Summary
Overview
Work History
Education
Skills
PROFESSIONAL SKILLS
DECLARATION
Timeline
Generic

LAKSHMAN KUMAR .B

BANGALORE

Summary

Results-oriented Planning Engineer with over 9 years of experience in the Oil & Gas sector, specializing in Engineering, Procurement, and Construction (EPC) project scheduling within CMEI disciplines. Expertise in developing Level-3 and Level-4 schedules utilizing Primavera P6, resource loading, and monitoring subcontractor schedules. Proven track record in conducting critical path analysis and implementing schedule optimizations to enhance project efficiency and ensure timely execution. Committed to leveraging advanced scheduling techniques to drive successful project outcomes.

Overview

8
8
years of professional experience

Work History

Planning Engineer

PETROFAC
KUWAIT
08.2022 - Current
  • Created comprehensive EPC project schedules (L3/L4) for designated facilities within the refinery project.
  • Created comprehensive schedules by preparing project baselines for each construction phase.
  • Checking subcontractor schedule updates, integrating key activities into the master schedule.
  • Updating monthly schedule updates, incorporating progress data from other disciplines.
  • Created S-curves and manpower histograms, providing management with insights on project performance and resource utilization.
  • Conducted schedule analysis and critical path assessments, pinpointing risks and mitigation strategies.
  • Secured compliance with contract stipulations and documentation requirements for effective project planning.
  • Preparing schedule basis documents, aligning with project scope and timeline expectations.
  • Optimized efficiency by managing resource loading throughout engineering, procurement, and construction phases.
  • Led schedule reviews, analyzing float, delays, and mitigation plans for timely project delivery.
  • Generated detailed reports on a bi-weekly and monthly basis encompassing progress tracking, workforce distribution, and adherence to schedules.

Planning Engineer

SAIPEM
KUWAIT
10.2017 - 07.2022
  • Prepared master schedules and detail schedules for EPC
  • Ensured proper resource loading and manpower optimization to prevent bottlenecks.
  • Monitored subcontractor schedules, ensuring smooth integration with the overall project plan.
  • Developed weekly and monthly reports tracking progress, milestones, and forecasted trends.
  • Assisted in delay analysis and contractual claims preparation through impact assessments.

Planning Engineer

ARVI ENTEC
VISAKHAPATNAM
01.2017 - 09.2017
  • qwertyui
  • asdfgh

Education

Master of Engineering - Environmental Engineering And Management

ASIAN INSTITUTE OF TECHNOLOGY
THAILAND

Bachelor of Technology - Civil Engineering

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY
KAKINADA

Skills

  • Project scheduling
  • Critical path analysis
  • Resource allocation
  • Schedule optimization
  • Risk assessment
  • Report generation

PROFESSIONAL SKILLS

  • Primavera P6 Version 24
  • Microsoft Office
  • Power BI Desktop

DECLARATION

I hear by declare that the information furnished above is true to the best of knowledge and belief.

                                                                                                                                      Lakshman Kumar

Timeline

Planning Engineer

PETROFAC
08.2022 - Current

Planning Engineer

SAIPEM
10.2017 - 07.2022

Planning Engineer

ARVI ENTEC
01.2017 - 09.2017

Master of Engineering - Environmental Engineering And Management

ASIAN INSTITUTE OF TECHNOLOGY

Bachelor of Technology - Civil Engineering

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY
LAKSHMAN KUMAR .B