Summary
Overview
Work History
Education
Skills
Languages
Timeline
Personal Information
Computerliteracyskills
Personal Information

KUPPUSAMY B

Civil Engineering
Erode

Summary

To work with a well-reputed and established organization in a challenging environment where I can use my talent, knowledge and potential to the maximum extent. Experienced Site Engineer with 16+ years of experience managing multiple simultaneous responsibilities to foster construction project completion. Well-organized planner and problem-solver versed in site preparation and day-to-day management. Veteran Site Engineer trusted to provide safe and streamlined completion of all structural and finishing work projects. Complies with both customer requests and applicable code and regulatory concerns to reduce liability and eliminate project interruptions. Committed to offering smooth and predictable progress on all managed projects.

Overview

17
17
years of professional experience

Work History

Deputy Manager in Projects (Commercial & Residential)

Ramraj Cotton
05.2023 - Current
  • Improved team efficiency by streamlining processes and implementing innovative management strategies.
  • Identified areas for improvement within the department, implementing strategic initiatives to address gaps in performance or resources.
  • Collaborated with cross-functional teams to drive business growth and achieve corporate objectives.
  • Created and maintained a strong team culture that promoted high levels of collaboration, employee satisfaction, and overall performance.

Project Engineer in Finishing Incharge

AL - BASTI & MUKTHA LLC
03.2017 - 06.2021

Projects

1.THE GRAND-CREEK HARBOUR (2B+G+3P+63 Floor+3Roofs)

2.VIDA RESIDENCE-DOWNTOWN (3B+G+3P+58Floor+3Roofs)


  • Preparation of checklist for the activities of grouting, plumb checking, and fittings.
  • Looking after all the finishing activities and getting the apartments ready for snagging and de-snagging
  • Rectifying and complying with the comments received during snagging inspections and resubmitting the apartments for the de-snagging inspections
  • Coordinating with various subcontractors and aligning the work activities to prepare apartments to offer for snagging inspections to consultants.

Site in Charge of Structural and Finishing Works

L&T Construction
11.2013 - 04.2017

DLF My Town (Maiden Heights & Woodland in Stilt + 12 Floors)


  • The execution of structural and finishing work in a construction project involves a series of activities that are well planned and coordinated.
  • Managed staff scheduling efficiently to ensure adequate nurse coverage during shifts without compromising the quality of care provided.
  • Delegated tasks effectively to nursing staff, ensuring proper distribution of workload and optimal patient care delivery.
  • Improved patient satisfaction by providing high-quality nursing care to patients and addressing their concerns promptly.

Site Engineer of Structural Works

L&T Construction
11.2011 - 11.2013

IREO - The Grand Arch Project – Gurgaon (02 basement + 23 Floors) + RCC Bridge – Connecting Two Towers at 20th Floor in a 32mtr span.

  • Checked technical designs and drawings for adherence to standards.
  • Coordinated with subcontractors, ensuring their work met project specifications, as well as monitored their progress towards completion deadlines.
  • Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.

Site Engineer of Structural Works

L&T Construction
07.2010 - 10.2011

ORCHID CROWN-MUMBAI (80-storied, 2 towers; 71-storied 1 Tower & 16-floor Multi-Level Car Parking with 3 Basements.

  • Checked technical designs and drawings for adherence to standards.
  • Coordinated with subcontractors ensuring their work met project specifications as well as monitored their progress towards completion deadlines.

Site Engineer of Constructing Extension Works

S.P. Apparels Ltd.,
06.2009 - 06.2010
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.

DET-Quantity Surveyor Billing & Planning

URC Construction (P) LTD
05.2007 - 03.2009
  • Developed strong relationships with clients through consistent communication and timely delivery of results.
  • Coordinated survey crew activities and oversaw field operations.
  • Entered legal descriptions, lot sizes and other data into online databases through AutoCAD, SurvCAD and CADD interfaces.

In House Buildings @ Home Town

Own Business
08.2021 - 04.2023
  • Increased brand awareness by developing and implementing targeted marketing campaigns.
  • Spearheaded content partnerships with like-minded organizations, broadening reach into new demographics while aligning with brand values.

Education

Diploma in Civil Engineering -

Sakthi Polytechnic College
  • Percentage: 73%
  • Period: 2005-2007

Higher Secondary - undefined

Govt Boys Higher Secondary School
  • Percentage: 70%
  • Period: 2003-2005

SSLC - undefined

Govt Boys Higher Secondary School
  • Percentage: 48%
  • Period: 2002-2003

Skills

Site Inspection

Languages

Tamil
Advanced (C1)
English
Advanced (C1)
Hindi
Intermediate (B1)

Timeline

Deputy Manager in Projects (Commercial & Residential) - Ramraj Cotton
05.2023 - Current
In House Buildings @ Home Town - Own Business
08.2021 - 04.2023
Project Engineer in Finishing Incharge - AL - BASTI & MUKTHA LLC
03.2017 - 06.2021
Site in Charge of Structural and Finishing Works - L&T Construction
11.2013 - 04.2017
Site Engineer of Structural Works - L&T Construction
11.2011 - 11.2013
Site Engineer of Structural Works - L&T Construction
07.2010 - 10.2011
Site Engineer of Constructing Extension Works - S.P. Apparels Ltd.,
06.2009 - 06.2010
DET-Quantity Surveyor Billing & Planning - URC Construction (P) LTD
05.2007 - 03.2009
Sakthi Polytechnic College - Diploma in Civil Engineering,
Govt Boys Higher Secondary School - Higher Secondary,
Govt Boys Higher Secondary School - SSLC,

Personal Information

  • Date of Birth: 02/05/1987
  • Nationality: Indian
  • Marital Status: Married

Computerliteracyskills

  • Auto CAD
  • Proficient use of MS Office, MS Excel and Basic Computer attributes.

Personal Information

  • Date of Birth: 02/05/1987
  • Nationality: Indian
  • Marital Status: Married
KUPPUSAMY BCivil Engineering