Dynamic Civil General Foreman with a proven track record at Patel Engineering Ltd, excelling in team leadership and project management. Achieved timely project completions through effective resource allocation and enhanced operational efficiency. Skilled in equipment operation and adept at fostering strong communication, ensuring client satisfaction and successful project outcomes.
Work as a Civil forman at Tala Hydro project Bhutan
Open canals (or open channels) are unlined or lined channels that convey water by gravity from a river or reservoir to the intake or forebay of a hydroelectric power station.
Penstocks are pressurized pipelines that carry water from a surge tank or forebay to the turbines. They are usually made of steel or concrete.
Tunnel Excavation in Hydroelectric Projects
Underground Intake Work in Tunnel – Hydroelectric Projects