Summary
Overview
Work History
Education
Skills
Languages
Disclaimer
Mobile Numbers
Personal Information
Timeline
Generic
Kunwar Digvijay Singh

Kunwar Digvijay Singh

Sultanpur

Summary

Dedicated Store Officer with proven expertise in inventory management and operational efficiency. Successfully implemented stock control systems that enhanced store operations and reduced overhead costs. Strong record-keeping and reporting skills, complemented by effective team leadership. Committed to contributing to organizational growth through hard work and dedication.

Overview

17
17
years of professional experience

Work History

Store Officer

PNC Infratech Ltd.
04.2018 - Current
  • Presently looking independently all store work.
  • All mobilization of store weighbridge ETC is done in my supervision.
  • Presently working on multiple projects including Four Laning of Bhojpur to Buxar section and Construction of 6-Lane Greenfield Ranchi-Varanasi-Kolkata Highway.
  • Contract value: 681.67 Crore for Four Laning of Bhojpur to Buxar section.
  • Contract value: 1113.43 Crore for Construction of 6-Lane Greenfield Ranchi-Varanasi-Kolkata Highway.

Junior Officer

Hindustan Construction Company Ltd.
02.2016 - 04.2018
  • Worked in SAP (Systematic Application Product) (ETM, PP & MM) Module.
  • Job Responsibility GR, MR & Material Issue punching In SAP.
  • Prepared Monthly HSD & Daily Consumption Report.
  • Manage day to day interactions with vendors for prices.
  • Physical Inventory checking.
  • Preparing for audits (IMS audit, Management audit, PIV audit).
  • Well versed with SAP.
  • Manpower deployment planning & provide training to them as required.
  • Reconciliation/Verification of capital items on quarterly/half yearly/yearly basis.
  • Reconciliation of Materials & Tools in all respect.
  • In National Highway Project Rehabilitation and Upgradation of Indo Nepal Border to Rudhauli Section (Km 0+000 to Km 65+870) of NH 233 in Uttar Pradesh to two lane with paved shoulder on EPC Mode under NHDP Phase - IV.

Store Keeper

Hindustan Construction Company Ltd.
04.2014 - 01.2016
  • Worked in SAP (Systematic Application Product) (ETM, PP & MM) Module.
  • Job Responsibility GR, MR & Material Issue punching In SAP.
  • Prepared Monthly HSD & Daily Consumption Report.
  • Manage day to day interactions with vendors for prices.
  • Preparing for audits (IMS audit, Management audit, PIV audit).
  • Well versed with SAP.
  • Overall control on Inward and outward Materials.
  • Overall control on proper stocking of materials as per ISO procedures.
  • Overall control on Minimum/Maximum level of fast moving items.
  • Reconciliation/Verification of capital items on quarterly/half yearly/yearly basis.
  • Reconciliation of Materials & Tools in all respect.
  • Procurement, Bill verification and accounting.
  • ABC analysis, Non-moving, slow moving, fast moving, report to management.
  • Prepared monthly Explosive consumption Report.
  • Issue & Receipt of Explosive day by day as per company norms.
  • Manpower deployment planning & provide training to them as required.
  • Maximum cost savings without hampering the production process.
  • Well adaptive towards corporate culture and behavior & ability to work under pressure.
  • Planning, Controlling and Handling of the flow of materials by logical and economical methods right from dispatch by suppliers end to Receipt, storage and issue.
  • For Construction of civil works comprising River Diversion, Dam Structure, Conveyance Channel, De-silting Basins, Power Channel, Head Race Tunnel, Underground Balancing Reservoir, Pressure Shaft, Valve Chamber, Adit to Valve Chamber/ Balancing Reservoir, Civil works of Underground Power House/Transformer Hall including various Adits in Powerhouse Complex and Tail race tunnel complete in all respects of Vishnugad Pipal Koti Hydroelectric Project MW 440 has been taken up by (THDC), Vishnugad Pipalkoti District-Chamoli (Uttrakhand) India.

Store Keeper

Steiner India Limited
11.2013 - 03.2014
  • Worked in SAP.
  • Job Responsibility GR, MR & Material Issue punching In SAP.
  • ABC analysis, Non-moving, slow moving, fast moving, report to management MIS Report for management.
  • Project/Site store setup and Vendor development.
  • Overall control on Minimum / Maximum level of fast moving items.
  • Reconciliation/Verification of capital items on half yearly/yearly basis.
  • Reconciliation of Materials & Tools in all respect.
  • Overall Responsibility of plant operation in both shifts.
  • For Site: Serno Project Pune (Building Project) Client: Amit Enterprises.

Store Keeper

Hindustan Construction Company Ltd.
05.2009 - 10.2013
  • Looking after day to day store inventory Receipts/Issue of Materials.
  • Arranging inspection of materials.
  • Stocking and Binning.
  • Inward and outward Materials.
  • Proper stocking of materials.
  • Maintaining all ISO procedures GR, MR & Material Issue punching In SAP.
  • For Construction of civil works comprising River Diversion, Intake Structure, Conveyance Channel, De-silting Basins, Power Channel, Head Race Tunnel, Underground Balancing Reservoir, Pressure Shaft, Valve Chamber, Adit to Valve Chamber/Balancing Reservoir, Civil works of Underground Power House/Transformer Hall including various Adits in Power house Complex and Tail race tunnel complete in all respects of Kashang H.E.P(65 MW X 3 units) has been taken up by Himachal Pradesh Power Corporation Limited in District Kinnaur (Himachal Pradesh), India.
  • Worked in SAP (Systematic Application Product) (ETM, PP & MM) Module.

Education

M.A. -

Ganpat Sahay P.G. College
Sultanpur
01.2013

B.A. -

K.N.I.P.S.S. College
Sultanpur
01.2009

12th -

S.C.R.I. College
Gosainganj, Sultanpur
01.2006

10th -

S.R.C.S.I. College
S.N. Kumar Ganj, Faizabad
01.2004

Skills

  • Inventory management and store operations
  • Procurement strategies
  • Adaptability and teamwork
  • Analytical skills and critical thinking
  • Proactive learning
  • Vendor relations and negotiation
  • Supply chain optimization
  • Effective problem resolution
  • SAP proficiency
  • Inventory management
  • Material reconciliation
  • Vendor negotiation
  • Supply chain management
  • Problem solving
  • Stock control
  • Team building and leadership
  • Multitasking and organization
  • Documentation and reporting
  • Report generation

Languages

  • Hindi
  • English
  • Hindi

Disclaimer

I declare that above information is true to the best of my knowledge and belief.

Mobile Numbers

  • 7905686212
  • 7500477861

Personal Information

  • Passport Number: N7418815
  • Date of Birth: 01/22/89
  • Village- sirwara
  • Post- Fatehpur (sanghat)
  • district- sultanpur
  • Pin Code- 228119
  • State- Uttar Pradesh
  • Gender: Male
  • Nationality: Indian
  • Marital Status: married
  • Religion: Hindu

Timeline

Store Officer

PNC Infratech Ltd.
04.2018 - Current

Junior Officer

Hindustan Construction Company Ltd.
02.2016 - 04.2018

Store Keeper

Hindustan Construction Company Ltd.
04.2014 - 01.2016

Store Keeper

Steiner India Limited
11.2013 - 03.2014

Store Keeper

Hindustan Construction Company Ltd.
05.2009 - 10.2013

M.A. -

Ganpat Sahay P.G. College

B.A. -

K.N.I.P.S.S. College

12th -

S.C.R.I. College

10th -

S.R.C.S.I. College
Kunwar Digvijay Singh