Summary
Overview
Work History
Education
Skills
Software
Interests
Timeline
HONORS AND AWARDS
DECLARATION
Generic
Mandar Singh

Mandar Singh

PROCESS ENGINEER-MANAGER
Bengaluru

Summary

Process Engineer with a 6-year track record of executing CCPP, FGD & Ash Handling System projects. Specialized in process engineering of Water System & BOP part of Cogen & CCPP projects.

Overview

3
3
Languages
7
7
years of professional experience

Work History

Process Engineer

TATA Consulting Engineers Ltd.
04.2023 - Current
  • Conducted a technical feasibility study for an alternative bottom ash handling system and ash water recovery system at Sabarmati Thermal Power Station (Amgen Unit-D, 120 MW, and Units E & F, 2 × 121 MW), evaluating multiple technologies for efficiency, cost-effectiveness, and environmental compliance. Currently leading the complete design, engineering, and procurement activities for the approved Alternative bottom ash handling and Ash water recovery system.
  • Conducting Technical Feasibility Study, Design Review, Vendor Document Review (VDR), and developing Work Breakdown Structure (WBS), Process Flow Diagrams (PFDs), and Piping & Instrumentation Diagrams (P&IDs) for the proposed relocation of 228 MW Gas-Based CCPP JVK Industries (Jegurapadu-Site-India) to Gabon site-Central Africa.
  • Managed the complete water-process design engineering of 475 MW CCPP Amiral Cogen Plant.
  • Completed Vendor document Review for 475 MW CCPP Amiral Cogen Plant.
  • Led EPC execution of the Flue Gas Desulfurization (FGD) system for (2X600 MW) Anuppur Thermal Power Plant, managing end-to-end activities including engineering, procurement, and construction to ensure timely delivery, cost efficiency, and compliance with environmental standards.
  • Supported on Assignment based tasks such as WBD preparation, System specific-VDR, Calculations, Control philosophy, P&ID & PFD preparations, MR preparation, Line & Valve list preparation.

Process & Equipment Engineer

Mitsubishi Power India Ltd.
06.2020 - 03.2023
  • Handling Damper package for M/s NTPC FARAKKA (3X200 MW & 3X500 MW) STTP FGD Project.
  • Vendor Coordination for Damper package.
  • Preparation of RFQ for Guillotine Gates & Bypass Dampers
  • Vendor Document review of complete Damper package.
  • Generated P&ID schemes & calculation note for FGD systems.
  • Preparation of Valve & Line List, Tagging philosophy for all the P&ID’s

Apprenticeship

Bharat Electronics Ltd.
02.2019 - 02.2020
  • Oversaw production floor for PCB manufacturing, ensuring smooth operations and adherence to quality standards

Education

Bachelor of Engineering - Chemical Engineering

University of Mumbai
Mumbai, Maharashtra
06-2018

Higher Secondary Certificate School Examination - undefined

State Board of Maharashtra
Mumbai, Maharashtra
06-2014

Secondary School Certificate School Examination - undefined

State Board of Maharashtra
Mumbai, Maharashtra
06-2012

Skills

Data analysis

Process development

Team collaboration

Cross-functional teamwork

Project management

Software

AFT-FATHOM

AFT-ARROW

AUTO-CAD

MS-POWERPOINT

ME-EXCEL

MS-WORD

Interests

Cycling, Swimming, Reading & Travelling

Timeline

Process Engineer

TATA Consulting Engineers Ltd.
04.2023 - Current

Process & Equipment Engineer

Mitsubishi Power India Ltd.
06.2020 - 03.2023

Apprenticeship

Bharat Electronics Ltd.
02.2019 - 02.2020

Secondary School Certificate School Examination - undefined

State Board of Maharashtra

Higher Secondary Certificate School Examination - undefined

State Board of Maharashtra

Bachelor of Engineering - Chemical Engineering

University of Mumbai

HONORS AND AWARDS

Published Paper in Journal of Physical Chemistry in Molecular Dynamics Simulation of Amorphous SiO2, B2O3, Na2-SiO2, Na2O-B2O3 and Na2O-B2O3-SiO2 glasses with variable composition and CS2O and SrO as dopants.

DECLARATION

I hereby affirm the knowledge given in this document is correct to best of my knowledge.
Mandar SinghPROCESS ENGINEER-MANAGER