Summary
Overview
Work History
Education
Skills
Professional Preface
Passport Id
Current Location
Personal Information
Hobbies and Interests
Disclaimer
Timeline
Generic

Manish Sharma

Surat

Summary

Mechanical Engineer with B.E. in Mechanical Engineering and 13+ years of experience in the field of Fabrication, Erection, Pre-Commissioning, Commissioning in Power Plant, Petrochemical, Oil & Gas industry as a Construction Engineer. Currently looking for a suitable and challenging Piping Engineer position with EPC or Consultant Company in Oil & Gas Industry.

Overview

14
14
years of professional experience

Work History

Mechanical Engineer

Reliance Industries Limited
12.2021 - Current
  • Debottlenecking related equipment installation and piping jobs
  • Piping MOC jobs
  • Ensure the smooth functioning of all stationary and rotary equipment
  • Replacement of pumps and compressors
  • Valve and line replacement in Mega Shut Down
  • Compliance to engineering standards while accomplishing the task
  • Strict adherence to safe engineering practices and safe work procedures for hot work, confined space, work at height, Lock Out Tag Out procedures etc
  • Failure analysis and developing alternate solutions
  • Risk assessment and its counter measures

Mechanical Engineer

Reliance Industries Limited
01.2021 - 09.2021
  • Safe execution of capital works at LPG Bottling Plant of various contractors
  • Preparation of RA as per specific tasks in consultation with construction team
  • Coordinating with Engineering Team and Construction Team to meet the planning schedule as well as billing schedule regarding Bulk MTO release, Isometric and Line List release
  • Coordinating for Front availability, Material Availability, Monthly plan, Engineering queries
  • Coordinating with vendors regarding deliveries and prioritizing of fittings, pipes & structure to meet the fabrication schedule
  • Participating in Contractor Progress Meeting, Constructability Reviews, Weekly Work Plan, Daily Manpower monitoring, Contractor’s Day to day activities
  • To review the Test package for Mechanical Clearance & assisting for implementation/ resolution for Site Engineering request (SER), Field Change Notice (FCN)/ As Built in Test Packages
  • Verifying final box up of pipelines
  • Flushing, cardboard blasting, drying/purging of pipelines and line handover to operation.

Construction Engineer Piping & Mechanical

Bechtel India Private Limited
08.2018 - 11.2019
  • Coordinating with Bechtel field execution team
  • Reviewing 3D model of Pennsylvania Chemicals using SPR (Smart Plant Review) and identifying technical issues with piping scope for an assigned Installation Work Package (IWP)
  • Prepare detailed Installation Work Package (IWPs) as per the project guidelines and procedures on Smart Plant Construction (SPC) tools, which includes, extracting installation drawings, installation details, vendor drawings or any other documents or Engineering deliverables associated with the IWP scope
  • Scoping and assembly of piping test packages of ECU, OSBL & PE facilities
  • Verifying the test limits, test type & test pressure as per scoping plan
  • Reviewing 3D model (SPR) for test packages preparation
  • Verifying ISO drawing & P&ID as per test limit
  • Preparing material take off list for testing purpose
  • Input all data in different table of TEAM Works as per test package requirements
  • Validating test packages to check correctness and completeness.

Mechanical Engineer

Reliance Industries Limited
03.2018 - 08.2018
  • Preparing Project Execution Plan, JSA, Risk Assessment of jobs
  • Prepared execution plan and schedule on MS-Project shared to Project Manager
  • Dismantling of existing utility and process lines and valves
  • Erection of new lines, pre- commissioning, testing and commissioning
  • Check the project for mechanical completion as per P&ID & Isometric
  • Preparation of ITP and follow up at site
  • Reporting progress, issues related to site to Project Manager
  • Preparation of Punch lists, follow up, close out
  • Witness & accept hydro test, pressure tests of packages as per standards
  • Preparation of PTW, while adhering to HSE policies (Permit Receiver)
  • Plan and mobilize manpower, required tools & materials.

Construction Engineer (Piping)

Reliance Refinery Jamnagar, Gujrat
03.2014 - 12.2017
  • Responsible for fabrication and erection of Spools of CS, SS, Alloy, GRP, PP, HDPE, PVC, CPVC for SWRO (400,000 m3/day) plant at MTF site
  • Plan, mobilize manpower, required tools & materials
  • Hydrotesting 500 high pressure loops safely
  • Pre–commissioning of various sizes of pipeline as like flushing/blowing, hydro-testing, steam blowing, chemical cleaning, neutralization & dry out the system, leak test
  • Check the project for mechanical completion as per ISO & P&ID
  • Preparation of Punch lists, follow up, close out
  • Coordinating with different construction groups & contractors
  • Witness & accept hydro test, pressure tests of packages as per standards
  • Identify systems, sub-systems & mark-up
  • Completion of Inspection Test Reports (ITR-A, B and C) related to Test Packs
  • Participate in system Walk down with Construction, Commissioning and operation for punch listing & final conformation check list
  • Preparation of PTW, while adhering to HSE policies (Permit Receiver)
  • Liquidation of PSSR punch points.

Junior Engineer

Dowel Erectors Pvt. Ltd.
03.2011 - 03.2014
  • Responsible for fabrication & erection of structure, piping of different metallurgy such as carbon steel, Alloy Steel, CS, SS etc
  • Coordination with different on-site agencies such as fab shop, stores, quality department, contractors and clients
  • Review of P&ID & Vendor documents, drawings
  • Organizing review meetings, preparing MOM and Action Plan follow up for action taken
  • Planning of mobilization of manpower, required tools & materials
  • Mechanical Completion walk-down
  • Involved in Pre- Commissioning and Commissioning activities of Boiler, Critical Piping, LP Piping such as Hydraulic Test and Wet Preservation, Air and Gas Tightness Test, Preparations for First Light Up, Alkali Boil – Out, Acid Cleaning, Steam Blowing.

Junior Engineer

Power Group Construction
09.2010 - 03.2011
  • Responsible for all piping, ducting, structure fabrication and erection
  • Erection of equipment’s and alignment
  • Mechanical Clearance
  • Hydro test and Box UP
  • Final Documentation
  • Plan and mobilize manpower, required tools & materials.

Site Engineer

Jai Durga Construction
03.2010 - 09.2010
  • Responsible for all structure fabrication and erection
  • Final Documentation
  • Plan and mobilize manpower, required tools & materials.

Education

Bachelor of Engineering in Mechanical -

Bhabha Engineering Research Institute

Skills

  • Ability to work in a fast-paced environment and handle multiple tasks
  • Vast experience working as a Piping Field Engineer
  • Leadership skills with experience in managing crews
  • Familiar with various types of piping materials like CS, SS, Alloy Steel, Super Duplex
  • Piping Fabrication and Erection and Pre-commissioning: - Metallic and Non-Metallic Process and Utility piping Fabrication and erection with compliance of ASME Standards and Completion Hydro test, Flushing, Steam Blowing and reinstatement job of dismantled inline items

Professional Preface

Familiar with Smart plant Review & Smart Plant Construction projects and Navisworks Freedom. Well versed with international codes & standard like ASME 31.3, & 31.1. A dynamic professional with 11+ years of experience in plant construction (Piping/Equipment/structure fabrication, erection and alignment) Test Package and IWP (Installation work package preparation), Mechanical clearance, Hydro test, and Pre-commissioning Activities. Conversant with –Smart Plant Construction & Review, Team & Info Works, Navisworks, SAP-PM, SAP-MM. Skilled in managing teams to work in sync with the corporate set parameters & motivating them for achieving business and individual goals.

Passport Id

Z3913182

Current Location

Surat, Gujarat

Personal Information

  • Date of Birth: 08/17/1988
  • Marital Status: Married

Hobbies and Interests

  • Playing Cricket
  • Reading

Disclaimer

I hereby declare that all the above information is true & correct to the best of my knowledge & belief.

Timeline

Mechanical Engineer

Reliance Industries Limited
12.2021 - Current

Mechanical Engineer

Reliance Industries Limited
01.2021 - 09.2021

Construction Engineer Piping & Mechanical

Bechtel India Private Limited
08.2018 - 11.2019

Mechanical Engineer

Reliance Industries Limited
03.2018 - 08.2018

Construction Engineer (Piping)

Reliance Refinery Jamnagar, Gujrat
03.2014 - 12.2017

Junior Engineer

Dowel Erectors Pvt. Ltd.
03.2011 - 03.2014

Junior Engineer

Power Group Construction
09.2010 - 03.2011

Site Engineer

Jai Durga Construction
03.2010 - 09.2010

Bachelor of Engineering in Mechanical -

Bhabha Engineering Research Institute

Manish Sharma