With over 20 years of experience in railway signaling, I possess extensive expertise in managing and executing complex signaling projects. My background includes proficiency in AFTC track circuits, from design review to installation, testing, and commissioning. I excel in project planning, budgeting, and resource management, ensuring timely and efficient project delivery. My skills extend to client relations, including billing and interface meetings, as well as project monitoring, material reconciliation, and successful project handovers.
Design Responsibilities
1. Preparation of necessary drawings related to project like CCP,CRP,TBP,SIP,TOC,Application Logic circuit & Interface circuit with the help of design team.
2. Verification of all drawing and submission to client to get approval.
3. Final as made preparation and submission to client & Railways.
4. Motivating and encouraging internal and external design teams
5. Ensuring drawings and designs are produced on time, to a high quality, and are easy to decipher.
6. Overseeing the design process using technical expertise.
7. Working with clients to ensure that their expectations are met.
8. Reviewing designs with health and safety in mind. Material Procurement
1. Raising Procurement request of all BOQ Materials through SAP with the help of Planning team.
2. Responsible for supply BOQ materials with the help of procurement team.
3. Regularly conducting meeting with Procurement team and delivery the materials in time.
4. Preparation of call letter with specification and getting approval from client for inspection of materials (RDSO, RITES).
5. Necessary drawing preparation for materials inspection and getting approval from client.
6. After receiving materials, inspect the materials as per specification.
7. Materials inspection with client and submit necessary documents for client billing.
8. Stacking materials and maintaining material register to handle with the help of store team.
9. Physical stock verification with the help of store team.
10. Maintaining material reconciliation with the help of project engineer. Execution:
1. Delivery the project with QCD
2. Progressing and Monitoring of S&T related works up to commissioning.
3. Ensuring EHS rule applying in outdoor & Indoor activities.
4. Coordinating with safety manager and maintaining safety parameter in all S&T activities.
5. Weekly basis conducting TSV (Team safety visit)with EHS team and checking Safety parameters like ensuring PPE,TBT, LMRA and FPP.
6. Site survey with client and finalize the cable route to start trenching works.
7. Marking of Signal and Location Box with client
8. Glued Joint Marking with all Department like OHE, PWAY.
9. Coordination with other department and Plan the sequence of work without Hampering S&T works.
10. Leading, Organizing and Guiding Project engineer to progress the work as per target.
11. Monitoring and Installation of S&T Outdoor like signals, Location Box, Point machine, Axle counter, Block Instrument, Track circuits, Relay frame as per the SIP and CCP.
12. Monitoring and Installation of S&T Indoor Gears like IPS, Data Logger, K RACK, Relay Rack, VDU Table, Battery, Telecom equipments, Block instruments as per client requirement and approved Plan.
13. Marking and installation of Conventional earthing and Maintenance free earthing for S&T Gears.
14. Monitoring and Installation of LC gate interlocking works in Midsection as well as station.
15. Responsible for technical contractual scope of the project.
16. Responsible for fulfill of customer requirement of the project.
17. Identifying additional scope of activity in schedule item, allocated additional budget and Getting approval from Management.
18. Identifying and and ensuring requirement of design as per division practice of the project.
19. Coordination with Indoor Execution Agency and Client to get necessary approval for indoor activities like TSAA , Indoor Layout plan, TOC, Interface circuits and Application Logic circuits.
20. Responsibility of Client billing and subcontractor billing regular basis to maintain cashflow to subcontractor as well as Management.
21. Material assessment and getting approval from client the same will be raising MR, follow-up of PO, Call letter and delivery of material to site as per the requirement.
22. Arranging of vendor code, work order approval, certification of s/c executed work and payment
to subcontractors.
23. Preparation of Material Reconciliation, Paid Vs Claim reconciliation.
M/s. ETOE Rail, 35 crore, Arakkonam yard Modification work/ Southern Railway/ Chennai Division M/s. Kiran infra engineers Limited, 220 Crore, ARI- DHO 3rd Line Railway Project/ North Central Railway/Jhansi Division KEC International Limited, 185 Crore, Railway Doubling Project NCJ- MEJ Doubling Project/NCJ Division M/s. Kiran infra engineers Limited, 35 crore, RE Electrification Project VM-CUPJ-MV-TJ-TVR section/TPJ Division
Design Responsibilities Material Procurement Responsibilities.
Execution Responsibilities
07067537723, 9787000908