobs ADMO project in ABU DHABAI

Education

DIPLOMA from MECHANICAL ENGINEERING
07.2008

University Overview

Skills

Strong experience of mechanical equipment and hydraulics

In-depth knowledge of servicing and performing preventive maintenance of rig equipment

Skilled in performing welding, operating crane, plumbing, and pipefitting

Ability to read and interpret mechanical blue prints and service manuals of equipment spare parts

Strong knowledge of hydraulics and safety measures

Extensive knowledge of testing, repairing, and installing heavy electrical and hydraulic engines

Comprehensive knowledge of inspecting and diagnosing defective parts that hampers the functionality of machine

Possess strong troubleshooting, communication, and organizational skills

Ability to work in a team environment as well as in extreme weather conditions

1 Hardworking

2 Punctuality

3 Ability to work at Heights

4 Self Confidence

5 Can-do-Ability

Certification

PASSPORT S8117316 2019-01-10 2029-01-09 Madurai

DECLARATION

DECLARATION
Here by I declare all my information’s given above are up to best of my knowledge.

JOB PROFILE

JOB PROFILE
  • Performing mechanical and electrical preventive maintenance on engines and equipment.
  • Coordinating with Maintenance Engineer and scheduling preventive maintenance program.
  • Creating, maintaining, and updating daily log on routine maintenance work.
  • Checked, repaired and replaced engine parts.
  • Initiated safety awareness programs and conducted training of new staff.
  • Performed plumbing and carpentry work as required.
  • Carefully studied schematics to ensure that all repairs were performed correctly.
  • Worked hoisting and lifting devices to place heavy parts into place.
  • Maintained an updated inventory of all available replacement parts.
  • Regulated the Rig with the help of the drillers to ensure the design parameters are maintained.
  • Operated various lifting and hoisting devices to install, repair and set up machinery.
  • Safety and housekeeping proper care operations of Barge equipment.
  • Performs period checks and routine maintenance, on engine cooling system.

WINCH

WINCH
  • 85 ton MENTRADE WINCH.
  • Drum capacity 200M x 24m.
  • Main pump (load sensing piston pump) working pressure 250 bar.
  • Pilot pump (multiple stage pump-vane pumps) working pressure 60 bar.
  • Charge pressure (multiple stage pump-vane pump) working pressure 12 bar.
  • Clutch pressure (Gear pump) working pressure 200 bar.
  • Standby pressure 50 bar with the help of logical cartridge manifold.
  • Break holding capacity 15 tons static (1st layer) negative break holding by spring tension and operation time releasing by 60 bar pressure.
  • Three speeds:
  • In first speed 70 70 motor and 140 120 motor will energized for high power.
  • In second speed 140 120 motor will energized for mid power.
  • In third speed 70 70 motor will energized for high speed.

HYDRAULIC WORKS

HYDRAULIC WORKS
  • Troubleshooting internal leakage in hydraulic unit by schematic diagram.
  • Hydraulic bolt tensioning up to 1000 bar 70 percentage of torque.
  • Valve blocks piston seal changing.
  • Changing leak cylinder and double action cylinder.
  • Dismantle DCV.
  • Well knowledge in maintaining the required pressure in the unit.
  • Well knowledge in pneumatic DCV valves.
  • Hydraulic pumps (Gear pump) assemble/dismantle, alignments, test run.
  • Hydraulic Oil refurbishment by oil purifier.
  • Hydraulic cranes maintenance.
  • Hydraulic Valves & pump jack refurbishment installation & hydraulic testing.
  • Hydraulic hose connection.
  • Analyze and understand Hydraulics schematic diagram

PUMPS

PUMPS
  • Involved in centrifugal Pumps overhauling mechanical seal assembling and aligning.
  • Chemical Dosing pump.
  • Screw pumps (fuel line).
  • Vane pump.
  • Load sensing piston pump.
  • Gear pump.
  • Air blow pump.

TENSIONER

TENSIONER
  • Two Vertical Tensioner with each 60 MT pulling capacity.
  • Pipe O.D range 6-60 (inch).
  • Know the process of centering the pipe during the process of clamping.
  • Changing tensioner pad for required pipe size.

AIR COMPRESSOR

AIR COMPRESSOR
  • Air compressor - Screw Type:
  • Having well knowledge about QSI compressors which has an inlet port at the power input end and a discharge port at the opposite end.
  • The mechanism of QSI compressor was complete compression of air for four times of compression cycle.
  • The compressor consists of two rotors housed in a cylinder with two parallel adjoining bores.
  • The male drive motor has four lobes that mesh with six flutes in the female rotor.

DIESEL ENGINE

DIESEL ENGINE
  • Having running maintenance experience in Caterpillar(3508) engines.
  • Monitoring each cylinder temperature.
  • Well experience in changing fuel injector. And giving correct torque.
  • Did 1000 hours service.

CRANE

CRANE
  • Huisman crane hydraulic powered with electrical.
  • Daily check of hydraulic reservoir to maintain the volume of 1600 liters.
  • The main electric motor is 500kw with the connectivity of four multiple stage pump as main and auxiliary lifting pump, swell drive pump, Tugger pump.
  • Main block with 300 ton capacity.
  • Auxiliary block with 30 ton capacity.
  • We can’t use both main block and auxiliary block at the same time.
  • In case of emergency we can lower the boom and main block & auxiliary block.
  • Cooler fan will run when the temperature reaches 50C. When it reaches 40C thermostatic valve will be closed.
  • Booster pump will transfer the hydraulic oil to the main pump at the pressure of 15 bar for the operation.

SEA WATER REVERSE OSMOSIS SYSTEM

SEA WATER REVERSE OSMOSIS SYSTEM
  • Reverse Osmosis is the process of removing total solids and bacteria by external pressure.
  • Maintaining pressure of 800psi by closing the semi permeable membrane discharge valve.
  • Producing fresh water 70 ton per day.
  • Chemical washing by RO3 (Acetylene).
  • Chemical washing by RO4 (Alkaline).
  • Chemical dosing by 904L in fresh water resist corrosion.

FIRE AND GAS EQUIPMENTS

FIRE AND GAS EQUIPMENTS
  • Dry chemical powder and CO2 fire extinguishers, fire hydrants, fire water pumps, firewater.
  • Sprinkler systems, fusible plugs, deluge valve, foam tank, fire & gas panel, Automatic/manually.
  • Release system, fire and gas detectors, and H2S and flare fuel gas systems.

SAFETY EQUIPMENT

SAFETY EQUIPMENT
H2S safety, fire safety, using gas tester (CH 4, H 2 S), fire Extinguisher (foam DCP & Co 2 ) using in fire classification, fusible plug operation, deluge valve operation fire-water pump operation, Breathing Apparatus, Safety life Jacket, Gas Detector. Smoke Detector, heat detector operation, fire monitoring system and electronic monitors.

NATURE OF JOB

NATURE OF JOB
  • Safe working for man power, lifting materials.
  • Safe working for chain pulley 1 to 5 ton.
  • Chipping, Painting and Grinding.
  • All pipe line flanges fitting with Ring Gasket.
  • Pipelines fitting for wells in flow lines.

Timeline

MECHANIC
LARSEN&TOUBRO INDIA LTB 300
02.2019 - 07.2019
MECHANIC
LTB300
02.2019 - Current
MECHANIC
VALENTINE MARITIME
12.2013 - 12.2018
DIPLOMA from MECHANICAL ENGINEERING
KARTHIKEYAN PALANIAPPANMechanic