Summary
Overview
Work History
Education
Skills
Accomplishments
Personal Information
Other Curriculum Activities
Languages
Projects
Training
Timeline
Generic
Mangesh Rasote

Mangesh Rasote

Navi Mumbai

Summary

Experienced and proactive Assistant Manager offering 12 years of progressive warehouse settings serving Infra and Datacenter needs. Talented in overseeing cost control, loss prevention and labor management initiatives to streamline and enhance operations. Decisive planner with good communication and problem-solving abilities.

Overview

13
13
years of professional experience

Work History

Assistant Manager

CtrlS Datacentre Pvt Ltd
Chennai
07.2023 - Current
  • Testing & commissioning of air cooled chillers
  • Testing & commissioning of chilled water circuit
  • Testing & Commissioning of Air handling units, PAHU, PAC, VAHU, FWU”s &Dehumidifiers
  • Testing & integration of chillers with CPM (Johnson controls)
  • Verification of operational logics & other conditions as per the sequence of operation
  • Coordination with various stake holders for timely completion of Testing activities Monitoring of energy consumption details and preparation of MIS reports
  • Operation of chillers with optimum SEC (Specific Energy Consumption)
  • Implementation of Energy saving initiatives Preparation of operational SOPs for Equipment's Preparation of drawings
  • Preparation of AOP budgets (Annual operational projections) Maintaining of critical spares & consumables Provided guidance and support to junior staff members on daily tasks, projects, and objectives
  • Coordinated with other departments to ensure smooth flow of operations
  • Established processes for monitoring customer satisfaction levels
  • Communicated regularly with customers to gain insights into their needs
  • Supervised daily operations including scheduling shifts, assigning duties.

CPM Operations and BMS

Data Centre Sustainable skills Capital Pvt Ltd (JCI)
Pune
06.2022 - 07.2023
  • To look after healthiness of chiller and other HVAC equipments
  • Carry out all break down as well as preventive maintenance activity after approval
  • Maintain consumption report, material management report, preventive maintenance and breakdown report
  • Ensure work permits (General, Height, Hot, Electrical, Confined Space etc.) To ensure safety at work site and maintain Accident free site
  • Rectify the issue, resolving the issue with In house team
  • Co-ordinate with vendors to attend the open complaints & PM according to MOP
  • To create MOP for Carried out Activity
  • To implant the changes in system with co-ordination of project team & vendor with Management approval according to MOP
  • To create SOP & EOP for Equipment
  • Maintaining the critical spare list
  • Maintaining the material tracker of store
  • Maintaining the excel sheets (Daily Reports, PM Reports, Complaint Reports)
  • Generating the reports from system on daily basis
  • Monitoring the BMS system - If alarm generates inform on duty SM & to find out the reason of alarm
  • Ensure cleaning in all equipment rooms Training on the HVAC & CPM system - How to operate in Manual & Auto.

Facility Executive and Project Execution and Commissioning

ISS Facility Services India Ltd (Site: Reliance Corporate Park)
12.2019 - 06.2022
  • Carry out all Pump equipment, HVAC equipment, Biogas & STP break down as well as preventive maintenance activity after approval
  • Maintaining the system healthy & smooth in running
  • Handling and commissioning projects
  • Follow up with vendor for quotations and other activities Co-ordinate with vendors to attend the open complaints & PM according to MOP
  • Follow up with commercial team for PO process and release of the PO at different levels
  • Rectify and arrest the leakages through the pipelines
  • Work on System: Maintaining reports of waste management, Water consumption reports, Material entry in SAP, SAP MM and PM operations, OGP creation, Material movement in system Niagara Worked as BMS executive handled BMS operations during covid period
  • Ensure work permits (General, Height, Hot, Confined Space etc)
  • Rectify the issue
  • Resolving the issue with In house team
  • Maintaining the system healthy & smooth in running
  • Maintaining the excel sheets (Daily Reports, PM Reports, Complaint Reports)
  • Generating the reports from system on daily basis To ensure safety at work site and maintain Accident free site Monitoring the BMS system - Act to the system alarms and if any criticality report to the senior authority.
  • To implant the changes in system with co-ordination of project team & vendor with Management approval according to MOP To create MOP for Carried out Activity To create SOP & EOP for Equipment.

HVAC Supervisor and Working on SAP MM and PM Module

Powermech Services (Site: Relaince Corporate Park)
09.2019 - 11.2019
  • Provided guidance and direction to subordinates regarding job duties and responsibilities
  • Reviewed reports from subordinate staff members before submitting them to senior management
  • Working on SAP PM Modules
  • Closing the PM orders etc
  • Working on SAP MM Modules
  • Create Material requisition, raise PR (Purchase requisition)
  • Contacting to vendors.

AMC Sales Engineer

ESKAY Elevators
04.2019 - 09.2019
  • Looking after sales and services of the elevators
  • Scheduling AMC of the Elevators
  • Maintain good relation with customers.

Service Engg

Integra Technomate (TUNG YU)
01.2017 - 07.2018
  • Leading the installation and commissioning of Compression Moulding machines
  • Handling the service as well as maintenance of the machine required periodically
  • Arranging the spares required for the machines Generating revenue for the company on the services and spares Arranging AMCs and sales of the machines Rectifying the faults in the machines like Mechanical, Electrical as well Electronics

Engineer, Utility Maintenance, Supervisor

Cipla Pharmaceuticals(Contract)
04.2012 - 12.2016
  • Main contributor in maintaining the utility department Perform Preventive Maintenance and breakdown maintenance Maintain reports of HVAC unit Periodically change of refrigerant in the chillers to maintain prerequisite temperature continuously Look after the water treatment plant in the Unit Cleaning and maintain flow in the air conditioning system Maintain pneumatic systems so that automation system will work effectively Maintaining records of each utility system Maintained AHU, cleaning and other treatment required Carried out maintenance of Ducts and other water treatment plants Water treatment plants Handled Pneumatic systems and vacuum systems

QC Inspector

Time Mauser Pvt Ltd
Pen
03.2011 - 03.2012
  • Inspect the incoming material, outgoing material and Assembly Line Carry out Testing process according to SOP of the material being produced before manufacturing of that batch Maintain test reports and QC dispatch and incoming material reports Attended Customer in case of any complaint Carried out process to find main reason behind rejection of products Followed the standard ISO9001 and maintained reports.

Education

BACHELORS' IN MECHANICAL ENGINEERING, First -

M.G.M COLLEGE OF ENGINEERING
01.2018

DIPLOMA IN MECHANICAL ENGINEERING, First -

GOVERNMENT POLYTECHNIC PEN
01.2010

Skills

  • Autocad
  • Solidworks 2015
  • PLC
  • Ms Excel
  • Ms Word
  • Ms Powerpoint
  • Operations Management
  • Orientating and Training
  • Project Management Abilities
  • SAP MM module

Accomplishments

2 times Apple Award winner.

Personal Information

  • Passport Number: N5563141
  • Father's Name: Kumar M. Rasote
  • Date of Birth: 06/10/89
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Single

Other Curriculum Activities

  • Runner-up and Carrom zonal competition during diploma in mechanical.
  • Captain of Badminton team and lead player of the team during Diploma, with 2 consecutive runner-ups.
  • Runner-up in Table tennis and team leader of team.
  • Due participation in every team event and each cultural and sports activity.

Languages

  • Read, Write & Speak

Projects

ELECTROPOLISHING OF SS304 AND SS420 - BE Mechanical Engineering, This project was done to compare the physical as well chemical properties by using electro polishing to make the fine and precise polishing which cannot be attained by mechanical polishing. This project aimed to study the characteristics of SS420 compared with SS304. STASTICAL QUALITY CONTROL - Diploma in Mechanical Engineering, The project is done to find out under issue by implementing SQC in the process. In this we performed a case study as there were too many rejections in their products. By using statistical Quality tools like Six Sigma, and detailed study of production process and equipments we completed case study. Results obtained after implementation of SQC were good enough as their rejections were lowered.

Training

Diploma final year project in STATICAL QUALITY AND CONTROL in Veltech Forging Pvt Ltd Murbad Kalyan. Implant training in Vikram Sponge Iron Ltd. Participation in Petroleum Conservation Research Association.(Govt of India). Training on Safety (First Aid Industrial Training & Health) at Welspun Maxsteel.

Timeline

Assistant Manager

CtrlS Datacentre Pvt Ltd
07.2023 - Current

CPM Operations and BMS

Data Centre Sustainable skills Capital Pvt Ltd (JCI)
06.2022 - 07.2023

Facility Executive and Project Execution and Commissioning

ISS Facility Services India Ltd (Site: Reliance Corporate Park)
12.2019 - 06.2022

HVAC Supervisor and Working on SAP MM and PM Module

Powermech Services (Site: Relaince Corporate Park)
09.2019 - 11.2019

AMC Sales Engineer

ESKAY Elevators
04.2019 - 09.2019

Service Engg

Integra Technomate (TUNG YU)
01.2017 - 07.2018

Engineer, Utility Maintenance, Supervisor

Cipla Pharmaceuticals(Contract)
04.2012 - 12.2016

QC Inspector

Time Mauser Pvt Ltd
03.2011 - 03.2012

BACHELORS' IN MECHANICAL ENGINEERING, First -

M.G.M COLLEGE OF ENGINEERING

DIPLOMA IN MECHANICAL ENGINEERING, First -

GOVERNMENT POLYTECHNIC PEN
Mangesh Rasote