Certification of Appreciation from Ved Engineering Company on successful completion of training of Operation and Handling of Automatic Road Unevenness Recorder ( Bump Integrator / Roughometer) from 24.09.2002 to 27.09.2002 .
Special Works :-
Resolved Development of Rutt Formation on the Main Carriage way due to continuous Movement of Over Loaded traffic of Mineral Vehicles on Orai - Bhognepur - Barajod section of NH25 and NH2 by Introducing Stone Matrix Asphalt Mix Grade 1 in the section on LHS Carriagway for an Length of about 30km a width of 8m carriage way.
Supervised Major change in Bearing from Ball Socket Joint Bearing to Central Hinge Bearing by Mageba (Metco Industries Limited ) on Old bridge having 18 spans a change of 36 Bearings in the Year 2009-10 in Orai - Bhognepur section of NH 25.
Claim with NHAI Authorities / DM Local administration on old Kalpi Bridge and orai - bhognepur carriage way due to continous day and night movement of over load traffic movement on detailed reports carried out by CRRI on distress/ deformation of carriage way on this basis it was found Axle load test and WIM machine test careered out find the actual VDF which was 28.5 instead of 3.5 and axle loads of 10 years was 344MSA instead of 56 MSA.
Introduced Modern software of the time Raod estimator , caddinan autocadd OS windows 10 etc in Project handled for quick, precision and accurate workings.
As a AGM Independently Completed a detailed survey Inventory report, using Micro soft Excel , which was made for 108 km stretch consisting of 55 roads, in the City of Hyderabad Serlingampally zone, Design of 42 Junctions of Cybrebad SLP zone with latest IRC/ safety Norms , under comprehensive Road Maintenances Project ( CRMP ) a valiant initiative by Govt of Telegana to privatize the Hyderabad road to well Reputed Multinational companies and carried out complete DBM and BC laying of Both the carriage way in a time limit of 2 years a tune of 60000 cum from 2019 to 2021 in COVID Pandemic Period also taking every precautinary steps..
Constructed VDCC road in 52 Main City Water logging stretches of Cybrebad Hydrebad city making the road in Excellent Motorable conditions getting over all appreciation from all ends .
Constructed completed Huge numbers of road furnitures items , such as Jersey crash barriers, Thermo plastic paints with rumble strips, cateyes, Table Top model in accident prone zones, designer signages with all form /shape , modern delinators, street lights of various designs, artisitic painting of bridges , walls, terracotta paintings, modern painting art works etc complete in city as a part of CRMP Project from 2019 to 2021.
Complete on time , Rehabilitation/ Upgrading of Garamore to Samakalyali section of NH8A from 182+600 to 305km including 32 cluverts . 7 underpass , major bridge of surbari river on creek area , grade separator at samakali junction on time and handed over to NHAI authority. form 2005 to 2008. a stretch of 120.4 km with complete coordination, team work, with quality as per standards.