Timeline
KRISHNAMOHAN P

KRISHNAMOHAN P

Project Coordinator
Visakhapatnam

Summary

Currently working as Project Coordinator with an overall experience of over 20 years in the Civil Engineering field 15 years’ experience in Industrial Turnkey / EPC projects in the Steel industry and Petroleum Refinery. A versatile Construction Professional having execution and planning experience in RCC works like Heavy Industrial foundations, Piling, Substation Buildings, Pump House, Cooling towers, RCC Tanks, Bituminous and RCC Roads, Pre-stressing, Cable trenches, Residential apartments etc.

Overview

21
21
years of professional experience
4
4
years of post-secondary education
1
1
Certification
4
4
Languages

Work History

Project Coordinator

M/s Magnus Projects Pvt. Ltd
Visakkhapatnam
2023.02 - Current
  • Handling projects at G.Madugula (A.P) under Central Government and Hirakud, Odisha for HINDALCO
  • Maintain and oversee project plans, schedules, work hours, budgets, and expenditures
  • Collaborate with all stakeholders and conduct meetings
  • Establish a project management calendar and follow up to track progress toward each goal and objective
  • Interface between site and HO on all technical and administrative issues
  • Reporting on the current state of the project to management
  • Ensure projects conform to established frameworks and standards and maintain accurate project documentation
  • Evaluate project risks and issues, offering applicable solutions
  • Billing and related documentation.
  • Supervised multiple projects from project start through delivery by prioritizing needs and delegating assignments.
  • Assisted with onboarding newly hired staff members and coached on task prioritization.
  • Established rapport and engaged with stakeholders to build lasting professional relationships.
  • Maintained database and spreadsheets with accurate inventory and status.
  • Developed and implemented project plans and budgets to ensure successful execution.

Lead Civil Engineer

Airoil Flaregas Private Limited
Visakhapatnam
2021.07 - 2022.07
  • New Flare Project for VRMP, for civil works of New Flare Project at HPCL
  • Responsible for overall site execution and works like foundations, drains, paving and other miscellaneous civil jobs
  • Lead the civil work to completion and handed over mechanical front in a timebound manner
  • Handled site execution and QC for civil works
  • Documentation of QC reports, Bar bending schedules and related reconciliations
  • Liaising for obtaining MRCC (mines and revenue clearance certificate) etc.
  • Estimated quantities and material costs during project planning to support budgeting and costing.
  • Identified and resolved potential structural issues.
  • Drafted and reviewed construction schedules, environmental impact studies and project designs.

Construction Manager

HINDALCO INDUSTRIES LIMITED
2022.10 - 2023.01
  • Construction of A-Type Flats (2 Blocks) at Riverside Colony, HINDALCO, Hirakud, Sambalpur, Odisha
  • Formulated the detailed Project Schedule (L2 level) and computed the overall project resource deployment schedule
  • Initiated site work and established the site from scratch including all administrative and site requirements
  • Handled recruitment of site personnel such as Site Engineers, QC Engineers and Safety officers
  • Finalized the initial site layout and obtained all statutory clearances for site mobilization
  • Supervised the site execution and handled works like Dismantling, Foundations and Retaining wall construction
  • Handled documentation of QC reports, Bar bending schedules , reconciliations of materials
  • Complete Client Billing with all related documentation
  • Communicated daily with vendors to keep project fully operational.
  • Planned and implemented comprehensive construction schedule to guarantee completion of project on time and within budget.
  • Identified and resolved construction issues promptly to prevent delays.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Negotiated labor contracts with general contractors and subcontractors.
  • Tracked project costs and other financial metrics to maximize profitability.
  • Analyzed and evaluated construction bids to select most cost-effective contractors.
  • Developed and implemented construction plans according to client specifications and expectations.
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.

Asst. Manager

Gillanders Arbuthnot & Co., Ltd, Rashtriya Ispat Nigam Limited, RINL
2017.01 - 2021.06
  • Project: Power Distribution system at Coke Oven -5 of Visakhapatnam Steel Plant (VSP), Visakhapatnam (AP)
  • Civil In charge for over INR 12 crore worth of civil works
  • Involved from initial site establishment to civil handing over of 2 No’s G+1 (65mtrs x 30mtrs) Substation buildings 8-LBDS1 and 8- LBDS2 for supply of 11KV and 6.6KV to Coke oven Battery-5 and other downstream units
  • Executed over 6000 cu.m RCC till date for the project
  • Supervised finishing works including granite floors, False ceiling, Roof treatment, plastering, paintings, Sanitary, plumbing etc
  • Constructed over 3 km of cable gallery foundations

Assistant Manager

Gillanders Arbuthnot & Co., Ltd
2014.11 - 2016.12
  • Project: Augmentation of the existing water supply system to the Blast Furnace - 2 at VSP, Visakhapatnam (AP)
  • Civil in charge for complete revamping of existing 3-celled ICW cooling tower and GCP cooing tower with accessories
  • Civil in charge for Construction of new single celled GCP and 3 celled ICW cooling towers and allied units
  • Dismantled modified and carried out extensive repairs of existing GCP (2700cum/hr capacity) & ICW (6800 cum/hr) Cooling towers, Chemical treatment plant, Waste water treatment plant, etc
  • Fabrication and setup of manufacturing system for over 4000 no’s pre-stressed parabolic splash bars (RCC fill)
  • Successfully repaired the existing fins, spalled concrete and water leakages from the wall of existing Cooling towers
  • Retrofitted the existing beams to install new eliminator system and
  • Entirely reconstructed the supporting beams and motor and fan foundations

Assistant Manager

Gillanders Arbuthnot & Co., Ltd
Durgapur, West Bengal
2014.06 - 2014.12
  • Project: External Water Supply System for Bloom cum Round caster at SAIL, Durgapur Steel Plant, (W.B) Civil In charge for
  • Construction of Secondary Settling Tank and Sludge Storage Tank, Soft water and Backwash tank Pump house
  • Side stream Pressure filter foundations, Trestle/ Tower foundations

Assistant Manager

Gillanders Arbuthnot & Co., Ltd
Visakhapatnam
2012.03 - 2014.05
  • Project: Augmentation of Water System & installation of new facilities for BF-1 at VSP, Visakhapatnam (AP)
  • Civil In charge for Construction of new single celled GCP and three celled ICW cooling towers, Side stream pressure filter plant etc
  • Dismantling/modification and extensive repairs of existing GCP (2700cum/hr capacity) &ICW (6800 cum/hr) Cooling towers, Chemical treatment plant etc.by using proprietary treatment methods
  • Total replacement of existing RCC and PVC fill
  • Dismantling and Replacement of existing motor and fan foundation
  • Modification of thickener foundations and dismantling, reinstallation of pump foundations
  • Modification of launder and inlet channels and repair of cracks developed
  • Connection of new Cable trenches to existing underground tunnel, Constructed new cable pulpits and road crossings

Senior Engineer

Gillanders Arbuthnot & Co., Ltd
Visakhapatnam
2011.09 - 2012.03
  • Supervised and constructed the civil foundations for new Burden handling system for Capital Repair of BF-1 at VSP
  • Construction of new 160 cu.m Gas cleaning plant foundation for new Gas cleaning plant at VSP
  • Coordinated engineering team for projects in commercial and industrial development.
  • Mentored and coached entry-level and junior engineers to improve talent and boost skill levels.

Site Engineer

2008.06 - 2011.09
  • Project: 80,000 cum LD Gas Holder for SMS-II under 6.3 MTPA expansion, complete with all accessories for Visakhapatnam Steel Plant
  • Individually handled the civil aspect of turnkey project worth INR 7.5 crores of over 3000 cu.m RCC from site establishment including office construction till handing over of civil work to Client
  • Supervised the entire civil work of 120 no’s 450 Día piles using conventional method and hydraulic drilling, pile caps and 1500 cu.m ring beam for Gas holder technological structure and entire inlet pipeline foundations
  • Executed the ring beam with a precision of +- 3mm design tolerance
  • Commended for executing the best civil work for Gas Holder foundation in India
  • Supervised detailed Soil investigations for LD Gas Holder foundation design

Sr. Site Engineer

VTC Engineering Ltd
Visakhapatnam
2005.05 - 2008.03

Site Engineer

Creative Constructions
Visakhapatnam
2003.01 - 2005.04

Education

B.E - Construction

University of Mumbai, MHSS College of Engineering, Mumbai
1994.06 - 1998.05

Passed with First Class (64.5%)

Skills

Possesses major expertise in Industrial revamping, Capital repairs and other enabling worksundefined

Certification

MS- Project from the CADD center, Visakhapatnam

Accomplishments

  • Used Microsoft Excel to develop inventory tracking spreadsheets.
  • Used Microsoft Excel to create Project Scheduling template for scheduling and monitoring projects.
  • Devised spreadsheets to perform Rate analysis of all standard items used in Civil works.
  • Created and monitored project scope deviation statements for processing amendments

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Project Coordinator - M/s Magnus Projects Pvt. Ltd
2023.02 - Current
Construction Manager - HINDALCO INDUSTRIES LIMITED
2022.10 - 2023.01
Lead Civil Engineer - Airoil Flaregas Private Limited
2021.07 - 2022.07
Asst. Manager - Gillanders Arbuthnot & Co., Ltd, Rashtriya Ispat Nigam Limited, RINL
2017.01 - 2021.06
Assistant Manager - Gillanders Arbuthnot & Co., Ltd
2014.11 - 2016.12
Assistant Manager - Gillanders Arbuthnot & Co., Ltd
2014.06 - 2014.12
Assistant Manager - Gillanders Arbuthnot & Co., Ltd
2012.03 - 2014.05
Senior Engineer - Gillanders Arbuthnot & Co., Ltd
2011.09 - 2012.03
Site Engineer -
2008.06 - 2011.09
Sr. Site Engineer - VTC Engineering Ltd
2005.05 - 2008.03
Site Engineer - Creative Constructions
2003.01 - 2005.04
University of Mumbai, MHSS College of Engineering - B.E, Construction
1994.06 - 1998.05
MS- Project from the CADD center, Visakhapatnam