To be a part of an organization where I can fully utilize my skills and make a significant contribution to the success of the employer and at the same time my individual growth.
Overview
20
20
years of professional experience
Work History
Manager-Change management (Program team)
Ola Electric Technologies Pvt Ltd
10.2023
Developing change management plans for projects and/or change initiatives
Evaluating the impact of planned organisational change
Identifying and managing anticipated resistance to change
Leading change management work streams with a structured methodology / process
Supporting development of communications relevant to change initiatives
Providing coaching and training to employees at all levels
Providing reporting and other updates to management and project teams
As a change manager to identify & Assigning respective stake holder to participate (Engg, Sourcing, PPC, Quality, S&OP, etc..)
Asst. Manager-PLM team
Renault Nissan Technology & Business center India PVT. LTD
07.2011 - 10.2023
Oversee job deliveries by reviewing the status and close monitoring
Development, Creation & Issuing of all kinds of Planning/Production/Prototype Design Release Notes, Spec Tender Notice, ECN & Bill of Materials Generation (Part Structure & Part List) in G2B (Group Global BOM-NISSAN Specific)
Engineering Design Release process at all stages of vehicle development
Support/communicate with design engineers located at Nisan technical centres (Japan)
Implementation of Product Lifecycle management system in different phases
The phases include BOM management, data sharing across different sites
Identify business expansion area and negotiate with corporate by exhibiting advantages and catalyse business transfer
Conduct One2One with all reportees to understand their feedback about management and improve on gap areas
Monitor Skill-up, KPIs, WL-WF, vendor performance Interaction with External Entities for planning matters
Co-ordinate the team members to achieve the FTR & OTD for Design Release process
Exceptional Knowledge on Product Data Management, Design Release Process, Business Expansion Development
Analyze Designer requirements and expectations on Design Release of Vehicles, Functions, Variants, Optional Spec's and Parts Structure and cater to the same
Supporting the Design Admin Team for creating Model Codes, Prototype order number, Prototype test section codes, Part numbering / drawing numbers in ERP systems.
EDS Releaser
Deputation for Caterpillar (Engineering Design Center-India) from GGS Information services India PVT. LTD
07.2008 - 07.2011
EDS releasing is to check the engineering drawing tiff and notice information and ensure both are matching together also check as per CPPS standards for as many as 5 Facilities and releasing through Team center Enterprise and Team center Engineering
Documentation of Class a BOM, checking all kinds of Part lists and Creating Change Notices, release notices, all other kinds of notices and Release the drawing in EDS into Production after met with the customer satisfaction needs and the company standards
Check the facility specific requirements are updated on the engineering drawing and Notice
Using HVC & EDS (Engineering data system) software to check the drawings and change notice
To upload the Pro-E generated raster tiff into the EDS (Engineering Data Systems) database Using Son of Sugr.
CADD ENGINEER
Deputation for WABCO-TVS (INDIA) Limited (Leader in Brakes Application Plant II) from JASLEY CADD SERVICE
07.2005 - 07.2008
Internal Customer service for the current products
Engineering Change Notes (ECN Preparations)
Develops detailed product drawings of new or revised products
Creates Bill of Materials & Model-checking Quality through model Best Practice
Develops product drawings based on specific customer application requirements
Job involves Product Design and conversion of 2D drawings into Pro/e and Re-engineering, checking the Design (Models developed) to Quality standards as per WABCO standards
Preparing scheme for new products using Acad.
CAD DRAUGHTS MAN
VALTRACK SYSTEMS PRIVATE LIMITED
01.2004 - 06.2005
Job involves Conversion of 2D Hard copy drawings into AutoCAD 2D Soft Copy's
Having Good Knowledge in Part Modeling, Assembly and Detailing in Pro/e
Components Modeled for Gearbox housing & Cylinder block.
Education
MBA - Project Management - undefined
Alagappa University, Alagappa
B.E - Mechanical - undefined
Sathyabama University, Sathyabama
Diploma in Mechanical Engineering - undefined
CPCL Polytechnic of College, Anna
Skills
Having 19 years' experience in Automobile Engineering field
Summary Of Experience
Ola Electric Technologies Pvt Ltd, Strategy & Planning, 10/2023 - Present, Manager-Change management (Program team), PLM Team center (Product lifecycle Management), Developing change management plans for projects and/or change initiatives., Evaluating the impact of planned organisational change., Identifying and managing anticipated resistance to change., Leading change management work streams with a structured methodology / process., Supporting development of communications relevant to change initiatives., Providing coaching and training to employees at all levels., Providing reporting and other updates to management and project teams, As a change manager to identify & Assigning respective stake holder to participate (Engg, Sourcing, PPC, Quality, S&OP, etc..)
Renault Nissan Technology & Business center India PVT. LTD, GDRC-Nissan specific (Global Design Release Center), 07/2011 - 10/2023, Asst. Manager-PLM team, Design Release tool - G2B (Group Global BOM), Oversee job deliveries by reviewing the status and close monitoring., Development, Creation & Issuing of all kinds of Planning/Production/Prototype Design Release Notes, Spec Tender Notice, ECN & Bill of Materials Generation (Part Structure & Part List) in G2B (Group Global BOM-NISSAN Specific)., Engineering Design Release process at all stages of vehicle development. Support/communicate with design engineers located at Nisan technical centres (Japan)., Implementation of Product Lifecycle management system in different phases. The phases include BOM management, data sharing across different sites., Identify business expansion area and negotiate with corporate by exhibiting advantages and catalyse business transfer., Conduct One2One with all reportees to understand their feedback about management and improve on gap areas., Monitor Skill-up, KPIs, WL-WF, vendor performance Interaction with External Entities for planning matters, Co-ordinate the team members to achieve the FTR & OTD for Design Release process., Exceptional Knowledge on Product Data Management, Design Release Process, Business Expansion Development., Analyze Designer requirements and expectations on Design Release of Vehicles, Functions, Variants, Optional Spec's and Parts Structure and cater to the same., Supporting the Design Admin Team for creating Model Codes, Prototype order number, Prototype test section codes, Part numbering / drawing numbers in ERP systems., Has attained BOM Checker & Trainer Level certified from NML Japan., Successfully completed the 6 month onsite support in NML, Japan for Body team @2013, Achieved the 100% Quality in design release during an Onsite support., Got recognized & awarded the POB (Pat on the back), We had an opportunity to Share and Display Our Team capability of Design Release management with MD GEMBA visit on Jan 2016., Successfully completed PSM (Parts Spec Matrix) trail in NML, Japan @2019.
Deputation for Caterpillar (Engineering Design Center-India) from GGS Information services India PVT. LTD, EDC-India (Releasing Team), 07/2008 - 07/2011, EDS Releaser, Design Release tool- EDS, HVC & Team center Enterprises., EDS releasing is to check the engineering drawing tiff and notice information and ensure both are matching together also check as per CPPS standards for as many as 5 Facilities and releasing through Team center Enterprise and Team center Engineering., Documentation of Class a BOM, checking all kinds of Part lists and Creating Change Notices, release notices, all other kinds of notices and Release the drawing in EDS into Production after met with the customer satisfaction needs and the company standards., Check the facility specific requirements are updated on the engineering drawing and Notice., Using HVC & EDS (Engineering data system) software to check the drawings and change notice., To upload the Pro-E generated raster tiff into the EDS (Engineering Data Systems) database Using Son of Sugr, I got the appreciation from USA Caterpillar branch and I got the reward for "Employee of the Month - February 2011"from GGS Information services India PVT.LTD.
Deputation for WABCO-TVS (INDIA) Limited (Leader in Brakes Application Plant II) from JASLEY CADD SERVICE [JCS - Jasley CAD Service, an engineering services company clients- T.V.Sundaram Clayton, TRIAD, Brakes India, and some other industries at SIDCO Industrial Estate], R&D, 07/2005 - 07/2008, CADD ENGINEER, Pro/ENGINEER, AutoCAD, Internal Customer service for the current products., Engineering Change Notes (ECN Preparations), Develops detailed product drawings of new or revised products., Creates Bill of Materials & Model-checking Quality through model Best Practice., Develops product drawings based on specific customer application requirements., Job involves Product Design and conversion of 2D drawings into Pro/e and Re-engineering, checking the Design (Models developed) to Quality standards as per WABCO standards., Preparing scheme for new products using Acad., Compressor Assembly - NLC 460cc, 230cc, 160cc, Hino and Iveco., Automatic slack adjuster (160mm, 140 mm straight, 16 mm offset (LH, RH) 43 mm offset., Graduated Hand Control Valve & Actuator Assembly - SBA Type 30-30, Type 24-24, Type 9-9, Double Diaphragm SBA Type 24-75, etc., Wind Off Rod Assembly., Drying and distribution Unit., Casting (SC, GDC and PDC): All the Valve Bodies stated in Assembly exposure., Compressor Cylinder Head, Cylinder Block, Connecting Rod and Crank Shaft., Machining: All the Valve Bodies stated above. All the Components in Compressor, Sheet Metal Components: Clamp Ring, Pressure Plate, Non Pressure Plate, SBA Cylinder, Steel Ram, Push Plate, Stopper, Spring Retainer and Circlip.
VALTRACK SYSTEMS PRIVATE LIMITED, 01/2004 - 06/2005, CAD DRAUGHTS MAN, Pro/E 2001, AutoCAD 2000, Job involves Conversion of 2D Hard copy drawings into AutoCAD 2D Soft Copy's., Having Good Knowledge in Part Modeling, Assembly and Detailing in Pro/e., Components Modeled for Gearbox housing & Cylinder block
Personal Information
Date of Birth: 07/13/83
Marital Status: Married
Disclaimer
I hereby declare that the information furnished above is true to the best of my knowledge.
Timeline
Manager-Change management (Program team)
Ola Electric Technologies Pvt Ltd
10.2023
Asst. Manager-PLM team
Renault Nissan Technology & Business center India PVT. LTD
07.2011 - 10.2023
EDS Releaser
Deputation for Caterpillar (Engineering Design Center-India) from GGS Information services India PVT. LTD
07.2008 - 07.2011
CADD ENGINEER
Deputation for WABCO-TVS (INDIA) Limited (Leader in Brakes Application Plant II) from JASLEY CADD SERVICE
Manager Admin & Corporate Services (CEO's Office) at ANI Technologies, Pvt Ltd, OLA Electric Technologies Pvt Ltd,Manager Admin & Corporate Services (CEO's Office) at ANI Technologies, Pvt Ltd, OLA Electric Technologies Pvt Ltd,