Work with an environment where I could exercise my expertise and ability in order to emerge as one of the best ELECTRICAL DESIGN ENGINEER (PROTECTION). I will bring the following assets-good communication skills, self-starter, self-motivated, willingness to learn and eagerness to participate. Looking for a stimulating role where I can apply my enthusiasm, professionalism and thorough approach to support a team.
Project: West van wart, Roller creek stations (AMERICAN ELECTRIC POWER) OHIO (Third Party design submissions.)
Project: Mission 69kv switchgear (SAN DIEGO GAS & ELECTRIC COMPANY) (Third Party design submissions.)
Project: Claydon , Moretonlane, Stonehollow stations (ETHICAL POWER) UK (Third Party design submissions.)
· Preparation of SLD.
· Preparing AC & DC schematics.
· Preparing Control & Relay Panel drawing Scheme.
· Preparation of Protection Single Diagram & Tripping Matrix Based on the Inputs.
· Preparation complete interfacing of switchgear, control and protection panels.
· Preparing Cable Schedule.
· Logic design and BOM chart preparation
· Planning schedule Preparing/reviewing using primavera
· CT/VT adequacy check.
· LVAC/DC SLD Preparation.
· As built Drawings preparations.
· Signal List analyzing / Preparation.
· Coordination with Client for getting approval for Drawings.
· Electrical scheme verification and component verification
· Logic design and BOM chart preparation
· Engineering co-ordinations.
· Inspecting site for construction and prepare detailed report for submission
· Site acceptance report preparation
· Shortlisted approved suppliers and vendors for equipment purchase from approved vendor list.
· Preparing Technical documents for Tender submission.
· As built Drawings preparations
· Coordination with Consultant & Client for getting approval for site activities / Drawings.
· Electrical scheme verification and component verification
· Logic design and BOM chart preparation
· Material purchasing for site related works.
· Planning schedule using primavera
· MEP designing(HVAC)
· Engineering co-ordinations.
Project: GTC/488B/2012- S5 Multi Storey Car Park with 66/11kV Substation (Kahramaa)
Project: GTC/488G/2012- S13, S14, S17 & S18 Packages 66/11kV Substations (Kahramaa)
· Preparation of SLD.
· Checking of Control & Relay Panel drawing Scheme.
· Preparation of Protection Single Diagram & Tripping Matrix Based on the Inputs.
· Site survey for Remote End modifications.
· Remote end Modifications at site.
· Preparation of complete Design modification at remote end substation for incorporation new protection relays with new scheme to match with new main substation.
· Preparation complete interfacings of switchgear, control and protection panels.
· Preparation of Site Activity Reports (Daily, Weekly, Monthly).
· Material purchasing for site related works.
· Preparing Technical documents for Tender submission.
· Shortlisted approved suppliers and vendors for equipment purchase from approved vendor list.
· MEP works related to handling AC and DC power source interference and HVAC.
· Support Testing activities and site related works.
· SAT and FAT Inspections.
· Co-ordinate with other departments.
· CT/VT adequacy check.
· Signal List analyzing / Preparation.
· Relay setting analyzing / Preparation.
· LVAC/DC Setting calculation.
· Notification of safety precautions (NOSP) Preparation and getting approval.
· Asbuilt Drawings preparations.
· Coordination with Consultant & Client for getting approval for site activities / Drawings.
· Site coordination and Testing Activities.
· Engineering co-ordinations.