Summary
Overview
Work History
Education
Skills
Certification
Work Availability
Overseas Accomplishments
Quote
Timeline
Generic
Kiran GS

Kiran GS

Mechanical Engineering
Bengaluru,KA

Summary

Accomplished Manager with 21 years of experience consistently rising through ranks. Well-versed in Mechanical Design, Process Planning, Project Execution and Project Engineering, Recourse Planning and Project Planning. Dedicated to complete knowledge of company products and services for optimized customer service.

Overview

7
7
Certifications
22
22
years of professional experience

Work History

Project Manager

Fowler Westrup India Pvt Ltd. (Westrup A/s)
Bangalore / Denmark, Karnataka
02.2013 - Current
  • Developed and initiated projects, including managing costs, schedule and performance.
  • Provided accurate, detailed quantity take-offs from project drawings and technical specifications.
  • Orchestrated projects within strict timeframes and budget constraints by solving complex problems and working closely with senior leaders.
  • Eliminated discrepancies by reviewing performance, status and safety adherence.
  • Managed all phases of $12 million project from procurement to commission.
  • Oversaw projects for Seed processing by planning, designing, resource managing and scheduling.
  • Headed 10 project teams specializing in seed processing and design activities.
  • Identified plans and resources required to meet project goals and objectives by setting realistic timelines and checkpoints.
  • Increased productivity by standardizing the methods of projects like Design hand book, standardizing on design methods with top down approach, standardizing the service platforms of the plant, streamline and standardizing the schematic flow diagrams.

Assistant Manager

Tyco Electronics, TE Connectivity / AMP
Bangalore, Karnataka
03.2004 - 02.2013
  • Achieved recognition from senior management for contribution to store success, including managing sales, employees and operations to foster optimal performance.
  • Developed loyal and highly satisfied customer base through proactive management of team customer service strategies.
  • Devised, deployed and monitored processes to boost long-term business success and increase profit levels.
  • Exceeded sales goals and accomplished business objectives by inspiring staff and promoting target products.
  • Planned team-building exercises to increase employee performance and job satisfaction.
  • Set and enforced policies focused on increasing team productivity and strengthening operational efficiency.
  • Assessed job applications and made hiring recommendations to bring in top candidates for key vacancies.
  • Developed and established connector assembly line with APQP and TS 16949 standards.
  • Head of tool assembly shop for assembly line.
  • Designed and delegated assembly precession tooling, which involve high precession tooling, moulded components and stamped components.
  • Major and the only available Pneumatic circuit designer and implementor for the whole of the plant.

Engineer

Rane Madras Ltd, Mysore
Mysore, Karnataka
10.1999 - 03.2004
  • Design of SPM, Design of steering gear assembly line, ISO 9000, Pre Engineering, Sub Supplier Co-ordination, Tool room in charge and co- ordinate.
  • Key Initiatives: - Tool Design of Jigs and Fixtures for steering gears.
  • Design of gauges - Design of Special purpose machine.
  • Steering gear assembly line design and establishment - which increased the productivity by almost 50%
  • Developed and converted or retrofitted a german machine to produce variable ratio gear and also participated in increasing the production of gear from 04 no per shift to 20 no per shift.
  • Process Improvements: Participate and implement Kazan, quality circle and president awards for process improvements, Involve in TPM activities.
  • Process Engineering: Process engineering / manufacturing engineering support for production.
  • Pneumatics: Design of Pneumatic circuits for Assembly tools along with different product identifying on pneumatics for easy procurement, economy and standardization.
  • Performed on-site field surveys and wrote technical narratives to document processes and design changes.
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components and systems.
  • Devised overall strategy for documentation and identified design sets planned for each stage of work including as-built designs and final building information models (BIM).

Education

Advance Diploma - computer Integrated manufacturing

IGNOU

Diploma - computer Integrated manufacturing

IGNOU

Diploma DTDM - undefined

GTTC

Diploma - Tool and Die Making

Skills

Product Developmentundefined

Certification

Awards / Training: -

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Overseas Accomplishments

- May 2007, UK, For product transfer and establishing the same line in India

- May 2008, China, Product and technology transfer for battery connector product.

- Nov 2012, Singapore, Validation of complete automation line for connector assembly.

- Aug 2013 till 2019 every year to Denmark for about 30 days each time for project execution.

- Jun 2014 and Mar 2015, Vietnam for contract signing and execution of rice processing plant.

Quote

There is a powerful driving force inside every human being that, once unleashed, can make any vision, dream, or desire a reality.
Tony Robbins

Timeline

Project Manager

Fowler Westrup India Pvt Ltd. (Westrup A/s)
02.2013 - Current

Assistant Manager

Tyco Electronics, TE Connectivity / AMP
03.2004 - 02.2013

Engineer

Rane Madras Ltd, Mysore
10.1999 - 03.2004

Diploma - Tool and Die Making

Diploma DTDM - undefined

GTTC

Diploma - computer Integrated manufacturing

IGNOU

Advance Diploma - computer Integrated manufacturing

IGNOU
Kiran GSMechanical Engineering