Summary
Overview
Work History
Education
Skills
EXTRA CURRICULAR ACTIVITIES
TRAINING / INTERNSHIP
JOB RESPONSIBILITIES
Timeline
Generic
Krishna Sharma

Krishna Sharma

Engineer Civil
Guwahati

Summary

Driven with robust background in civil engineering project management. Successfully managed complex infrastructure projects, ensuring timely completion and adherence to budget constraints. Demonstrated expertise in coordinating multidisciplinary teams and leveraging problem-solving skills to overcome project challenges.

Overview

1
1
Language
12
12
years of professional experience

Work History

Technical Consultant (Civil)

GBSIPRD Assam
12.2019 - Current
  • Supervision of Building Construction work at HQ campus and allotted Districts.
  • Developed detailed estimates for civil works to ensure accurate budgeting and resource allocation.
  • Coordinated tendering process for civil works, enhancing project selection and contractor engagement.
  • Performed regular maintenance tasks at HQ campus to ensure optimal functionality.
  • Conducted maintenance on tools and equipment at HQ campus to ensure proper operation.
  • Created detailed billing documents for construction projects to facilitate accurate payments.
  • Supervised building construction at HQ campus and assigned districts, ensuring compliance with safety standards and project timelines.
  • Total Work Experience- 9 years 1 month.

Transformation Manager

OYO Rooms Guwahati Hub
03.2019 - 12.2019
  • Conducted audit of building for potential hotel conversion.
  • Supervision of construction of Building as per the standards of organisation.
  • Developed budget plan for building transformation.
  • Supervised construction of building according to organizational standards.
  • Alignment of vendor and all stakeholders for construction and transformation of building.

Assistant Manager

Gammon Engineering and Contractors Pvt Ltd
11.2017 - 02.2019
  • Constructed main tunnel (dia 8.2) and escape tunnel (dia 5.8), totaling 10 km in length.
  • Applied NATM technique in T-48R using drilling and blasting for excavation.
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Improved customer satisfaction by addressing and resolving complaints promptly.
  • Developed strong working relationships with staff, fostering a positive work environment.

Project Engineer (CIVIL)

PATEL ENGINEERING LIMITED
06.2017 - 11.2017
  • Supervised site activities to ensure compliance with safety regulations and project specifications.
  • Rib erection/Lattice girder erection, Shotcreting, Wiremess fixing, Rock Bolting (SDR & SN & swellex) & Grouting etc.
  • Blast Monitoring to minimize the overbreak , and optimise the blast with less Specific Charge and Powder Factor.
  • Monitored blasts to minimize overbreak and optimize charge and powder factor.
  • Ensured quality compliance across all support systems.
  • Optimized cycle time by concurrently planning activities with a focus on safety.
  • Hindrance Report.
  • Compiled hindrance reports to identify issues affecting project progress and workflow.
  • Site supervision.

Junior Research Fellow

INDIAN INSTITUTE OF TECHNOLOGY GUWAHATI
06.2014 - 06.2015
  • Learned Q GIS and ARC GIS while preparing and planning the Guwahati City Master Plan 2025.
  • Managed laboratory resources efficiently, ensuring timely completion of experiments and projects.
  • Enhanced overall efficiency within the lab setting through active participation in performance improvement initiatives.
  • Maintained accurate records of experiments and results, ensuring reliability and replicability in future studies.

Education

M.Tech - TUST

IIT(ISM) Dhanbad
Dhanbad
01-2017

B.Tech - CIVIL

SIKKIM MANIPAL UNIVERSITY
Rangpo, East Sikkim
01-2013

X - undefined

K.V I.O.C.L Guwahati Refinery
Guwahati
01-2009

High School - undefined

K.V N.H.P.C Dhemaji
Dhemaji
01-2007

Skills

ETABS, STAAD PRO

Windows operating systems

Structural analysis

Microsoft Office 2007

EXTRA CURRICULAR ACTIVITIES

Represented as Member of CESA for the season 20011-13 of Civil Engineering Department. Elected as Training and Placement Representative of Civil Engineering Department in SMIT, Rangpo 2012-13 Represented as Member of CESA for the season 20011-13 of Civil Engineering Department. Elected as Training and Placement Representative of Civil Engineering Department in SMIT, Rangpo 2012-13

TRAINING / INTERNSHIP

  • B.TECH Training/ Internship.
  • 4th Sem. Summer Project in Kolkata Metropolitan water and sanitation Authority.
  • 6th Sem. Industrial Training in N.H.P.C Lower Subansiri Hydroelectric Project.
  • 8th Sem. Major Project in G.K Infratech in Road Construction Project Kolkata (I was offered job during my internship).
  • M.TECH Training/ Internship.
  • 3rd Sem. Internship in IL&FS KNCEL Project Sundernagar Himachal Pradesh T1 P1. I was involved in Design, Planning, Execution and Monitoring work of Tunnel 1.

JOB RESPONSIBILITIES

  • As a Graduate Engineer Trainee (Civil):
  • Billing Planning and Execution Dept. (G.K INFRA TECH 4 months)
  • Knowledge of Contracts and Writing Contractual Letters
  • Preparing Targets, Hindrance Reports
  • Preparing Client Bill, Escalation Bill
  • Preparing Daily Progress Reports.
  • Preparing documentation on variance between submitted Client R.A. Bill and Certified R.A bill on quantities, rates or interpretation of clauses.
  • Levelling using Auto level for checking the accuracy of work.
  • Execution of road construction works as per Drawing.
  • As a Field Engineer (Civil): (1st August 2013 to 31st January 2014)
  • Execution Dept. (ANPL-MPA JV 6 months)
  • Site Supervision
  • Preparing PRW bill & Client Bill.
  • Monthly material reconciliation.
  • Preparing weekly/ Monthly target, material requirement & submitted to Project- In-Charge.
  • Client correspondence.
  • As a Junior Research Fellow (Civil-Traffic Engineering): (1st June 2014 to 1st June 2015)
  • Research and Planning under Civil Engineering Department,(IIT GUWAHATI 1 year)
  • Real Time Data Collection of Guwahati City Traffic.
  • Using G.P.S to get the pin point coordinates of a location.
  • Preparation of Guwahati City Road map using Q GIS.
  • Analyzing the shortest path between origin and destination using Arc Gis.
  • Preparation of report after analyzing the traffic data to get the Density, Volume of Traffic, Road side Hindrance etc.
  • Preparation of report for newly constructed Highway and City road regarding the roughness of the road using hand held rough meter.

Timeline

Technical Consultant (Civil)

GBSIPRD Assam
12.2019 - Current

Transformation Manager

OYO Rooms Guwahati Hub
03.2019 - 12.2019

Assistant Manager

Gammon Engineering and Contractors Pvt Ltd
11.2017 - 02.2019

Project Engineer (CIVIL)

PATEL ENGINEERING LIMITED
06.2017 - 11.2017

Junior Research Fellow

INDIAN INSTITUTE OF TECHNOLOGY GUWAHATI
06.2014 - 06.2015

High School - undefined

K.V N.H.P.C Dhemaji

X - undefined

K.V I.O.C.L Guwahati Refinery

B.Tech - CIVIL

SIKKIM MANIPAL UNIVERSITY

M.Tech - TUST

IIT(ISM) Dhanbad
Krishna SharmaEngineer Civil