Summary
Overview
Work History
Skills
Certification
Timeline
Generic
AKHIL KUMAR JHA

AKHIL KUMAR JHA

CIVIL ENGINEER
ADITYAPUR

Summary

Qualified Civil Engineer with 5.7 years of experience working in various capacities to complete construction engineering tasks. Expert in directing workflow of earth and concrete works, underground utility installations and green and brownfield project demolitions. Proven success in identifying and addressing challenges to complete projects on-time and under budget. Applies cost-saving strategies without sacrificing practicality and quality. Manages large projects and teams to meet milestones and exceed quality expectations.

Overview

8
8
years of professional experience
3
3
Certifications
2
2
Languages

Work History

Individually Handed All GA's Which Is Awarded To MECON Limited
  • From GailIndia ,Gail Gas, CNG Station, CGS,DCU Good For Construction Drawings ,Layout Preparation With Engineering & Co-Ordination With Client, Contractors For Completion Of Project At The Stipulated Time
  • Successfully completed Construction Of Online CNG Station Adityapur, Jharkhand For Gail Gas Limited and Was A Member Of commissioning for the same
  • Successfully completed Project Co- Ordination With Site Supervision Of CGD ADITYAPUR Service Building And Almost about Handover To Client(Gail Gas Limited)
  • Successfully completed Construction Of 4 Online CNG Station at SKWS Jharkhand For Gail Gas Limited and Was A Member Of MECHNICAL COMPLETION for the same
  • Successfully completed Construction Of 6 DAUGHTER BOSTER STATION IN at SKWS Jharkhand For Gail Gas Limited and Was A Member Of Commissioning for the same.

Supervision Of Machine Foundation, Static Load Carrying Foundation
12.2018
  • Like Cascade, Drs, MRS, Odorizing Unit),Trench For Ss-tube, Canopy,Hoarding For Advertising, Storm Water Drainage, Forecourt Development Etc
  • Controlling site with all aspect of safety rules & regulation, labor safety, child safety etc
  • Testing Of Construction Material Like Coarse Aggregate, Fine Aggregate,Binding Material Like Cement, Water As Per Is Code
  • Co-ordinate the Final Documentation activities and also the As-built drawingswith regard to the project close out activities
  • Monthly Monitoring Of Compressive Test Report Of Cubes For Different RCCStructure & Valve Pit
  • Certifying Of All Ra Bills As Per SOR, BBS, Site Register & Scope Of Work Conjugated With Loa Rate
  • On Job Achievements:
  • Oil & gas ( City Gas Distribution projects

Assistant Project Engineer

MECON LTD
01.2019 - Current
  • GAIL (I) LIMITED project at M/s HUNTING HAWK under, CGD Projects, Ranchi &Jamshedpur
  • EPMC Services For CGD Network In Six Cities at Varanasi, Bhubaneswar, Cuttack, Patna, Ranchi And Jamshedpur For Gail India Limited
  • Determined and scheduled priorities as required to progress engineering work.
  • Construction of Decompressed unit (DCU) at RANCHI CGD project of GAIL INDIA LIMITED
  • Construction of 20 +CNG station & making ready commission,a part of PESO approval team& W& M along with GAIL TEAM.



Assistant Project Engineer

Gail GAS LIMITED
ADITYAPUR
01.2019 - Current
  • CGD Projects Adityapur
  • JOB RESPONSIBILITY:
  • EPMC for development of CGD network in 04 GA Of GAS authorized in 10th round of CGD bidding by PNGRB For Gail Gas Limited
  • Supervision of MOTHER STATION (all Civil ,mechanical, electrical work) & making ready for commissioning
  • Supervision of CITY GATE STATION (civil ,mechanical, electrical) & making ready for commissioning.
  • making Bar binding schedule for civil activity.
  • supervision of MDPE/ steel pipeline valve chamber.
  • Construction of 17 PLUS CNG STATION OF HPCL, BPCL, INDIAN OIL RELIANCE(civil ,mechanical, electrical) & making ready .
  • Witnessing SS TUBING Mechanical work & hydro testing work.
  • Construction of machine foundation like compressor on;ine & DBS, cascade, metering skid, pump foundation, DRS, GAS GENSET, TYRE INFILATOR.
  • Development for license/de-license area in CNG station with chain link fencing& rcc wall ,approach road ,forecourt with proper slope control
  • Drafting For Construction Drawing using AUTOCAD Pertaining To CNG Station Development
  • Preparation of steel routing, PE networking, CNG station layout drawing for PESO approval as per OISD-179 & gas cylinder rule, above ground piping & Tubing drawing in CNG stations etc
  • Checked & Made Approval For Concrete Mix Design As Per Is 10262 After Cube Compressive Strength Testing
  • Analysis Of Geo Technical Report As Per Is 6403
  • Preliminary Survey:
  • Surveying Of Plot For The CNG Station With Co Ordinate Which Is Awarded For the Project Including Of Bore Log Details For Post Engineering
  • Liasoning:
  • Approaching to the concern authorities under whom the pipeline area covers target the permission for laying the pipeline
  • Planning:
  • Project Planning, Monitoring and progress tracking
  • Planning of Project Activities as per Project approved plan or work schedule
  • Preparing Daily reports (DPR), Weekly progress report (WPR), Fortnight Progress and Monthly progress Report (MPR) and making analysis of planned schedule with actual progress and submit reports to clients for review
  • Coordination with Client and Contractors for work Progress and follow up with contractors on their commitment to fulfill in time with tracking in line of their submitted work schedule
  • Certifying RA and final bills as per Physical progress of contractor's to make a good flow or rotation of money in Project Assist
  • Project Management team from site level on technical and inputs data for Initiation, Planning, and execution, tracking and closing of projects
  • Execution periodic progress reviews, cost tracking, chasing up engineering,deliveries, erection and commissioning activities, internal and external
  • Topographical Survey, Geo-Technical Survey, Co-Ordination & Technical Supports To Clients And Contractors For Suitable Plot Development As Per Physical Site Condition On Different Station Like CGS ,Mother, Online, Daughter Booster With Taking In Sense Of Technical Codes
  • Execution & Quality Assurance
  • Execution Of Office Cum Control Room Building With Electrical Control Panel For Online CNG Station At ADITYAPUR for GAIL GAS LIMITED with Proven abilities in developing and deploying best-in-class processes for executing projects through productivity management, efficiency improvement and time reduction initiatives
  • Demonstrated competencies in multi-tasking and meeting aggressive deadlines and budget and Coordinate a multidisciplinary team as the Base in Charge to ensure that the milestones at site are achieved on time.

Site Engineer

VISION ENTERPRISES
ODISHA
05.2017 - 12.2017
  • CGD Project work.
  • LDPL Project work
  • Determined budget, manpower, schedule and material needed to successfully execute projects.
  • Adhered to timelines to meet quality assurance targets.
  • Assessed scope and requirements to assist with project design determinations.
  • Assisted in development, design and execution of projects.

Skills

55Yearsundefined

Certification

B.TECH. (CIVIL Engineering) From KIIT UNIVERSITY , BHUBANESWAR In 2017 With CGPA: 6.29 CGPA

Timeline

Assistant Project Engineer

MECON LTD
01.2019 - Current

Assistant Project Engineer

Gail GAS LIMITED
01.2019 - Current

Supervision Of Machine Foundation, Static Load Carrying Foundation
12.2018

Site Engineer

VISION ENTERPRISES
05.2017 - 12.2017

B.TECH. (CIVIL Engineering) From KIIT UNIVERSITY , BHUBANESWAR In 2017 With CGPA: 6.29 CGPA

05-2017

10+2 From (BSEB) BIHAR In 2013 With 68% Marks.

04-2013

PROJECTHIGH SCHOOL DOMANDIH(JSEB BOARD) in 2010 with 72 % marks

05-2010

Individually Handed All GA's Which Is Awarded To MECON Limited
AKHIL KUMAR JHACIVIL ENGINEER