Summary
Overview
Work History
Education
Skills
Certification
Roles And Responsibilities
Internship
Projects
Websites
Languages
Accomplishments
Timeline
Generic

Maitry Desai

Jamnagar

Summary

Results-driven Instrumentation Manager with over 3 years of experience at the world's largest refinery, excelling in automation engineering, maintenance, and project management. Adept at troubleshooting, safety management, and material coordination, with expertise in calibration, commissioning, and control system modifications. Proficient in SAP MM for spare management and project documentation. Skilled in leadership, communication, and Microsoft Office, with a strong background in materials management and a commitment to delivering high-quality results. Known for implementing strategies for cost savings and resource optimization, recognized for developing a database system that improved data accuracy, and reduced manual errors. A proactive professional with a proven track record in overseeing complex projects and driving operational excellence.

Overview

4
4
years of professional experience
1
1
Certification

Work History

Instrumentation and Control Engineer

Reliance Industries Ltd.
Jamnagar
02.2021 - Current
  • Collaborated with technicians on repair procedures for malfunctioning instruments or components within the system.
  • Provided technical support in the form of guidance, advice and training on instrumentation and controls projects.
  • Optimized process control parameters to maximize safety, product quality and production efficiency.
  • Maintained records pertaining to changes made during maintenance activities or repairs performed on equipment.
  • Reviewed engineering drawings and specifications for accuracy prior to implementation of new systems.
  • Analyzed plant data and designed modifications to improve performance of the process control system.
  • Monitored operational performance of instrumentation systems throughout the plant facility from a centralized location.
  • Identified areas where improvements could be made in terms of cost savings or increased efficiency.
  • Developed and implemented instrumentation and control systems to ensure efficient operation of process equipment.
  • Programmed PLCs using ladder logic diagrams or other programming tools as required by the project.

Education

BACHELOR OF INSTRUMENTATION AND CONTROL -

DHARMSINH DESAI INSTITUE OF TECHNOLOGY
NADIAD

HSC -

LATE C.B. KAPADIA AND L.C.KAPADIA HIGH SCHOOL

SSC -

J.H.AMBANI , SARASWATI VIDYAMANDIR

Skills

  • Process Automation Engineering
  • Maintenance & Reliability
  • Project Management
  • Erection & Commissioning
  • Material Management
  • Troubleshooting
  • Safety/Hazard Management
  • Reports & Documentation
  • INSTRUMENT (Pressure/Flow/Temperature/level) Transmitter INSTALLATION, CONFIGURATION UPTO DCS
  • CONFIGURATION
  • SIEMENS PLC Commissioning
  • CEMS Analyzer Commissioning
  • MOCs (MANAGEMENT OF CHANGE)
  • Chlorine scrubber in cooling tower
  • 2oo3(2 out of 3) SOV implementation in critical Valve
  • TURNAROUND/SHUTDOWN ACTIVITIES
  • Compressor
  • System
  • AB PLC Control Logix 500
  • PHA, HAZOP, What IF, LOPA, RCA & FMEA
  • SIS & SIL Calculation of Emergency Shutdown System Loops
  • International standards like ISO9001, IEC 61508/61511
  • Alarms Rationalization

Certification

  • Six Sigma principles
  • Google Data Analytics (SQL, Tableau, R-programming)
  • RSO (Radiation Safety Officer) by BARC (Bhabha Atomic Research Center)

Roles And Responsibilities

  • Maintains timely completion of all Control System related activities like Loop Wiring, installation/configuration of IO Card/ CP/Communication Module, Logic Checking, Motor Simulation & Instrument-Electrical signal interface Checking, Logic implementation/modification in DCS/PLC, Serial Link from PLC system to DCS, Instrument Range (URV/LRV) modification, Alarm Rationalization, Historian configuration.
  • Installation of process Instruments such as Pressure, Differential Pressure, Flow Transmitters as per specified Hook up (Process Connection) Drawings, which includes Impulse Piping/Tubing/Leak Testing etc.
  • Maintenance, Configuration & Calibration of flowmeters of different make like Electromagnetic, Coriolis & Vortex of Enders Hauser/Emerson, Ultrasonic Flowmeters of SICK, Rotameter of Krohne, Differential Pressure type Flowmeters of Emerson.
  • Maintenance, Configuration & Calibration of Valve Positioners like DVC6000/6200 of Fisher.
  • Spare Management of Critical spares of compressor, DCS, Field Instruments, Control Valves & BOM Creation of the same.
  • Upgrading of FCP280 (Control Processor of DCS) from FCP270 & HMI tag verification and AI/AO/DI/DO block Checking.
  • PID tuning according to process requirements, Control system design changes with MOCs, DCS control block configuration and changes in PID, GDEV, CALCA blocks.

Internship

  • RELIANCE INDUSTRIED LTD., DAHEJ, 05/01/19, 07/31/19, STUDY OXY-REACTOR FAILURE
  • UNITECH TECHNOCRATS PVT LTD., VADODARA, 12/01/19, 03/31/20, AUTOMATED TEST BATCH FOR SOV USING EMBEDDED MODULE AND LABVIEW

Projects

COMISSIONING OF FFP (Feed Flexibility Project)

FCC (Fluidized Catalyst Cracker), INSTRUMENT (Pressure/Flow/Temperature/level) Transmitter INSTALLATION, CONFIGURATION UPTO DCS, NEW PANEL INSTALLATION & WIRING TERMINATION, COLD LOOP CHECKING - FROM FIELD INSTRUMENT TO PANEL, DCS MARSHALLING AND SYSTEM PANEL INTERNAL WIRING AND CABLE LAYING, IRP (INTERPOSING RELAY) PANEL COMISSIONING, Fire& Gas DEVICE LOOP CHECKING AND Cause & Effect Checking, HOT LOOP CHECKING - FROM FIELD INSTRUMENT TO DCS HMI GRAPHICS, CONFIGURATION OF ANALOG & DIGITAL INPUT/OUTPUT SIGNALS IN DCS SYSTEM USING CONTROL NARRATIVES, SIEMENS PLC Commissioning, ESTABLISHES SERIAL LINK CONFIGURATION BETWEEN DCS AND SEIMENS PLC, CEMS Analyzer Commissioning MOCs (MANAGEMENT OF CHANGE), Chlorine scrubber in cooling tower, Instrument (Level Transmitter/On-off Valve/Pressure Gauge) installation/configuration/alarm configuration, Logic development in Foxboro DCS, Fire & Gas Toxic Gas detector installation/Configuration and Logic Checking, Logic modification in DCS blocks, 2oo3(2 out of 3) SOV implementation in critical Valve, Cable lying/4 Solenoid Valve installed, 2oo3 Voting Logic Implemented in Emergency Shutdown System(ESD/PSS). TURNAROUND/SHUTDOWN ACTIVITIES, Compressor, Vibration/Speed Probe Checking/Calibration using TK-3, Cause & Effect Checking, Anti-Surge valve Calibration, System, Barrier/Power Supply Replacement & installation, Relays and barrier replacement, Logic modification and changes in DCS system control blocks using control narratives, C&E checking in ESD system and updation of the same., PID tuning of controllers as per requirement., AB PLC Control Logix 500, Logic Checking, Bypassing Interlocks, Firmware Upgradation

Languages

Gujarati
First Language
Hindi
Advanced (C1)
C1
English
Upper Intermediate (B2)
B2

Accomplishments

  • R-SAMMAN(special reward) for standing alarm reduction logic creation and implementation.
  • Reward for Project Commissioning for pollution control

Timeline

Instrumentation and Control Engineer

Reliance Industries Ltd.
02.2021 - Current

BACHELOR OF INSTRUMENTATION AND CONTROL -

DHARMSINH DESAI INSTITUE OF TECHNOLOGY

HSC -

LATE C.B. KAPADIA AND L.C.KAPADIA HIGH SCHOOL

SSC -

J.H.AMBANI , SARASWATI VIDYAMANDIR
Maitry Desai