Highly motivated and skilled professional with total 4 years of experience in Process Designing, Commissioning and Production Operation. To work on a challenging job profile that empowers me technically and helps develop new insights leading towards growth and fulfillment in my professional and personal life.
HPCL Mittal energy Ltd, HPCL Mittal energy Ltd is engaged in cracker unit having capacity process 1200 KTPA of ethylene and 500 KTPA of propylene (LUMMUS TECHNOLOGY). major products are H2, C1, C2, C3, C4 etc.…, Make regular routine checks off all equipment’s and units to ensure that they are functioning correctly in accordance with standard operating procedure., Participates in planned plant shut down procedure preparation like preparing isolation list, blind list, and equipment hand over procedure Responsible for smooth shut down and start-up of the plant., Co-ordinate with maintenance departments (Mechanical, Electrical and Instrumentation) for smooth and efficient functioning of unit., Carryout safe Shut down, Start-up and Changeover of equipment’s., Load run and operation test procedure., P&ID checking, tracing and punch list., Rotomol, PSSR, logic checking, stroke checking, Structural Inspection, Lube Oil Flushing, nitrogen inerting, chemical cleaning., Column &Vessel Inspection, Walk Through, Punch Point list Raising, pressure survey etc..., Analysis PFD, P&ID and Safety Stander’s in Field activities., Assisted with vendor for compressor start up like compressor turbine solo run, LO system logic check, seal system., I have pre- commissioning, commissioning and running plant experience of gas cracker unit like leak test, flushing, PDP, cardboard blast, steam turbine solo run, cleaning witness, rotomol, PSSR, logic checking, stroke checking, lube oil flushing, MRT, nitrogen inerting, walk through, punch point raising, chemical cleaning., Contributed and participate in successful completion review of plant standard operating procedures, Cause and Effect, DCS function test., DCS graphic check, loop check, Control Narrative and cause and effect., Process Inspection and auditing., Issuing and receiving work permits and LOTO procedure for day-to-day operation and during shutdown of the unit., Issuing confined space entry during inert atmosphere while catalyst unloading of the unit., Ensure strict compliance with safety procedure, work permit procedure., Process safety Management compliance., Deluge valve and sprinkler system operation., Handling Trouble shooting & Emergency of the plant.
B448, BPCL, Uran Refrigerated Double Wall Storage Tanks {DWST} for Debottlenecking and Augmentation of Cryogenic Facilities-LPG Import Terminal PRIVI SPECIALIY CHEMICALS LIMITED, mahad
I do hereby declare that the information furnished above is true to the best of my knowledge and belief.