Strategic leader with a track record of launching manufacturing plants under budget and ahead of schedule. Expertise in managing multi-million dollar budgets while achieving notable cost reductions and enhancing operational efficiency. Proven success in guiding teams to exceed performance metrics in fast-paced, high-pressure settings.

Overview

32
32
years of professional experience

Work History

Director Of Operations

Resia Manufacturing LLC
Fairburn
2023.11 - Current
  • Lead a cross functional, collaborative team tasked with launching a greenfield plant in the modular construction industry.
  • Plant launch timing: 6 months (27 wks.) from empty warehouse to producing saleable units (bathroom & kitchen PODs)
  • Tasked with managing tooling/equipment integrators and $18M CAPEX budget.
  • Installation delivered on schedule at 17% under budget.
  • Helped to develop and manage a $10M annual operating budget.
  • Responsible for guiding, developing, and maintaining steady state business strategy (PSQRC)
  • 255K sq ft facility, 90 salary and hourly employees (Semi and Fully Automated Cells + Manual Assy Lines)
  • 2024 to 2025 Cost Reductions and Efficiency Gains
  • Reduced Labor by 43% to match demand
  • Reduced G&A Expenses by 21% and OOE by 36%
  • Eliminated unscheduled overtime (OT)
  • Reduced outbound shipping costs by 25%
  • 100% on time deliveries

General Manager

Photon Automation Inc.
Indianapolis
2020.06 - 2023.11
  • Lead a cross functional team involving innovative laser welding technology in the Energy Storage System (ESS) sector.
  • Collaborated with start-up Electric Vehicle (EV) and Grid Storage companies to quickly react to rising demand.
  • Helped oversee large machine tool integration projects from $1M - $53M, including complete assembly lines.
  • KPI’s related to performance milestones: Performance, Time, Quality, and Cost metrics based on milestone achievement
  • Helped to oversee daily operations of a 225K sq. ft. facility including 65 salary and hourly employees.
  • Tasked with steering a small, niche business through rapid, triple digit growth.
  • Responsible for running day-to-day operations and guiding general business strategy.
  • Oversee strategic hiring, tracking cash flow, and setting sales goals for the team.
  • Developing key performance goals and managing the performance of staff
  • Creating and implementing strategies for rapid business growth
  • Helped develop internal processes for better productivity.

Plant Manager

Rivian Automotive LLC
Normal
2017.11 - 2020.06
  • Helped oversee commissioning of a 2.6M sq. ft. facility.
  • Responsible for hourly and salary workforce planning for 6/2021 Start of Production (SOP)
  • Developed EHPV template to forecast hourly staffing.
  • Helped develop conveyance layout in Final Assembly
  • Responsible for commissioning and managing the building including: Stamping, Body, Paint, Final Assembly, Energy Storage (Battery) & Propulsion, and Quality
  • Budget: ~$1B CAPEX including conveyance and process tooling
  • Project Scope: transforming a car plant into a truck plant (complete demolition of old equipment and installation of new equipment)
  • Participated in vertical integration studies (Make vs. Buy) of non-traditional automotive components including 'Skateboard' Frame, Battery Frame, Energy Storage System (ESS), Propulsion, Inverter
  • Helped lead a cross functional team to develop policies including but not limited to Attendance Policy, Hourly Wage Structure, Hiring Process, People Movement Policy, Apprentice Program, Lean Training (Team Based), Obeya Training, PSQRCE & 5S Training.
  • Responsible for weekly Launch Readiness Meeting (Obeya): 22 segments of the company involved, including the base departments of the plant.
  • Exception based report outs (red items): Scope, Status, External Dependencies, Risks, Schedule, Open Issues, Major Decisions, A3, Team Health

Assistant Plant Manager / Production Control Manager, Mercedes Benz R-Class

AM General Commercial Assembly Plant
Mishawaka
2015.10 - 2017.11
  • Help oversee daily operations of a 750K sq. ft. facility including 350 UAW and 65 salary Team Members
  • Responsible for the daily production schedule including customer interface.
  • Responsible for plant production metrics (PSQRC)
  • Responsible for implementing and maintaining the Manufacturing Operating System (MOS)
  • Joint management of inbound and outbound logistics (MBUSI, W.W. Williams, Schneider National) with goal of maintaining 1.5 DOH inventory levels

Program Manager MV-1, Launch Manager (Advanced Manufacturing Engineering Specialist)

AM General Commercial Assembly Plant
Mishawaka
2012.06 - 2015.10
  • Actively involved in creating Business Development Studies, including program parameters, plant modifications or new locations, estimated labor, and capital investment
  • Responsible for developing business cases including relationship model and RASIC.
  • Interact with customers for product and program information as well as process changes (layout, flow, equipment, etc.)
  • Mobility Ventures LLC start-up and MV-1 Re-launch – 9/2013 – 10/2015
  • Led initial planning meetings during asset acquisition (maintained Gantt Chart)
  • Assigned to team responsible for re-engaging supply base and Engineering Service Provider (ESP)
  • Participated in Bid Pack preparation and eventual ESP contract negotiation and award.
  • Led MY2014 Emissions Certification
  • Prepared Tail Pipe Emissions and OBD Certification applications for CARB and EPA
  • Submitted automated (on-line) application for both agencies.
  • Supervised and interacted with consultants to streamline process and meet program objectives (obtained certifications prior to Ship to Commerce date)
  • Co-led oversight of MY2015 Emissions & Certification – resident at Westport Fuel Systems Inc, Plymouth, MI
  • Participated in decision to move certification activities from Westport to Badillo Engineering
  • MV1 Program Manager

GA Area Manager – GM Hummer H2 / VPG MV-1

AM General Commercial Assembly Plant
Mishawaka
2007.07 - 2012.06
  • Took over GA management functions during the 2008 H2 MCE Launch
  • Worked with Group Leader’s, Shift Leader, and Team Leader’s to identify key bottlenecks.
  • Worked with plant IE and UAW Time Study rep to settle disputed jobs.
  • Strategically added labor and re-organized GLs to stabilize production and ensure quality metrics were met.
  • Developed year to year department Business Plan Deployment (BPD)
  • GA consistently met performance objectives documented by monthly scorecard.
  • Led GA team through final two D-Rates and eventual balance out of the H2 program (1/2009)

Plant Planner / Plant Scheduling Manager – GM Hummer H2

AM General Commercial Assembly Plant
Mishawaka
2005.06 - 2007.07
  • Plant Launch Manager – MY2008 Hummer H2 Mid-Cycle Enhancement (MCE)
  • Led dept. planners to ensure manufacturing readiness for capacity changes (D-Rates) & vehicle launches.
  • Coordinated Operations Plans, Launch Events, Plant Capacity Changes, & Future Ops Scenarios
  • Direct interface for plant coordination with GM Scheduling (MSO), Order Fulfillment, Mfg. Strategy (PET Team), & Vehicle Engineering organizations (CRDN)
  • Direct interface with GM GLP Launch Team and GM counterpart.
  • Led transition from PPO to plant and integrated MVB schedule with current production.
  • Coordinated daily wrap-up meetings for PIT and IRT report outs per GLP Launch template during pre-production builds (PNS, PS, SOP, SORP).
  • Led cross-functional AMG team to automate GM Yellow Card process to streamline PIT team problem solving.

General Assembly Shift Leader – GM Hummer H2

AM General Commercial Assembly Plant
Mishawaka
2002.07 - 2005.05
  • Responsible for startup of H2 2nd Shift Launch (six months after initial launch)
  • Responsible for the hourly and salary staff attendance and the daily production & quality of vehicles
  • Aid in setting up and maintaining the safety standards in the production environment while ensuring all employees adhere to those standards.
  • Report out daily performance numbers in the morning executive staff meeting and ensure we meet or exceed our customers’ expectations in build and quality metrics.
  • Monitor the cost of the General Assembly department from scrap rate to over-the-counter crib stock purchases.
  • Promote a strong team-based environment with emphasis on improving morale and responsiveness to address production needs.

General Assembly Launch Manager – GM Hummer H2

AM General Commercial Assembly Plant
Mishawaka
2001.07 - 2002.07
  • Relocated to PPO (Pontiac Validation Center and Troy Tech Park) as a member of the H2 Launch Team
  • Supervised a small team of 7 hourly and 4 salary during pre-production builds (IVER and VAL events)
  • Worked with contractor (DSI) to define & validate the layered build through the Virtual Build Process
  • Helped set up workforce needs based on the forecast of work required to build new product.
  • Helped organize plant needs for tooling fixtures, line side presentation, and plant readiness.
  • Directly interfaced with CAP Operator Support Center (OSC) and Simulated Work Environment (SWE)
  • Led GA launch team during 1st PVB event in new assembly plant (Greenfield Site)
  • Coached team on standardized work creation, implementing the latest lean standards (GMS)

Final Assembly Senior Tooling Engineer

Ford Motor Company
Atlanta
1999.01 - 2001.01
  • Responsible for all tooling (non-conveyance) including Fluid Fills, Assist Devices, Synchronous Man Carriers, Torque Multi-spindle Nut Runners, Gauges, Alignment / DVT (mechanical only)
  • Direct interface with Ford Corporate Integration Team
  • Supervised plant project team and tooling suppliers during installation of new equipment for New Model Launch
  • Final Area certified safety representative (GRASP program) including machine placards, Lock Out Tag Out procedure and skilled trades safety training and certification.
  • Final Area representative for Global Six Sigma Certification
  • 6 months of classroom training at Ford Dearborn Training Center
  • Certified through 6 Sigma Academy LLC
  • Project objective to reduce or eliminate 3-6 month in service warranty claims for Tire Vibration
  • Project allowed the plant to upgrade Tire Mounter, Soaper, Matcher, and Balancer ($2.25 mil)

Trim Department Lead Production Engineer

Ford Motor Company
Atlanta
1998.01 - 1999.01
  • Department Launch Leader for MY2000 D186 Launch
  • Direct interface with Design Engineers and Corporate Launch Team
  • Responsible for incorporating new parts and processes into existing shop.
  • Responsible for developing year to year workforce rebalance package (3-5% task reduction per year)
  • Direct interface with UAW Standards Representative
  • Responsible for writing and managing cost savings projects including automating manual processes, synchronous man carriers, and material handling equipment ($2-5 mil/yr depending on the year)
  • Responsible for 211 workstations including in-station documentation, standard time allocation (TAKT), and ergonomic solutions.
  • Responsible for all Final Assembly (Trim and Chassis) on the night shift
  • Final Assembly Department Lead for ISO and Delta Torque compliance

Trim Department Production Engineer

Ford Motor Company
Atlanta
1994.01 - 1997.01
  • Conducted time studies to identify efficiency gaps in main and secondary production lines.
  • New product line set-up for job processes during DN101 product launch
  • Balanced work among employees to achieve production rate while maintaining high quality standards.
  • Contributed as PDT team member to problem solving, cost reduction initiatives, and quality improvement efforts.
  • 6-month temporary assignment to assist the 1998 Ford Windstar Launch in Oakville Ontario Canada

Education

Master of Science - Industrial Engineering

Purdue University School of Technology
West Lafayette, IN
1992-01

Bachelor of Science Degree - Manufacturing Engineering and Production Supervision

Purdue University School of Technology
West Lafayette, IN
1990-01

Skills

  • Project management
  • Budget management
  • Cost estimation
  • Cost control
  • Performance metrics
  • Risk mitigation
  • Operational efficiency
  • Process optimization
  • Project launch
  • Production scheduling
  • Manufacturing engineering expertise
  • Strategic planning
  • Schedule oversight
  • Fractional leadership
  • Project methodologies
  • Tooling integration
  • Risk mitigation
  • Workforce planning
  • Fractional leadership solutions
  • Microsoft Office and Project proficiency
  • Performance analysis
  • Capital spending

Additional Information

  • Positive motivator and able to instill pride through positive results.
  • Analytical and logical thinking problem-solver who achieves results through defining the total problem and resolves in the most cost-effective manner without sacrificing quality.
  • Possesses a strong work ethic, enjoys challenges, and takes pride in exceeding expectations.

Timeline

Director Of Operations

Resia Manufacturing LLC
2023.11 - Current

General Manager

Photon Automation Inc.
2020.06 - 2023.11

Plant Manager

Rivian Automotive LLC
2017.11 - 2020.06

Assistant Plant Manager / Production Control Manager, Mercedes Benz R-Class

AM General Commercial Assembly Plant
2015.10 - 2017.11

Program Manager MV-1, Launch Manager (Advanced Manufacturing Engineering Specialist)

AM General Commercial Assembly Plant
2012.06 - 2015.10

GA Area Manager – GM Hummer H2 / VPG MV-1

AM General Commercial Assembly Plant
2007.07 - 2012.06

Plant Planner / Plant Scheduling Manager – GM Hummer H2

AM General Commercial Assembly Plant
2005.06 - 2007.07

General Assembly Shift Leader – GM Hummer H2

AM General Commercial Assembly Plant
2002.07 - 2005.05

General Assembly Launch Manager – GM Hummer H2

AM General Commercial Assembly Plant
2001.07 - 2002.07

Final Assembly Senior Tooling Engineer

Ford Motor Company
1999.01 - 2001.01

Trim Department Lead Production Engineer

Ford Motor Company
1998.01 - 1999.01

Trim Department Production Engineer

Ford Motor Company
1994.01 - 1997.01

Master of Science - Industrial Engineering

Purdue University School of Technology

Bachelor of Science Degree - Manufacturing Engineering and Production Supervision

Purdue University School of Technology
Kipp A. Koonce