Passionate about tackling challenging and interesting projects at the forefront of technology, continuously learning, innovating, and enhancing skills in alignment with company goals. Seeking a career that provides ample opportunities for professional growth and development, excited to contribute expertise towards driving success and achieving objectives.
Overview
17
17
years of professional experience
2
2
Languages
Work History
Assistant Manager (Electrical Department)
M/S STS Infracon Pvt Ltd.
04.2025 - Current
Company Overview: Project: Construction and Erection of 400 KV Sub-station Kallam of in State of Maharashtra, India. Client: Indigrid Limited. Consultant: Indigrid Limited – PMC.
Documentation for necessary approval (Like CEA approval, Commissioning Protocols; Consent from NRLDC).
Erection, Testing & commissioning of 400kV Switchyard.
Commissioning of Siemens PLC (S7-400) and WinCC SCADA.
Presently Handling the Operation activities of the plant.
Project: Construction and Erection of 400 KV Sub-station Kallam of in State of Maharashtra, India. Client: Indigrid Limited. Consultant: Indigrid Limited – PMC.
Improved customer satisfaction by addressing and resolving complaints promptly.
Maintained a clean, safe, and organized store environment to enhance the customer experience.
Developed strong working relationships with staff, fostering a positive work environment.
Senior Engineer (Electrical Department)
M/S Megha Engineering & Infrastructures Ltd.
03.2022 - 04.2025
Company Overview: Project: Construction of underground tunneling Rail project works from Chainage 83+903 to 101+339 (FLS) under Package-7 in Connection with New BG line between Rishikesh and Karanprayag (125km) in State of Uttarakhand, India. Client – Rail Vikas Nigam Limited. Consultant: AECOM India Private Limited – PMC.
Scheduled & planned the predictive, preventive and breakdown maintenance jobs with key focus on spares availability and root cause analysis.
Facilitated the underground drill work through Jambos, Boommer, Grout Pumps, Shot Crete Machine’s.
Installations of MEP works at station, like Firefighting & Plumbing works for Drainage systems, Embedded & Exposed DI & CI Pipes, also GI pipe for water supply services etc.
Execution of all MEP works like installation of Brackets for Electrical & FF services at Tunnel, Tunnel crossover section & cross passage.
Handling for all tunnel and station MEP work.
Handling for all E&M work.
Installation of Earth Mat Work.
Installation of Plumbing System, Firefighting, HVAC, Ducting system & Installation of Electrical Work.
Installation permanent work for tunneling inside and metro station.
Handling electromechanical work.
Handling client and sub-contractor work.
Maintain All Document Works Like RFI, Material Approval & Vendor Approval.
Calculated Quantity of all MEP Work with the help of Approved drawing.
Project: Construction of underground tunneling Rail project works from Chainage 83+903 to 101+339 (FLS) under Package-7 in Connection with New BG line between Rishikesh and Karanprayag (125km) in State of Uttarakhand, India. Client – Rail Vikas Nigam Limited. Consultant: AECOM India Private Limited – PMC.
Electrical Engineer (P&M)
M/s Larsen and Toubro Ltd. (Under M/s Apex Infralink Limited)
09.2020 - 01.2022
Company Overview: Project: Construction of underground tunneling Rail project works from Chainage 18+444 to 33+097 (FLS) under Package-2 in Connection with New BG line between Rishikesh and Karanprayag (125km) in State of Uttarakhand, India. Client – Rail Vikas Nigam Limited. Consultant: Yuksel – ITC India Private Limited – PMC.
Execution of Electrical works with proper planning and coordinating with allocated time, budget, quality and safety objectives.
Responsible for Execution & Supervise of LT Electrical Works.
Engaged in laying of LT cables up to 400Sqmm as per cable approved cable schedule.
Erection of LV Switchgears like Main Distribution Panels (630A, 400A).
400A Bus bar Panels.
Erection of Cable Trays ladder and Perforated Type.
DG Sets up to make Cummins.
Drill Jumbo Machines like Boomer (L2D, Tamrock (DT820).
Short Crete Machine like Cifa, Schwing Stetter.
Air Compressors make Atlas Copco.
Electrical Concrete Pumps make Schwing Stetter.
Dewatering Pumps & LT Motors.
Maintaining electrical equipment.
Transformer of 1250KVA make volt Amp.
Knowledge of analog filters, soldering and resistance welding techniques.
Dg sets up to 250 KVA make caterpillar and Cummins.
Responsible for execution and supervise of LT electrical works.
Knowledge of Direct online starters and star delta starters.
Project: Construction of underground tunneling Rail project works from Chainage 18+444 to 33+097 (FLS) under Package-2 in Connection with New BG line between Rishikesh and Karanprayag (125km) in State of Uttarakhand, India. Client – Rail Vikas Nigam Limited. Consultant: Yuksel – ITC India Private Limited – PMC.
ISD Engineer
M/s Larsen and Toubro ltd. (Under KMS project and service LLP – SBHEP)
01.2015 - 07.2020
Company Overview: Scope of work: Design & Construction of Hydro Power Project 3
33 KW Barrage, HRT, Surge Shaft and Power House. Cost of the Project: 1250 Cr. (INR). Client/Consultant – Larsen and Toubro Limited (Power).
Supervising & diagnosing day-to-day problems at the site regarding the electric machines and arranging the maintenance team with valuable guidance & technical support.
Responsible for installing, Maintaining and repairing for the electrical wiring and office equipment (UPS etc.).
Responsible for site hardware requirements & installation of operating system.
Provide support to staff, regarding the EIP help desk issues.
Implementation of Workmen management systems, Installation of Biometric Attendance machine and CCTV.
Operate computer-assisted engineering and design software and equipment to perform engineering tasks.
Ensuring all work done is in compliance with health & safety regulations.
Provided advice to customers and site management with in writing and verbally, regarding dangerous equipment and prioritization of work.
Site Consultant
M/s NexGen Consultancy Pvt Ltd.
11.2008 - 04.2010
Company Overview: Scope of work: Cost of the Project: 1250 Cr. (INR). Client/Consultant – Himachal Pradesh State Electricity Board Ltd.
Provide the Domain knowledge of SEB's to software development team so that they can develop & deliver an eminence product as per client requirement.
Complete Computerization of HPSEB, JVVNL offices down to Sub Division level.
Software includes: Billing, CRM applications, Electricity Network Management system(ENMS), Interactive Voice Response system(IVRS), Spot Billing, Website Development and Management, MIS etc.
Evaluated client needs and expectations, establishing clear goals for each consulting engagement.
Developed innovative strategies for clients, resulting in increased revenue and business growth.
Assisted clients in navigating complex industry challenges with strategic recommendations.
Liaised with customers, management, and sales team to better understand customer needs and recommend appropriate solutions.
Identified areas of improvement for clients'' operations, implementing targeted solutions to increase productivity.
Education
MBA - Power Management
University of Petroleum And Energy Studies
Dehradun
12.2023
B-Tech - Electrical And Electronics Engineering
Kurukshetra University
Shivalik Institute Of Engineering And Technology
06.2013
Diploma - Computer Engineering
Dr B R Ambedkar Government Polytechnic
Ambota Una
12.2009
12th Pass -
Monal Public School
Shimla
06.2005
Skills
Problem-solving
Task delegation
Employee scheduling
Personal Information
Date of Birth: 10/21/85
Gender: Male
Nationality: Indian
Marital Status: Unmarried
Disclaimer
I Declare that the above given information is true at the best of my knowledge.
Mobile Numbers
+917018987542
+919805092177
Timeline
Assistant Manager (Electrical Department)
M/S STS Infracon Pvt Ltd.
04.2025 - Current
Senior Engineer (Electrical Department)
M/S Megha Engineering & Infrastructures Ltd.
03.2022 - 04.2025
Electrical Engineer (P&M)
M/s Larsen and Toubro Ltd. (Under M/s Apex Infralink Limited)
09.2020 - 01.2022
ISD Engineer
M/s Larsen and Toubro ltd. (Under KMS project and service LLP – SBHEP)
Senior Engineer (Mechanical) at M/s Dineshchandra R Agrawal Infracon Pvt. Ltd.Senior Engineer (Mechanical) at M/s Dineshchandra R Agrawal Infracon Pvt. Ltd.