Summary
Overview
Work History
Education
Skills
Trainings
Accomplishments
Affiliations
Hobbies
Quote
Timeline
BusinessDevelopmentManager

LOVEPREET SINGH

Senior Executive
Greater Noida,Greater Noida

Summary

Efficient,accuracy-driven, result oriented successful at delivering key support to internal teams, customers, vendors and other stakeholders. Successful at stepping into diverse positions and making immediate positive contributions. Focused on optimizing operations and seeding culture, customer-centricity among diverse individuals of the team with clear and effective communication.

Overview

5
5
years of professional experience
6
6
years of post-secondary education

Work History

Senior Executive

Firm-Noida Power Company Limited
Greater Noida, Uttarpradesh
07.2016 - Current

Operations and Maintenance Nov,2019- Current

  • Coordination with management, technical crew members and fellow supervisors for efficient operations.
  • Assessed power supply related issues in real time in 95 sq kM area under division's jurisdiction.
  • Implemented (N-2) Contingency Plan , helping in revamping the reliability in the distribution scheme of 5 sectors.
  • Maintained the breakdown percentage of 0.09%, which is the industry wide benchmark.
  • SAP related jobs like order creation, approving technical feasibility, complaints closing, check consumer reading, to obtain BI report monthly etc.
  • Manage the contractor teams for timely completion of projects and to verify the site after work completion and then update the same in GIS (Geographical Information System).
  • Preparation of the SOPs for each and every job carried out by division and also verify their implementation on site through surprise audits to ensure compliance of safe and healthy practices.
  • Planning and erection of new overhead conductor and underground cables for 33 and 11 kV Voltage level.
  • Maintenance of switchgear in 33 kV GIS and Non GIS Substations.
  • Periodic maintenance of 33 kV and 11 kV overhead networks to improve supply reliability.
  • Rectification of 33 & 11 kV feeder breakdowns within 2 hours as defined in SLA.
  • RMU, Transformer, feeder pillar installation and maintenance.
  • To prepare monthly energy audit report to analyze the losses and prepare action plan to mitigate them.
  • Distribution T/F cleaning and metering to reduce the losses.
  • To prepare an action plan to reduce the supply outage time by analyzing monthly feeder outage report .
  • Spearheaded cross-functional initiatives across departments to achieve business goals for bottom-line profits.
  • Employed optimal safety practices to reduce work site complaints, hazards, incidents or lost-time accidents to improve overall OSHA scores and expand bid opportunities.
  • Created and made appropriate documentation for annual budgets and senior leadership goals.
  • Established performance goals for department and provided methods for reaching milestones.
  • Evaluated product development strategies and prepared alternative approaches to exceed goals.

Metering Department July 2016-Oct 2019

  • Installation of HT as well as LT meters
  • Conceptualized, designed & implemented the group meter rectification process to obtain the meter data through AMR using DCUs
  • Preparation of energy consumption report for energy units assessment and for check meters to confirm the accuracy of the installed meters
  • Managing meter data downloading through AMR and rectification of AMR failure cases
  • Responsible for meter testing as well as other issues related to LT and LT-CT meters
  • Resolved the smart meter connectivity issue by coordinating with Vendor team
  • Designed user manual for prepaid meters (uploaded on NPCL website)
  • Improved meter inspection & replacement certificate format to be filled by NPCL representative at site
  • Built an in-house device to reduce the CT-PT failure cases in HT- meters using microcontroller based temperature and Humidity sensor
  • Prepared and finalized the design of single phase push-fit meter box to reduce the electricity theft
  • Installation of net meter and generation meter for solar energy calculation
  • Member of the team of a project called cyclo aimed to reduce the time of site inspection by our engineers by using mobile phone app to input all the relevant data and observations directly into the system without entering first into register and then will be entered into system by data entry operator.

Education

Bachelor of Technology - Electrical Engineering

NATIONAL INSTITUTE oF TECHNOLOGY
KURUKSHETRA
07.2012 - 06.2016

Class XII -

KAMLA MONTESSORI SCHOOL
SIRSA
04.2011 - 03.2012

Class X -

ARMY SCHOOL
SRI GANGANAGAR
04.2009 - 03.2010

Skills

    Smallworld Electric Office by GE (GIS)

undefined

Trainings

Ø AUTOMATION USING PLC-SCADA . June-July 2015

  • Completed the practical training in PLC and SCADA.
  • Understood the functioning and Programming of following PLCs:-

I. Allen-Bradley’s MicroLogix 1000

II. Siemens’ S7-224

  • Programming of SCADA on Wonerware’s InTouch Software and the hardware Communication between PLC and SCADA

Ø Summer training at Super thermal Power plant, Suratgarh June-July 2014

  • Understood the complete process of electricity generation in a thermal power plant by running steam turbines using pulverized coal.
  • Understood the practical technicalities and safe practices of the onsite work to be kept in mind while working in a thermal power plant.

Accomplishments

    1.VIDHWAAN

  • Designed the layout of generating stations, switchyard, distributions and feeder lines along with protection scheme of the whole system, reactive compensation for the whole system
  • 2.SOLAR TRACKING SYSTEM

  • A project on microcontroller based single axis solar panel tracking system to enable more energy to be generated because by using it solar panel will be able to maintain a perpendicular profile to the sun’s rays and solar energy produced will be maximum
  • 3.CT-PT HUMIDITY LEVEL ALERT SYSTEM

  • A project designed to reduce CT-PT bursting in case of HT meters in NPCL by continuously monitoring their humidity and temperature value and alerting the responsible person whenever its value crosses the permissible limit through SMS using GSM communication
  • 4.Power Factor Improvement with Modified Phase Controlled Converter

  • Spearheaded a four-member team to develop a design to obtain high power factor using Phase Controlled Converter in MATLAB
  • Implemented Cosine control scheme to increase the overall efficiency of the system
  • 5.INTERACTIVE PREPAID METER DISPLAY UNIT

  • Designed an Arduino based interactive prepaid meter display unit to increase the consumer awareness regarding prepaid meter and to encourage the consumer to adopt prepaid metering.

Affiliations

  • Secured 1st Position for Quality circle at NPCL's BE event 2019 for “reduction of negative amount of prepaid consumers”.
  • Secured 1st Position in Vidhwaan at TECHSPARDHA 2015, NIT Kurukshetra
  • Bagged prizes in debates and extempore held at school level.

Hobbies

Watching and playing Sports (Cricket, Badminton, table tennis).

Reading News

listening Music

Watching Movies and TV series

Quote

I cannot believe the purpose of life is to be happy. I think the purpose of life is to be useful, to be responsible, to be compassionate. It is, above all, to matter, to count, to stand for something, to have made some difference that you lived at all.
Leo Rosten

Timeline

Senior Executive

Firm-Noida Power Company Limited
07.2016 - Current

Bachelor of Technology - Electrical Engineering

NATIONAL INSTITUTE oF TECHNOLOGY
07.2012 - 06.2016

Class XII -

KAMLA MONTESSORI SCHOOL
04.2011 - 03.2012

Class X -

ARMY SCHOOL
04.2009 - 03.2010
LOVEPREET SINGHSenior Executive