Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline

MANGESH PALEKAR

Assistant Manager - New Installation Fulfilment Support
Vasco da Gama,GA

Summary

Middle Level Assignments – Deputy Manager Qualified professional with diploma in Engineering(Automobile) having 22 years total experience, managing day-to-day operational aspects of projects by effectively applying methodologies that enforce project standards and minimize exposure and risks on projects, Maintenance of Heavy machineries and plants. Currently associated with Schindler India Pvt. Ltd, as a Assistant Manager-New Installation Fulfillment Support(Field Operation); Installing and commissioning the Elevators and Escalators, Designing and Preparation of layout, Planning and arrangement of manpower, Supporting field to close jobs stuck in Quality, Supporting field for Claim material. Sought out continuous professional development opportunities to further develop expertise in [Industry] operations while strengthening support for team members. Resourceful leader with good organizational, multitasking and project management abilities. Discerning and performance-oriented in tackling operational problems.

Overview

18
18
years of professional experience
2
2
years of post-secondary education

Work History

Assistant Manager-New Installation

Schindler India Pvt Ltd
Mumbai , Maharashtra
06.2010 - Current
  • Providing Technical supports to clear the job stuck in the Quality Inspection
  • Supporting field by doing Risk Assessment
  • Coordination with Elevator and Escalator factory for dispatches of additional or claimed material
  • In detail of Analysis on the Claim received from field
  • Responsible for Installing the Elevators and Escalators.
  • Commissioning of the elevator.
  • Responsible for getting clear the jobs from Quality dept.
  • Planning and arrangement of manpower.
  • Checking technical feasibility and giving report for pull the material.
  • Coordination with Sales Engineer for proper input to provide the solution
  • Coordination with customer for preparation of site as per std before material to reach site.
  • Strengthened merchandising and promotional strategies to drive customer engagement and boost sales

Design Engineer

KONE ELEVATOR INDIA PVT.LTD
Mumbai , MH
03.2007 - 06.2010
  • Designing of special brackets for fixing of guide rails.
  • Bill of material.
  • Checking the feasibility with customer drawing.
  • Co-ordination with field people.
  • Responsible for checking the customer Arch.
  • Drawing to fulfill the requirements of IS14665/EN81.
  • Checking the B and C process General Arrangement Drawing (GAD).
  • Responsible to check the error free drawings.
  • Responsible for get it clarify the issues from the sales and field people.
  • Responsible for release the drawings within due period.
  • Preparing the daily due jobs.

Draftsmen

ARIHANT INDUSTRIAL CORPORATION LTD
Vasai , MH
11.2004 - 03.2007
  • Part modeling of water slide equipment's.
  • Part modeling of playground equipment's.
  • Preparing bill of material.
  • Preparing and Checking layout drawings.
  • Preparing manufacturing drawing.
  • Follow up with vendors.
  • Designing water slide layout drawing.
  • Follow up with related departments.
  • Deal with clients, visit industries for development.
  • Documentation like Quotations, Letters, Administrative Work etc.
  • Collaborated with team members to achieve target results

Education

Diploma - Mechanical CAD

CADD Center Borivali, Borivali West, MH
08.2005 - 10.2005

No Degree - Industrial Hydraulic Controls

Advanced Training Institute, Mumbai
04.2003 - 05.2003

Diploma - Automobile Engineering

Shree Vidyadhiraj Polytechnic, Kumta, KA
04.1998 - 04.2000

SSLC -

St. Thomas High School, Honavar, KA
01.1996 - 03.1996

Skills

Auto CAD, Pro/Engineer

undefined

Accomplishments

  • Undergone LIFT DESIGNER training in SWITZERLAND in 2010
  • Certified for Application Engineering Level 1 & Level 2 in 2012
  • Certified as LEAD TRAINER of Goa Branch in 2015
  • Designing and worked in various product development projects in PRO-E, Auto Cad 2008 platform.
  • Knowledge of CATIA V5, Autodesk Inventor, Visual Basic 6.
  • Certificate of Appreciation
  • Top performer of the Goa branch in 2017
  • Certified 5500 Installation & Commissioning

Timeline

Assistant Manager-New Installation - Schindler India Pvt Ltd
06.2010 - Current
Design Engineer - KONE ELEVATOR INDIA PVT.LTD
03.2007 - 06.2010
CADD Center Borivali - Diploma, Mechanical CAD
08.2005 - 10.2005
Draftsmen - ARIHANT INDUSTRIAL CORPORATION LTD
11.2004 - 03.2007
Advanced Training Institute - No Degree, Industrial Hydraulic Controls
04.2003 - 05.2003
Shree Vidyadhiraj Polytechnic - Diploma, Automobile Engineering
04.1998 - 04.2000
St. Thomas High School - SSLC,
01.1996 - 03.1996
MANGESH PALEKARAssistant Manager - New Installation Fulfilment Support