MS Excel, MS Word, MS Power Point, AutoCAD, PDMS
1) Combustion modification with inclusion of RLNG firing (Low-Nox) in Boiler #1, 2, 3 at CPCL, Manali
2) IOCL Barauni - resolving the vibration issue of CO Boiler with introduction of Economizer Bypass duct & Economizer modification
3) Reliance Vadodara - Renovation of Boiler #4 & 5
4) Torrent Power, Ahmedabad - APH & ducting replacement
1) NTPC Rihand Stage-I (2x500 MW units) - replacement of old BRM Mills (12E10) with new HP 1003 Mills.
2) JSW Bellary BF#3 - upgradation of existng XRS-1003 mills
3) Mill Capacity restoration in XRP 803 Mill at Aditya Alumina, Lapanga
Major NPI projects -
1) Low-cost HP 803 Mill design development
2) Low-cost Journal Assembly design development for XRP/XRS Mills
3) Tilt-in/Tilt-out Arrangement for XRP/XRS Mills
4) New Sealing System for XRP/XRS Mills
1) NPCIL Kakrapar #3&4 (2x700 MW) Nuclear Power Plant - Conceptual Arrangement & Piping layout for Conventional Island (Turbine Hall)
1) Pembroke 5 x KA26 (2150 MW) Combined Cycle Power Plant, U.K.
2) Aghada 1 x KA26 (400 MW) Combined Cycle Power Plant, Ireland
3) Kestrel-2 2 x KA13-1 (500 MW) Combined Cycle Power Plant, Dubai
1) Scandale 2 x KA26 (800 MW) Cogeneration Plant, Italy
2) Kaeng Khoi 2 x KA26-2-1600 MW Combined Cycle Power Plant, Thailand
Worked as Mechanical Design Engineer performing the following responsibilities -
Technical reporting
undefined1) Patenting of 'PULVERIZER MILLING CAPACITY RESTORATION' - GE Power
2) Development of 'Tilt-in/Tilt-out Arrangement for XRP/XRS type Bowl Mills' and 'Low-cost design of Journal Assembly for XRP Mills' which will be applied for patenting soon.
3) Successful completion of CPCL RLNG Firing conversion project as project Engineering Manager which is a FOAK type project.
MS Excel, MS Word, MS Power Point, AutoCAD, PDMS
Love to play Tabla (an Indian percussion) and other percussion instruments.