Ingenious Site Engineer successfully implementing project cost procedures and monitor quality construction. Skilled at reading blueprints and communicating duties to workers. Proficient in methods, principles and applications of engineering, design, building and construction. Careful Site Engineer with 8 years of scrutinizing facilities and operations to enhance risk management and reduce operational inefficiencies. Known for augmenting facilities already considered to be at maximum output. Meticulous in eliminating weaknesses in labor practices and specialized in OIL and GAS industry.
GAS STORAGE INFRASTRUCTRE PHASE-2 THREE MEC COMPRESSOR & DEWA POWER SUPPLY TO MARGHAM PLANT &KHUBAI WELL 1A TIE IN PIPE LINE PROJECT. INTERNATIONAL STANDARDS AND CODES AISC, ACI AND API-936
Involved in the inspection & fabrication of pipe racks,air cooled exchanger structure,motor gas
cooler structure and access platforms and pipe supports secondary and Compressor foundation, Gas motor cooler ,N-S Pipe rack,Access,HP/LP Discharge gas cooler,miscellanies foundations sleeper foundation,pipe support,goal post foundation volve opening platform volve operating plat form,Crown
Substation-25,compressorarea1,2&3,foundations shelter,process access platform,process access platform
Gas motor cooler foundation,north south pipe rock foundation,accessplateform1,2&3,HP/LP Discharge gas cooler foundations,Coal Pipe Bridge and pipe foundations,
Reviewing the structural Materials/technical submittals
Reviewing Method statement/procedures for work execution verifying that fabrication is in accordance with accepted shop Drawings,specifications and any other contract requirements
MEC to KHUBAI WELL 1A TIE IN
Inspectionofcivilactivates13 km trench preparation,preparing,lowering of pipe survey level and post padding back filling, road crossing and cable and pipes crossing, and required places slabs provided with berm construction and preparation of formation with right of way using gated material sand both side provided fencing.
MEC project at Dubai Petroleum.
SULPHUR PIPE PROJECT
PRECAST CONCRETE INSPECTION
Pre-pour inspection of form work and rebar checking of foundation and pedestal Resting pipeline sleepers,Pipe line Guide Sleepers,Pipeline Anchor Sleepers and Pipeline Road Cross of Culvert#1, 2, 3with Wing wall and parapet
Post pouring inspection
Witnessed of concrete placement with slump compressive strength Surveillance inspection of surface preparation of concrete foundation
Witnessed of cube crushing compressive strength 7th and 28th at lab
Monitoring routine curing forecasted foundations of Hessian cloth with polyethylene sheet covered. Monitoring of concrete protection coating.
TAKREER Ruwais Refinery Expansion Package-3&6
Inspection of Civil works earth works,backfilling compaction,Central control building, laboratory building Chlorination building, fire and safety building all Sub stations, Jetty guard, Refinery and South gates Operator shelter and Satellite Workshop water intake, out fall and under ground utilities, erection of steel structures, main pipe racks,concrete, cable trenches, drainage structures structures-foundations for equipments, compressors shelters, pipe racks , Cooling tower, and tank foundations filter feed pump treated water Pump, sludge pump & tank setting tank & Aeration tank & Foundation Value Chambers, and necessary production and coating Field inspection to ensure compliance with approved procedures, drawing and project specifications. Monitor/Witness concreting works to ensure that concrete is placed in accordance with concreting procedure. Witness/Surveillance construction activities to ensure that the works progresses in a manner that will result in compliance with the project specifications and approved drawings, and that the work is completed within specified. Review inspection records and approved.
Ensure that all the construction activities are systematically controlled and executed so that only conforming materials equipment, approved methods and procedure use for construction purposes.
ASABCO- GAS
Fire training centre building, switch Gear building, fire module area , security building , waste water retention tank Pre- casting work , duck bank,HVAC Pump room &chiller plan
New additional office building, A, Main work, B, Work of temporary Office C, Permanent sewer lines EPC –Accommodation Complex–Phase -3, multipurpose hall, Auditorium building, clinic building, substation Chiller yard, maintenance workshop building, store building,
civil works,Substation-#3,4,5,6.
Site inspection
Permit to work -PTW COORDINATOR, DUBAI PETROLEUM
Permit to work -PTW COORDINATOR, DUBAI PETROLEUM
LOLER – Lifting Operations and Lifting Equipment Regulations- [2019-2021]
IMIST (International Minimum Industry Safety Training) Course