Preparation of bar bending schedule, sub- contractor bills
Reinforcement and cement calculation and its usage according to design
Analyzing drawing plan and its at site execution
Surveying and establishing reference points and elevations to guide construction
Organizing, drafting and documentation of records, plans, updating measurement books
Carrying out quality tests for various construction elements such as aggregates, sand, water, cement, reinforcement, concrete cube tests etc
And ensuring satisfactory results
Checking and inspecting quality of RCC works such as footings, columns, beams etc
Along with PCC and brickworks carried at site
Maintaining quality standards for all structural work
Attending client meetings regarding physical and financial progress of work
PROJECT ENGINEER
M.P. AGARWAL PRIVATE LIMITED
01.2017 - 11.2021
Promoted to the role of Project Engineer within 2 years owing to good performance
Receiving all the required data regarding progress of work, purchase of material, issue & consumption of material, machinery used, labour report etc and analyzing all data to monitoring the physical and financial progress of the project to prevent cost and time overrun and highlighting the bottlenecks
Comparing physical and financial progress with respect to targets fixed
Calculating actual material consumption with respect to theoretical consumption
Calculating cost of execution of major items of works and highlighting the deviations from Calculating quantity and rates
Preparation of work programme and monitoring of the same
Preparing measurements and documenting them on M.B’s
Preparing R.A
Bills
CIVIL ENGINEER
NABARD CONSULTANCY SERVICES (NABCONS)
12.2021 - 05.2022
Rationalization of the cost of construction proposed by the promoter
Inspection of the units in Arunachal Pradesh and Assam
Comments on the built up area with respect to the capacity of the plant being setup
Detailed analysis report along with rationalized cost as per industry experience and market rates
PROJECT ENGINEER
JUPITAR SYNDICATE
08.2022 - Current
Preparation of construction schedule to ensure timely completion of project within stipulated budget
Calculating monthly Targets (quantity wise)
Calculating financial Targets
Calculating Machinery and Resource requirement
Preparing procurement schedule to ensure availability of all required materials well ahead of schedule
Active participation in tendering process including preparation of technical and financial bids
Maintaining work standard according to QAP including conducting on site tests
Liasioning with client officials and expediting payment
Attending meetings with client regarding physical and financial progress of work, discussing on site difficulties and solutions for smooth execution of work
On Role :- FG Warehouse at Mylan Laboratories Limited Pithampur Indore (M.P.)On Role :- FG Warehouse at Mylan Laboratories Limited Pithampur Indore (M.P.)