Summary
Overview
Work History
Education
Skills
Workhandling
Handledprojects
Software
Personal Information
Disclaimer
Timeline
Generic
M. MOHAMED NAZEEM

M. MOHAMED NAZEEM

CIVIL ENGINEER
Bangalore

Summary

A hardworking, pro-active with an upbeat and positive attitude, who is looking for an opportunity to make a big difference in a business that, is moving forward. Possessing a track record of successful completion of handling Civil Engineer works for prestigious projects including major bridge construction, Metro train construction and Buildings. Proven ability to manage to develop designs to Satisfy technical specifications and Ability to manage site work whilst having an active and dynamic approach to work and getting things done efficiently.

CAREER SUMMARY Metro Rail Construction. Major bridge Construction. Building constructions. 2D drawing using AutoCAD. Ability to manage site work. Having excellent communication skill in English, Hindi, Tamil and Kannada

Overview

16
16
years of professional experience
4013
4013
years of post-secondary education
4
4
Languages

Work History

Assistant Executive Engineer

BANGALORE METRO RAIL CORPORATION AND LIMITED
01.2017 - Current
  • Project: Construction of Metro Rail Viaduct & Stations (R5 Line) – Bangalore Metro Project, Phase 2
    Location: Hosa road to HSR Layout ( Chainage: 12173.092m to 5788.52m)
    Length: 6.385 KM (Approx.)
    Number of Stations: 6 Elevated Metro Stations
    Project Cost: Rs. 700.35 Crores

Sub structure works:

  • Deep Piling, Excavation, Pile cap Foundation
  • Below super structure works like Base Slab, Footings, Cable Galleries, Earth Mats, sumps, UPE ducts, Drainage system, Chambers, water proofing.

Super Structure works:

  • Construction of Pier column, Pier head, Columns like Square, Circular, Elliptical and Rectangular.
  • Base slab, Concourse slab, Platform slab and Roof slab, Girder 25M, 28M Post Tensional Method, FSLM (Full span launching Method), PSM (Post Tensional Segment Method)

Finishing works:

  • Block work with Plastering, Glazing wall and interior works.
  • Anti dust painting, Structural Painting, Texture Painting, Intimation Paint, Emulsion Paint, Bubble paint.
  • Flooring: Granite, Tiles, False flooring, Concrete flooring, Anti-static membrane with flooring, Edge granite & Tactile Floorings, yellow strip flooring, colored flooring.
  • MS Railings, SS Railings, Glazing's, Fire Rated doors, MS doors, GI Doors, Rolling Shutters, and Louvers.

Senior Engineer

Soma Enterprise Ltd
01.2014 - 01.2017
  • In this metro rail constructions, I had been involved various works in the sub structure and super structure of both Stations and viaducts
  • I had a well knowledge about in Pile foundations, construction of Piers & pier caps, pre stressing related works and Pre stressed Girders
  • I had been looking forward the structural and architectural finishing work at stations related works
  • Execution of the civil structure work of both viaduct and stations
  • Monitoring the safety measures and precautions
  • Timely completion of activity with Quality & Safety measures
  • Estimation of cost control, Planning & QS department to achieve successful Physical and financial completion of the project
  • Day to day supervision of the construction activities to monitor the progress
  • Interpretation of engineering drawings
  • Management & Execution of entire site project

Site Engineer

PUNJLLOYD Limited
01.2012 - 01.2014
  • Completion of piles, pile cap, and piers
  • Completion of concourse level transverse beams, and platform level transverse beams
  • Completion of track slabs, and platform slabs
  • Completion of concourse level such as concourse edge beam, ass rooms, operational rooms, stair cases, and floating columns and beams
  • Completion of platform levels such as RCC girder erection and transition slabs, expansion joints
  • Completion of Block work, Brickwork, plastering and painting also
  • Completion of False Flooring, False sealing, Granite laying, etc …
  • Completion of roof truss erection

Site Engineer

ECCI Limited
01.2009 - 01.2012
  • Project name: MAJOR BRIDGE CONSTRUCTION
  • Completed Pre-Stressing I – girders (post tensioning) concreting and both stressing and grouting
  • Completed over all sub structures such as earth work, excavation, Raft foundations, piers, abutments, pier caps
  • Completed super structures such as pedestal, Bearing fixing, deck Slabs, cross barriers, foot path and approach slabs
  • Completed minor bridges (cannels) in NH9

Education

H.S.C -

State Board

S.S.L.C -

State Board

BACHELOR OF CIVIL ENGINEERING -

Sun Institute of Technology
01.2005 - 01.2009

Skills

  • Planning and managing works of all disciplines to ensure compliance with the relevant contract requirements specification and standards, safety cases etc

  • Review and monitor site inspector’s performance to ensure works are being conducted to the approved methodology, specific method of statements, risk assessments and ITP’s (Inspection and Test Plans)

  • Review of construction/engineering methods, procedures, policies and ITP’s to ensure the Contractor is in compliance

  • Review and final approval of daily IR inspection request submitted by the main Contractor

  • Review method of statements, shop drawings, material approvals, and variation orders, structural and architectural designs

  • Interface with the design team on the resolution of technical problems and ensure that all drawings are approved and issued for construction with the latest revision

  • Monitor the implementation of the Contractor’s Quality control program and inspect the work executed upon the inspection requests (IRs) issued by Contractor

  • Monitor all necessary license and permits are in place

Workhandling

  • Planning and managing works of all disciplines to ensure compliance with the relevant contract requirements specification and standards, safety cases etc.
  • Review and monitor site inspector’s performance to ensure works are being conducted to the approved methodology, specific method of statements, risk assessments and ITP’s (Inspection and Test Plans).
  • Review of construction/engineering methods, procedures, policies and ITP’s to ensure the Contractor is in compliance.
  • Review and final approval of daily I.R. inspection request submitted by the main Contractor.
  • Review method of statements, shop drawings, material approvals, and variation orders, structural and architectural designs.
  • Interface with the design team on the resolution of technical problems and ensure that all drawings are approved and issued for construction with the latest revision.
  • Monitor the implementation of the Contractor’s Quality control program and inspect the work executed upon the inspection requests (IRs) issued by Contractor.
  • Monitor all necessary license and permits are in place.

Handledprojects

 METRO RAIL CONSTRUCTION

  • Bangalore Metro Rail Corporation Limited, Bangalore, 07/2017 - Present,

       Construction of Metro Rail Viaduct & Stations including Architectural Finishing works., Viaduct & stations of length 6.385 KM (approx)

  • Soma Enterprises Limited, Kochi, 12/2014 - 07/2017,

        Construction of Metro Rail Viaduct & Stations including Architectural Finishing works. Involved various works such as sub structure and super structure of both Stations and viaducts.

  • PUNJLLOYD Limited, Bangalore, 03/2012 - 11/2014

        Construction of Metro Rail Stations including Architectural Finishing works.


MAJOR BRIDGE CONSTRUCTION

  • EAST COAST CONSTRUCTION & LTD, 09/2009 - 02/2012

        Construction of Major Bridge including the work of Pre-Stressing I – girders (post tensioning). 

Software

AUTO CADD

MS OFFICE

Personal Information

  • Passport Number: U7007075
  • Date of Birth: 30/07/1988
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married

Disclaimer

I hereby declare that all the statements made in this application are true to the best of my knowledge and belief.



Signature:


Date:  

                                                                                                                                             

Place:                                                  

                                                                                               

                                                                                                                                              


Timeline

Assistant Executive Engineer

BANGALORE METRO RAIL CORPORATION AND LIMITED
01.2017 - Current

Senior Engineer

Soma Enterprise Ltd
01.2014 - 01.2017

Site Engineer

PUNJLLOYD Limited
01.2012 - 01.2014

Site Engineer

ECCI Limited
01.2009 - 01.2012

BACHELOR OF CIVIL ENGINEERING -

Sun Institute of Technology
01.2005 - 01.2009

H.S.C -

State Board

S.S.L.C -

State Board
M. MOHAMED NAZEEMCIVIL ENGINEER