Summary
Overview
Work History
Education
Skills
Websites
Locations
Timeline
Generic

KOUSIK MIDYA

Haldia

Summary

CONTROL ROOM DCS OPERATION ENGINEER" gas base Combined Cycle Power Plant 225x2 MW (IPP)& Thermal Power Plant 150x1 MW & 60X2 MW (IPP), Coal Base CFBC Boiler & turbine DCS Operation

Overview

14
14
years of professional experience

Work History

Control Room DCS Engineer

OMS Private Limited, Sravanthi Energy Private Lmited
03.2024 - Current
  • Position : Control Room DCS Engineer, Combined Cycle Power Plant 225x2 MW, GAS TURBINE GE 6FA - 76.5 X 4 MW, HRSG 110X4 TPH, Steam Turbine 72.0 X 2 MW Operation, HP & LP Bypass system, Cooling Water system, Emergency handling.

Control Room DCS Engineer

Cambodian Energy Limited
12.2017 - 12.2023
  • Played a key role in commissioning, Boiler light-up ( cold & hot light- up), Operation, trouble soothe of CFBC Boiler 462x1 TPH & 250X2 TPH
  • Turbine start up & operation
  • Inspected plant activities on screens and computers to identify and troubleshoot issues
  • Flow meter counts, line pressures and temperatures for maximum equipment capacity
  • Entrusted with the responsibility of Electrostatic precipitator, Close Circuit Cooling Water (CCCW) system, Once Through Cooling Water ( OTCW) system
  • Reported complex issues and conditions to management for specialized diagnosis and repair
  • Running equipment change over to stand by equipment according to change over schedule, safe operating conditions and cost-efficient operations
  • Conduct root cause analysis on equipment failures, equipment performance improvements
  • Applied performance test result & predictive maintenance result to accurately provide equipment health in order to eliminate equipment failures.

Boiler & Utility DCS Operator

Petroleum Coke Industries Company
03.2014 - 10.2016
  • 132 TPH HRSG Boiler start up & operation
  • Conducted root cause analysis & equipment performance improvements.

Boiler & Turbine DCS Operator

Shree Renuka Sugars LTD
10.2012 - 03.2014
  • 90 TPH AFBC Boiler Light Up
  • Boiler DCS Operation
  • Turbine Start Up
  • Turbine DCS Operation.

Boiler & Turbine DCS Operator

Corporate Ispat & Alloys LTD
02.2012 - 11.2012
  • CFBC Boiler 105 TPH, Light Up
  • CFBC Boiler DCS Operation
  • AFBC Boiler 48 TPH Light Up
  • AFBC Boiler 48 TPH, DCS Operation 25 MW Turbine DCS Operation.

Boiler & Turbine DCS Operator

Shree Renuka Sugars LTD
04.2010 - 02.2012
  • AFBC Boiler DCS Operation, 90 TPH
  • Turbine 17 MW DCS Operation.

Education

Diploma In Mechanical Engineering (75% Marks) -

Institute Of Science & Technology - Chandrakona, Paschim Medinipur

Higher Secondary 12th - undefined

Chakdwipa High School - Haldia

Skills

Combined Cycle Power Plant start up

undefined

Locations

  • Haldia, West Bengal, 721645
  • India

Timeline

Control Room DCS Engineer

OMS Private Limited, Sravanthi Energy Private Lmited
03.2024 - Current

Control Room DCS Engineer

Cambodian Energy Limited
12.2017 - 12.2023

Boiler & Utility DCS Operator

Petroleum Coke Industries Company
03.2014 - 10.2016

Boiler & Turbine DCS Operator

Shree Renuka Sugars LTD
10.2012 - 03.2014

Boiler & Turbine DCS Operator

Corporate Ispat & Alloys LTD
02.2012 - 11.2012

Boiler & Turbine DCS Operator

Shree Renuka Sugars LTD
04.2010 - 02.2012

Diploma In Mechanical Engineering (75% Marks) -

Institute Of Science & Technology - Chandrakona, Paschim Medinipur

Higher Secondary 12th - undefined

Chakdwipa High School - Haldia
KOUSIK MIDYA