Dynamic Senior Survey Engineer with extensive experience at Kec International Ltd, specializing in airport project surveys and earthwork calculations. Proven ability to lead teams and ensure compliance with ICAO standards while delivering precise as-built documentation. Proficient in AutoCAD Civil 3D, demonstrating strong project coordination and problem-solving skills.

Overview

15
15
years of professional experience
2011
2011
years of post-secondary education
1
1
Certification

Work History

Senior Survey Engineer

Kec International Ltd
bhubaneswar
03.2021 - Current

Tuticorin Airport Project & Bhubaneswar MLA Quarters Project

  • Executed setting out and layout surveys for Terminal Building, ATC Tower, and landside facilities.
  • Conducted control point establishment and verification for apron, service roads, and landside utilities.
  • Monitored elevation and alignment works for pavement layers, approach roads, and apron structures.
  • Carried out survey checks for pile, foundation, and structural works in terminal and ATC zones.
  • Ensured accurate leveling and grading surveys for stormwater drainage, utility corridors, and landscaping.
  • Prepared and maintained as-built drawings and survey documentation for terminal, ATC, apron, and roads.
  • Coordinated with design and execution teams for survey-related approvals and work progress.
  • Supervised survey team, equipment calibration, and ensured compliance with project quality standards.

Senior Surveyor

Megawide Construction DMCC
North Goa
07.2018 - 02.2021

Senior Surveyor – GMR Goa International Airport Project

Key Responsibilities & Activities:

  • Established and maintained primary & secondary survey control networks for both airside and landside works.
  • Executed setting out, alignment, and verification surveys for runway, taxiway, apron, terminal, ATC tower, and service roads.
  • Conducted earthwork volume calculations for cut-fill operations, grading, and pavement layers using Civil 3D.
  • Utilized AutoCAD Civil 3D for preparing survey drawings, surface models, cross-sections, and as-built documentation.
  • Supervised pile, foundation, and structural layout works for terminal and ATC tower zones.
  • Performed as-built and topographic surveys for apron, utilities, drainage, and road networks.
  • Coordinated with design & execution teams to resolve survey discrepancies and site constraints.
  • Led a team of surveyors, ensuring equipment calibration, data accuracy, and adherence to ICAO/AAI standards.

Survey- Officer

Hindustan Construction company
Boisar
12.2015 - 12.2016

Surveyor – BARC Tarapur Nuclear Project

Key Responsibilities & Activities:

  • Established survey control points and benchmarks for structural, utility, and infrastructure works.
  • Executed setting out and layout surveys for reactor buildings, auxiliary structures, and plant facilities.
  • Conducted precise leveling, alignment, and elevation checks for heavy foundations and critical structures.
  • Carried out as-built and topographic surveys for underground utilities, roads, and drainage systems.
  • Supervised pile and foundation surveys, ensuring compliance with nuclear project tolerances.
  • Prepared and updated survey drawings, cross-sections, and documentation for quality assurance.
  • Coordinated with engineers and construction teams to resolve survey-related discrepancies.
  • Ensured equipment calibration, data accuracy, and safety protocols in high-security work zones.

Surveyor

Gannon Dunkerley co. Ltd
Raigad- Pen
12.2011 - 12.2015

Surveyor – JSW Ispat Steel Plant Project

Key Responsibilities & Activities:

  • Conducted survey control establishment and verification across coke oven, bar mill, billet caster, and utility areas.
  • Executed setting out and alignment surveys for structural foundations, equipment foundations, and industrial buildings.
  • Supervised DMC pile and MAT pile layout works, ensuring accuracy in positioning and depth verification.
  • Performed leveling and alignment checks for heavy foundations, columns, and mill structures.
  • Carried out as-built surveys for coke oven, billet caster, and bar mill facilities.
  • Prepared survey drawings, cross-sections, and quantity reports using AutoCAD / Civil 3D.
  • Coordinated with structural and civil engineers for foundation tolerances and survey approvals.
  • Ensured equipment calibration, safety compliance, and documentation for QA/QC records.

Assistant Surveyor

Gammon India Ltd.
Gondia- Tiroda
08.2010 - 12.2011

Assistant Surveyor – Adani Power Plant Project

Key Responsibilities & Activities:

  • Assisted in survey control point establishment and leveling across plant areas.
  • Supported in setting out and alignment surveys for turbine foundations, boiler units, and auxiliary structures.
  • Conducted leveling works for roads, drains, and utilities within the power plant site.
  • Prepared as-built survey data and daily survey records under senior surveyor guidance.

Education

Civil Engineering Diploma - English

Swami Vivekananda University
Sagar
08.2016 - 06.2018

ITI - Surveyor- ITI (NCVT)

East India Technical Institution
West Bengal
07.2008 - 08.2008

Barodangal RN Institution
Hooghly

Skills

  • Surveying & Site Control: Topographic surveys, GPS/GNSS, Total Station, Digital Level, Control point establishment, Traverse adjustment
  • Airport Project Surveys: Runway/taxiway/apron setting out, terminal & ATC layout, airside & landside utilities, ICAO/AAI compliance
  • Earthwork & Volume Calculation: Cut-fill analysis, grading works, earthwork quantity calculation using AutoCAD Civil 3D
  • Industrial & Plant Surveying: Coke oven, bar mill, billet caster, DMC & MAT piles, turbine & boiler foundations, structural alignment
  • As-Built & QA/QC Documentation: Preparation of survey reports, CAD drawings, cross-sections, and final as-built documentation
  • Project Coordination: Resolving survey discrepancies, site constraints, and providing survey support to design/execution teams
  • Team & Equipment Management: Supervising survey teams, instrument calibration, safety compliance, and training junior staff
  • Software Proficiency: AutoCAD, Civil 3D, MS Office, Survey data processing tools

Languages

Bengali
First Language
English
Upper Intermediate (B2)
B2
Hindi
Upper Intermediate (B2)
B2
odia
Beginner (A1)
A1

Certification

Civil 3D Cad

AutoCad

Advance Office Tools

Timeline

Senior Survey Engineer

Kec International Ltd
03.2021 - Current

Senior Surveyor

Megawide Construction DMCC
07.2018 - 02.2021

Civil Engineering Diploma - English

Swami Vivekananda University
08.2016 - 06.2018

Survey- Officer

Hindustan Construction company
12.2015 - 12.2016

Surveyor

Gannon Dunkerley co. Ltd
12.2011 - 12.2015

Assistant Surveyor

Gammon India Ltd.
08.2010 - 12.2011

ITI - Surveyor- ITI (NCVT)

East India Technical Institution
07.2008 - 08.2008

Barodangal RN Institution
Manishankar Dolui