Summary
Overview
Work History
Education
Skills
DECLARATION
Timeline
Generic
Krishna Kant Kushwaha

Krishna Kant Kushwaha

Bhopal

Summary

Seeking an organization to enhance my skills and acknowledge up to maximum and where my talents best put to use. I am a team player and aspire to secure a responsible position & deliver high end performance in a reputed organization utilizing domain knowledge.

Overview

9
9
years of professional experience
2
2
Languages

Work History

Sr. Customer Service Executive

TCTSL-TCL
07.2023 - 07.2025
  • Maintenance and troubleshooting ISP/INFRA related issue in Ahmedabad/Rajkot Access.
  • Perform routine health checks on BTS and network equipment, power systems, and transmission links.
  • Monitor network performance using NMS tools and escalate issues to L2/L3 support when required.
  • Handle customer escalations and provide timely resolution with proper communication.
  • Scheduling of preventing Maintenance and planning of SA/NSA Outages of rectification.
  • Provide technical support to field engineers and guide them during complex faults.
  • Participate in network upgradation, migration, and capacity enhancement projects.
  • Coordinate with vendors and OEMs for equipment replacement and RMA processing.
  • Checking of daily progress report and materials consumption report.
  • Perform VLAN configuration, port assignment, and interface troubleshooting on switches/routers.
  • Analyse fault trends and implement preventive measures to avoid repeated failures.
  • Represent PT ISP/OSP Daily Fault TT, Customer TT RCA & POA to every weekend.
  • Planning for Cost shaving Project and implement.
  • Maintenance of long distance Charging center and maintenance of Panel Diesel Generator, Air-Conditioning , ACDB, DCDB, AVR, Battery Bank.

CHM Transmission engineer

Vodafone idea limited
01.2023 - 07.2023
  • Working on Huawei SDH, ECI, ZTE, Ericsson NMS.
  • Service Provisioning VC4 & VC12 on Huawei OSN, ECI, Microwave link.
  • Perform Site siting, link deletion activity.
  • Software upgrading alarm clearance activity.
  • Create/delete/modified, trails.
  • Doing ATPC for Huawei RTN, ZTE, Ericsson, and New Node Insertion.
  • Creating Tunnels/Trails for Packet Links.

Project engineer

Tata communications Limited
03.2022 - 01.2023
  • New Lambda Addition (10G, 100G & 200G) & Frequency Migration Activities in OTM Links, OADM & ROADM Links.
  • Carried out Installation, Commissioning, Testing (AT), Uploading & Trouble-Shooting of various SDH equipment’s such as HUAWEI, Tejas Mux.
  • New site e.g. OLA, OADM & ROADM Insertion and Migration Activities in existing link.
  • Installation and commissioning HUAWEI switch /CISCO routers.
  • Card replacement activities e.g. Amplifier type change to, ITL, M40/D40, DCM type
  • EOR, IOR, PE raised window open for NSA and SA activity.
  • MRN, FRN raised for Material movement.
  • Worked on tools like U2000 NMS, web LCT, navigator, Putty etc.
  • Doing the site survey for MAN and NLD site as per scope of project.
  • Support to vendors engineers for different type of activities.
  • Lambda Activity Report preparation submission to NOC.
  • Store and asset management of all devices, card and fibre cables (LCPC-LCPC, LCPC, SCPC)

Project Engineer

Beetel TeleTech Limited
10.2021 - 03.2022
  • Performed OLA to OADM conversion activity.
  • Network implementation including installation, acceptance testing (ATP) and commissioning of DWDM equipment’s.
  • Carried out Lambda Addition & Termination in various DWDM equipment’s such as Huawei 6800, Huawei 1600, and Huawei 8800.
  • Performed Link optimization & Lambda addition activity.
  • Worked with various Testing equipment’s such as (SDH Access Tester, Ethernet Tester, Fiber Channel Tester, JDSU MTS 8000, and Expo FTB200. Tester and OSA.
  • Responsible for all DWDM activity for OSN9800, OSN6800, OSN8800 & BWS1600G OPTIX.
  • In NLD Network New OLA insertion, OADM-OTM, OLA-OADM-OTM, OLA-ROADM) Amplifier and ITL addition, New point to Point Node Addition activities.

Project engineer

Tata communications Limited
06.2016 - 09.2021
  • New Lambda Addition (10G, 100G & 200G) & Frequency Migration Activities in OTM Links, OADM & ROADM Links.
  • New site e.g. OLA, OADM & ROADM Insertion and Migration Activities in existing link.
  • Installation and commissioning HUAWEI switch /CISCO routers.
  • Card replacement activities e.g. Amplifier type change, MR4/MR8 to M40/D40, DCM type
  • EOR, IOR, PE raised window open for NSA and SA activity.
  • MRN, FRN raised for Material movement.
  • Doing the site survey for MAN and NLD site as per scope of project.

Education

MBA - Human Resources Development

Barkatullah Vishwavidyalaya
Bhopal, India
04.2001 -

B.Tech - Electronic and communications

Dr. A. P. J. Abdul Kalam Technical University
Lucknow, India
01.2015

12th - undefined

BSEB Board
01.2015

10th - undefined

M.P. Board
01.2009

Skills

Team Management skills

DECLARATION

I consider myself familiar with Electronics and Telecommunication aspects. I am also confident of my ability to work. I hereby declare that the information furnished above is true to the best of my knowledge.

Timeline

Sr. Customer Service Executive

TCTSL-TCL
07.2023 - 07.2025

CHM Transmission engineer

Vodafone idea limited
01.2023 - 07.2023

Project engineer

Tata communications Limited
03.2022 - 01.2023

Project Engineer

Beetel TeleTech Limited
10.2021 - 03.2022

Project engineer

Tata communications Limited
06.2016 - 09.2021

MBA - Human Resources Development

Barkatullah Vishwavidyalaya
04.2001 -

12th - undefined

BSEB Board

10th - undefined

M.P. Board

B.Tech - Electronic and communications

Dr. A. P. J. Abdul Kalam Technical University
Krishna Kant Kushwaha