Summary
Overview
Work History
Education
Skills
Timeline
Generic

KARUMURI HAREESH

Visakhapatnam,AP

Summary

Accomplished Engineer with a proven track record at WAPCOS LIMITED, showcasing expertise in Quality Control and Project Management. Excelled in project estimation and cost analysis, significantly enhancing project execution. Demonstrated exceptional ability in leading quality assurance controls and project planning, ensuring timely completion and client satisfaction.

Overview

9
9
years of professional experience

Work History

Engineer (Civil)

WAPCOS LIMITED, PSU Under Ministry of Jal Shakthi
02.2018 - Current
  • Prepared Project Specific Civil Check Lists being updated time to time as per the work requirements for the Project which are approved by the World Bank and are being implemented in the packaged works of the Project.
  • Monitoring Civil related Quality checks for works in the Project time to time and reporting to Client. Carrying field inspection along with the Client officials to the workplaces as well as areas were issues pertain and solve the same.
  • Involved in Design Review for the structural drawings for foundations, Buildings and all structural elements required for substations and transmission towers and associated civil structures.
  • Prepared Month wise manpower/ resources requirements for completion of project.
  • Prepared daily manpower requirement along with the resource’s allocations required for completion of the project in time and presented to client.
  • Prepared Graphical representation of the Planned vs Actual progress of the project wrt to the manpower allocated and provided recommendations for the improvements to be made by the executing agency to the Client.
  • Supervision of work carried out by EPC contractor.
  • Ensure all design activities for project are performed as per scope of work.
  • Assisted client on field certifications pertaining to the works performed by contractors and timely provided all updated information to the client.
  • Prepared and assisted to the client in the closure reports as per the new formats given by WB&APDRP.
  • Prepared the Implementation Completion Report (ICR) as per the World Bank Formats (templates) given and provided all information to the client.
  • Followed up and received the appreciation and completion letter for organization from the client.

Engineer

Arya Vysya Association
12.2015 - 01.2018
  • Preparing sketches, marking-up drawings and writing specifications etc.
  • Estimating material, construction, and labor costs, and project timescales.
  • Project handling in construction of buildings, structures, heavy foundations, etc.
  • Evaluating, organizing & prioritizing work within the overall project schedule.
  • Structural inspections/assessments and making appropriate recommendations.

Education

Master of Technology - Structural Engineering

Jawaharlal Nehru Technological University
Hyderabad
12.2015

Skills

  • Quality Control
  • Project Estimation
  • Bid drafting
  • Cost Analysis
  • Project Planning
  • Project Management
  • Quality Assurance Controls

Timeline

Engineer (Civil)

WAPCOS LIMITED, PSU Under Ministry of Jal Shakthi
02.2018 - Current

Engineer

Arya Vysya Association
12.2015 - 01.2018

Master of Technology - Structural Engineering

Jawaharlal Nehru Technological University
KARUMURI HAREESH