I seek challenging opportunities where I can fully use my skills for the success of the organization.
Project :- Widening / Improvement to 4 (four) Lane with Paved Shoulder from Km 81+000 to Km 95+400 [Design Chainage 80+930 To 96+400] of Loring Thepi-Ganapath Gaur Gaon Section (Package 4) of NH 29 in the state of Assam on EPC mode under Bharatmala Pariyojna.
Client :- NHIDCL
Cunsultant :- K&J
Project :- Widening / Improvement to 4 (four) Lane with Paved Shoulder from Km 51+246 to Km 66+000 [Design Chainage 50+710 To 65+923] of Parokhuwa - Dokmoka section (Pakage 2) of NH 29 in the state of Assam on EPC mode.
Client :- NHIDCL
Consultant :- JR Cunsultancy
Project :-Construction of Eight Lane Access-controlled Expressway Carriageway from Ranni Village to Miyati Village of Jhabua district Design Ch (200+300 to 221+350) section of Delhi Vadodara Greenfield Alignment (NH148N) on EPC Mode under Bharatmala Pariyojana in the state of Madhya Pradesh for a total length of 21.05 km and project cost of Rs 847 Crores.
Client :-National Highway Authority of India.
Consultancy :-Dhruv Consultancy private limited.
• Inventory of existing structures to collect information.
• Execution of RCC & PSC girder (Post tensioning).
• Execution of MNB (Minor Bridge), MJB (Major Bridge), VUP (Vehicle under pass).
• Prepare bar bending schedule (BBS).
• To maintain all site records and documents as per specifications.
• Execution and handling of Box Culvert & Precast Item etc.
• To maintain site records and documents as per specifications.