Plexos
Dedicated professional with history of meeting company goals utilizing consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.
Reference to assignments that best illustrated Capability to handle the assigned tasks.
1. Name of assignment or project: Supportive Measures Needed for Large Scale RE Integration in India.
Client : IWPA
Main Project Feature : Curtailment of wind energy in Tamil Nadu.
Activities performed:
- Analysis of Key drivers of curtailment of wind energy in Tamil Nadu.
- Ranking the key drivers.
- Existing policy and regulation review.
- Recommendation.
2. Name of assignment or project :Technical due diligence of solar portfolio.
Activities performed: Site visit report.
3. Name of assignment or project: Pre-feasibility study of an offshore wind farm in Gujarat and Tamil Nadu.
Client : RIL and BP
Main Project Feature : Feasibility Study.
Activities performed: Hybrid combination and optimization.
- Developed model on PLEXOS,a portfolio optimization tool, for the various possible scenario for hybrid combination,cost optimization and possible LCOE reductions.
- Review of electricity market mechanism in India.
4. Name of assignment or project: Technical due diligence for a wind and solar energy portfolio in India.
Activities performed: Grid Evacuation study.
6. Name of assignment or project: Energy Production Assessment
Main project features: Energy production assessment for wind farm in Northern region of India.
Activities performed:
- Analyzing and processing SCADA data.
- Operational analysis of wind turbine.
- Reporting P50, P75 and P90 value.
7. Name of assignment or project: Dimensioning of Control Reserves in the Southern Region Grid States.
Client: GIZ and Southern Regional Power Committee(SRPC)
Main project features: This study aims at quantification of the secondary and tertiary control reserve requirements for balancing in the southern region (Andhra Pradesh, Karnataka, Kerala, Telangana and Tamil Nadu) with the consideration of RE capacity addition of southern region states by 2022.
Activities performed: Study was carried out to provide specific sets of recommendations to SPRC (implementation agency) for control reserve requirement identification by 2022 in the southern states of India highlighting the following indicators:
-Identification of types of reserves required at southern states of India and at regional level
-Detail out a methodology for reserve dimensioning
-Dimensioning of State wise regional control reserve requirements by 2022 in southern region
- Quantitative showcasing the benefits of reserve sharing within the existing policy dimensions in India.
8. Name of assignment or project: GPM Customer Support
Main Project Feature : Support Engineer.
Activities performed:
- GPM scada and plus system configuration.
9. Name of assignment or project: Smart Cable Guard
Main Project Feature : Support Engineer.
Activities performed:
• Front line Customer support.
• Monitoring of active systems.
• Installation & commissioning support.
• One week checks.
• Obtain and process performance tracker data.
• Provide weekly and monthly operational reports.
- Monitoring of wind asset.
- Analyzing and processing SCADA data.
- Daily and weekly reporting to customer.
- SCADA system training.
Name of assignment or project: Review of Indian policy framework and policy proposal related to transport sector.
Client: Toyota Kirloskar Motor Pvt.Ltd, Japan.
Main project features: Review of policy framework of transport sector in India.
Activities performed: Activity performed include:
· Review of policy framework of transport sector in India.
· Forecast of vehicle demand of year 2050.
· Fuel consumption and emission estimates.
Major Project
Name of assignment or project: Implication of large scale wind and solar generation on optimal energy mix : A case study for Rajasthan. Main project features: PLEXOS UC&ED model to obtain energy generation mix for the state, taking into account the demand of the system in year 2022.
Activities performed:
· Load forecast of the region in year 2022.
· Developed UCED model on PLEXOS of the Region( Rajasthan, a state in India).
Minor Project
Name of assignment or project : Addressing land issues for utility scale Renewable Energy Deployment in India.
Client : Shakti Sustainable Energy Foundation
Main project features: A study to understand major issues in the context of land required for setting up renewable energy projects, focusing on solar photovoltaic and wind energy sectors, identifying best practices with regard to policy and regulations as well as field practices.
Activities performed:
· Development of model guidelines for land procurement/use for setting up renewable energy project.
· Review of best practices with respect to land procurement followed in RE project.
· Innovative business models to minimize the socio-economic impact of RE development.
System simulation on PLEXOS
undefinedPlexos
MS Excel
SCADA
Power BI
Plexos core certification
Mastering Energy and Power System Optimization
The Sexual Harassment of women at workplace(prevention, prohibition and Redressal) Act 2013
Power system reliability concept.
The Data Science Course 2020: Complete Data Science Bootcamp
Plexos core certification