Summary
Overview
Work History
Education
Skills
Extra-Curricular activities
TRAINING
Responsibilities
Timeline
AccountManager
Kushal Dabhadkar

Kushal Dabhadkar

MEP- Head
Mumabi ,MH

Summary

B.Tech. In Mechanical, with 17+ years of experience in Construction with specialization of MEPF works Design, Executions, Completion & Handing over to clients in Airports, Hospitals, Administrative building, data centre, Commercial, Residential and High rise building projects. Excellent knowledge of the requirements for the projects. Currently associated with Infrastructure Development Corporation (Karnataka) Limited for the the Conctruction of Cancer Hospital Building- Plantinum Jubilee Block for Tata memorial Cancre center at Parel, Mumbai, as an MEP -Head. Previously associated with Colliers internationals, as an MEP -Project Manager for the Project -Construction of Greenfield International airport at Hirasar, Rajkot, Gujarat. Previously associated with Purvi Engineers India Private limited as a Project Manager for the Project- Refurbishment of International airport, Ahmadabad, Gujarat. Previously associated with Nirmitee PMC as a MEP Manager for the Project- Upgradation of Terminal Building at Surat International Airport, Gujarat. Previously associated with Sheree Khodiyar Engineers India Pvt. Ltd. as a MEP Manager for the Project- Amazon data center Infinity HYD 100 & HYD 110, Hyderabad, Telangana. Previously associated with Harsh Constructions Pvt. Ltd, as a MEP Project Manager for Airports, Administrative buildings, Hospitals, Institutes & Industrial projects Previously associated with Neosys fire & safety technologies Pvt. Ltd. as Project Manager for Industrial, Hospitals, Institutes projects Previously associated with Vinodrai Engineers Pvt. Ltd. as Project Manager for the development of the plant & MEP associated works at Jalna, Maharashtra. Hands-on experience in MEPF Estimation, Design Review & Coordination, Projects Planning & Management, Vendor Development, Purchase, Installation, Testing & commissioning and Handing over, documentation of HVAC, Firefighting, Electrical, BMS, Electrical (HT<), WTP, STP works, Skilled in preparing technical study reports, analysis report, technical presentations etc. Key skills in Site Management, Client & Supplier contractual negotiations, Project profitability, scheduling, Vendor development, coordination with department & technical heads. Key strength: Leadership, consistency, good team member, adaptability, Self confidence, Positive attitude An ambitious & hardworking individual with excellent relationship management skills and the ability to manage time effectively. Carrier objective: Seeking a challenging career in the quality environment where my technical skills and qualifications as a Mechanical Engineer can be shared and enriched and make a significant contribution to organization with strong work ethics and diligence.

MEP professional with proven track record in managing and coordinating mechanical, electrical, and plumbing systems for large-scale projects. Skilled in team collaboration, project management, and adapting to changing project requirements. Strong analytical abilities, technical expertise, and leadership skills ensure successful project completion and client satisfaction. Reliable and results-driven with focus on efficiency and quality.

Experienced with overseeing design, implementation, and maintenance of MEP systems in complex construction environments. Utilizes in-depth technical knowledge to ensure system efficiency and project compliance. Knowledge of leading cross-disciplinary teams to meet project deadlines and client expectations.

MEP professional with comprehensive expertise in managing intricate MEP systems for diverse construction projects. Known for strong project management skills, ensuring timely completion and adherence to quality standards. Reliable team player who adapts to evolving project needs and focuses on achieving collaborative success through effective communication and innovative solutions.

Overview

17
17
years of professional experience
1
1
Language

Work History

MEP Head

Infrastructure Development Corporation (Karnataka) Limited
05.2025 - Current
  • Assisted in resolving complex technical issues related to mechanical, electrical, or plumbing systems as they arose during projects.
  • Conducted thorough quality control checks to maintain high standards in MEP installations and design output.
  • Effectively managed budgets throughout the project lifecycle while maintaining a focus on cost reduction opportunities.
  • Streamlined communication between internal teams and external partners, ensuring seamless project execution.
  • Assisted in preparing detailed proposals for potential clients that showcased the company''s capabilities in delivering superior MEP services.
  • Collaborated closely with architects, engineers, and other stakeholders to ensure seamless integration of MEP systems into overall building design plans.
  • Analyzed and evaluated construction bids to select most cost-effective contractors.
  • Assisted in organizing and overseeing assignments to drive operational excellence.
  • Tracked project costs and other financial metrics to maximize profitability.
  • Negotiated labor contracts with general contractors and subcontractors.
  • Enhanced project safety through rigorous adherence to safety protocols and regular safety audits during the construction phase.
  • Reduced project costs with thorough value engineering analysis and implementation of cost-effective solutions.
  • Enhanced project efficiency by implementing effective MEP coordination and management strategies.
  • Scheduled utility service providers according to project timelines.
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.
  • Established and maintained relationships with vendors to source affordable and high quality materials and equipment for construction projects.

Project Manger - MEP

Colliers International
03.2023 - 04.2025
  • Project Handled: Construction of Greenfield International Airport.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Monitored progress against established goals, adjusting schedules and resources as needed to keep projects on track.
  • Client: Airport Authority of India.
  • Responsible works: HVAC, Firefighting, HPN, STP, WTP, Lift & Escalator, Airport security equipment & BMU.

Project Manger - MEP

Purvi Engineers India Private limited
03.2022 - 03.2023
  • Project Handled: Refurbishment of Ahmadabad international airport (T2 Terminal Building)
  • General contractor: ITDC Cementation
  • Client: Adani Ahmadabad International Airport
  • Responsible Works: HVAC, Firefighting, Fire alarm, Public address, FIDS & Access control system

Project Manger - MEP

Nirmitee Project Management & Consultancy
11.2020 - 02.2022
  • Project Handled: Up gradation of Terminal Building at Surat International Airport
  • Client: Airport Authority of India.
  • Responsible Works: HVAC, Firefighting, HPN, STP, WTP, Lift & Escalator, Airport security equipment & BMU.

Project Manger - MEP

Shree Khodiyar Engineers India Pvt. Ltd.
04.2020 - 10.2020
  • Project Handled: Amazon data center Infinity HYD 100 & HYD 110
  • Location: Fab E-city, Hyderabad
  • General contractor: Tata Projects limited
  • Client: Amazon Infinity.
  • Responsible works: Firefighting, HPN, STP, WTP, PHE.
  • Location: Hi-tech city, Hyderabad
  • General contractor: Sterling & Wilson Pvt. Ltd.
  • Client: Amazon Infinity.
  • Responsible works: Firefighting, HPN, STP, WTP & PHE.

Sr. Engineer - MEP

Harsh Construction Private Limited
10.2014 - 03.2020
  • Project Handled: Expansion & construction of Mangalore International Airport
  • Client: Airport Authority of India.
  • Responsible for: HVAC, Firefighting, Electrical, HPN, STP, WTP, Lift & Escalator, Airport security equipment & BMU.
  • Construction of Airport Terminal Building
  • Location: Ojhar, Nashik
  • Client: Hindustan Aeronautical Ltd.
  • Responsible Works: HVAC, Firefighting, Electrical HPN, STP, WTP, Lift & Escalator, Airport security equipment & BMU.
  • Development of Belgaum Airport
  • Location: Sambra, Belgaum
  • Client: Airport Authority of India.
  • Responsible Works: HVAC, Firefighting, Electrical, HPN, STP, WTP, Lift & Escalator, Airport security equipment & BMU.
  • Upgradation of Government Hospital
  • Location: Akola (Maharashtra) & Yawatmal (Maharashtra)
  • Client: Centre Public works department.
  • Responsible Works: HVAC, Firefighting, Electrical (HT, LT), HPN, STP, WTP, ELV, medical gas piping, Lift, Escalator & Nurse call station.
  • Construction of Super speciality block
  • Location: Hubli (Katakana)
  • Client: Katakana institute of medical sciences
  • Responsible works: HVAC, Firefighting, Electrical (HT, LT), HPN, STP, WTP, ELV, medical gas piping, Lift, Escalator & Nurse call station.
  • Construction Bust stand & Commercial centre
  • Location: Marcel, Goa
  • Client: Goa State Infrastructure Development Corporation
  • Responsible works: HVAC, Firefighting & Electrical & ELV works.
  • Construction of Government collage
  • Location: Pernem, Goa
  • Client: Goa State Infrastructure Development Corporation
  • Responsible works: HVAC, Firefighting & Electrical works
  • Construction of Cold storage & Export house
  • Location: Vashi, Navi Mumbai
  • Client: Mumbai APMC
  • Responsible works: Refrigeration & air conditioning, Firefighting & Electrical works.

Project Manager - MEP

Neosys Fire & Safety Technologies Pvt. Ltd.
04.2012 - 09.2014
  • Project Handled: HVAC & Fire fighting system at plant of United Sprit Ltd.
  • Client: United Sprit Limited
  • HVAC & Fire fighting system at plant of Kolher Engine (Lombardini) India Ltd
  • Client: Kolher Engine (Lombardini) India Ltd
  • MEP system at plant of Birla Precision Pvt. Ltd.
  • Location: Waluj, Aurangabad
  • Client: Birla Precision Pvt. Ltd.
  • MEP system at plant of Protesa India Pvt. Ltd.
  • Location: Chakan Pune
  • Client: Protesa India Pvt. Ltd.
  • MEP system at plant of Dhoot Transmission Pvt. Ltd.
  • Location: Shendra, Aurangabad
  • Client: Dhoot Transmission Pvt. Ltd.

Development Engineer - MEP

Vinodrai Engineers Pvt. Ltd
05.2011 - 03.2012
  • Project Handled: Construction & Development of Rotational moulding & aluminum casting manufacturing plant

Development Engineer - MEP

Logimates
05.2009 - 04.2011
  • Project Handled: Designing & Commissioning of Modular motorized belt conveyor with VFD
  • Client: Varroc polymers Ltd.
  • Designing & Commissioning of Pneumatic based Pick & Place System
  • Client: Bajaj auto ltd.
  • Designing & Commissioning of Developing and commissioning of Air filter assembly line
  • Location: Pantnagar, Uttarakhand.
  • Client: Varroc polymers Ltd.

Education

B.Tech. - Mechanical

M.I.T College of engineering
Aurangabad
01-2009

D.M.E. - Mechanical Engineering

Government Polytechnic
Jalna
01-2006

10th - undefined

S.B High school
Jalna
01-2003

Skills

Diploma in solid modeling at Vector Design Cad Centre training services, Aurangabad, during June 2011

Foundation course on Auto Cad at Vector Design Cad Centre training services, Aurangabad, during Feb 2009

Scheduling and planning

Budgeting and estimating

AutoCAD proficiency

Design and planning

Time management abilities

Effective communication

Management

Contract terms interpretation

Project Close-out

Extra-Curricular activities

Tabla Visharad Purna from Gandahrv Mahavidyalaya at 2001 Bagged many prizes in Cricket, Table tennis, chess during school & college. Tabla Visharad Purna from Gandahrv Mahavidyalaya at 2001 Bagged many prizes in Cricket, Table tennis, chess during school & college.

TRAINING

  • In-Plant Training at Sudarshan Saur shakti Pvt. Ltd.
  • Trainee Engineer -
  • Preparation of Bill of material & estimating of Non-conventional energy resources.
  • Review the work progress and hindrances with agency and try to resolve as soon as possible.
  • In-Plant Training at Videocon appliances Ltd.
  • Refrigerator division, Aurangabad

Responsibilities

  • Preparation of Conceptual, schematic drawing of Fire Protection, HVAC, BMS, Pumping stations, Hydro-pneumatic systems, ELV & Electrical equipment’s
  • Prepare/Review DBR & Concept design reports for MEP Systems.
  • Review of Work shop drawing of Fire Protection, HVAC, BMS, Pumping stations, Hydro-pneumatic systems, ELV & Electrical equipment’s
  • Review of cost estimation of all mechanical & electrical equipment & system.
  • Review Head load / Electrical load list indicating critical loads, single line diagrams / HVAC schematics.
  • Coordinate with client & contractor.
  • Analyzing DPR regularly
  • Planning, monitoring & controlling all site activities including manpower, resource & material
  • Designing and executing HVAC, Firefighting, ELV & Airport systems
  • Execution of WTP, STP, Hydro-pneumatic system, Lift & Escalator, Electrical system.
  • Coordinating with the consultants and troubleshooting for electrical/technical issues.
  • Preparation of material approval sheet & submittal review form against technical submittal
  • Preparation of Work method statement, Installation report, Inspection test plan
  • Quality control of MEP system.
  • Preparation & issuing of Non Conformance report
  • Co-ordination between all services & civil works
  • Project scheduled tracking.
  • Review the work as per approved shop drawings with latest revisions.
  • Evaluating and preparing bills for client and contractor
  • Scrutinize the documents as per agreement regarding material approval of agency.
  • Quality checking as per CPWD, NBC 2016, ISHARE & SMACNA specifications and maintain site order book for site execution purpose of agency.
  • Preparation of Start up commissioning report format of all Mechanical & Electrical system works.
  • Ensuring all required work following as per Griha & ECBC norms
  • Preparation of Performance testing & commissioning reports of all services.
  • Monitoring all safety rules during project executions & operations.
  • Issue letter for bad workmanship to agency and recovery the amount from the respective running bill.
  • Preparation of additional item, substitute item rate analysis.
  • Reminder letter issued to agency for the slow progress of execution and other related documentation job.
  • Review the work progress and hindrances with agency and try to resolve as soon as possible.
  • Coordinate with Project Management, Architects, Cost Consultants.
  • Participating in key meetings & workshops of the projects.
  • Keep updated on the reference guides/ codes for MEP services
  • Report to the higher management on regular basis on project status & updates.
  • Keep Project on track with timely observations & Documentations.
  • Give Time to time consultations, on execution of Project activities, Technical aspects
  • Having a close check on Supporting Engineers & Managers work towards service delivery.
  • Keep Track of Projects TDS certificates.
  • Develop Healthy professional relationships with other project team members such as Architects, PMC’s MEP Designers, Cost Consultants, Contractors.
  • Complete the project within time lines & meet the Client requirements.
  • Along with good written & verbal communication skills should be a good leader & manager

Timeline

MEP Head

Infrastructure Development Corporation (Karnataka) Limited
05.2025 - Current

Project Manger - MEP

Colliers International
03.2023 - 04.2025

Project Manger - MEP

Purvi Engineers India Private limited
03.2022 - 03.2023

Project Manger - MEP

Nirmitee Project Management & Consultancy
11.2020 - 02.2022

Project Manger - MEP

Shree Khodiyar Engineers India Pvt. Ltd.
04.2020 - 10.2020

Sr. Engineer - MEP

Harsh Construction Private Limited
10.2014 - 03.2020

Project Manager - MEP

Neosys Fire & Safety Technologies Pvt. Ltd.
04.2012 - 09.2014

Development Engineer - MEP

Vinodrai Engineers Pvt. Ltd
05.2011 - 03.2012

Development Engineer - MEP

Logimates
05.2009 - 04.2011

D.M.E. - Mechanical Engineering

Government Polytechnic

10th - undefined

S.B High school

B.Tech. - Mechanical

M.I.T College of engineering
Kushal DabhadkarMEP- Head