Results-driven Survey Manager adept at leading teams to complete projects with high productivity and efficiency. Skilled in geospatial analysis, data interpretation, and project management. Excel in communication, leadership, and problem-solving to deliver outstanding results.
UPGRADATION OF MP/RJ BORDER-SHEOPUR-GORAS ROAD SECTION OF NH-552 EXTN, FROM DESIGN CH. 0.00 TO 48.400 TO TWO LANE WITH PAVED SHOULDER CONFIGURATION ALONG WITH ONE TIME IMPROVEMENT OF 16.6 KM IN THE STATE OF MADHYA PRADESH.
Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner Ghat(between Indore to Khalaghat Section from existing Km 59+190 to Km 66+120) of NH 52 (Old NH 3) on EPC mode in the State of Madhya Pradesh
Construction of New Four lane of Sundar Nagar Bypass from Existing
Km.173.900 to Km.179.600 of NH21 (Design Chainage : Km.0.000 To
Km.6.680) in the State of Himachal Pradesh on EPC Mode