Summary

An organized, dependable, and proactive professional with a proven track record of successfully managing multiple priorities and achieving team goals through consistent, disciplined, and organized practices. With over 17 years of extensive experience in project operations, maintenance, and supervision across electrical, mechanical, and production domains, consistently meeting and exceeding company objectives.

Expertise in effective troubleshooting and problem-solving, combined with a deep understanding of both the FMCG and Power Industries, contributes significantly to organizational success. Adept at utilizing teamwork to drive efficiency and innovation, employing advanced techniques and tools to resolve issues quickly and effectively, saving time and resources.

A key asset is the ability to perform under pressure and adapt seamlessly to new challenges, enhancing the organizational brand in competitive markets. Recognized consistently throughout a career for exceptional performance and significant contributions to the growth and success of the FMCG and Power sectors. A unique blend of skills, attention to detail, and exceptional organizational capabilities ensures that expectations are not only met but consistently exceeded, driving positive impact and success in every endeavor.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Senior Project Engineer

FAMSUN INDIA (Muyang Holdings)
06.2024 - Current

Current project UGRAYA Group 10TPH Poultry,5TPH Fish Feed Project Guwahati Assam.

  • Erection, installation, Commissioning, SLD or Control Diagram, PID, layout, checking or verifying and reviewing construction drawings, Coordinated presentation project members to detail project scope, progress, and results Worked within applicable standards, policies, and regulatory guidelines to promote a safe working environment
  • Identified potential risks early in the process, allowing proactive mitigation measures to prevent delays or setbacks.
  • Reduced project completion times for increased client satisfaction by consistently meeting deadlines and delivering high-quality results.
  • Navigated challenging situations through creative problem-solving abilities which often resulted in expedited resolutions.
  • Oversaw worksite construction to coordinate with supervisors and guide projects.

Maintenance Manager

CP FEEDS LTD
05.2022 - Current
  • Working with BUHLER feed mills, capacity 25 ton/hrs.
  • Breakdown,Preventive (TBM,CBM) corrective maintenance has been carry out & followed up machine production capacity to insure smooth production
  • Created & Planned scheduled maintenance (Daily,weekly,monthly) formate and implement as part of preventive maintenance program.
  • Always keep tracking machines for maximum performance
  • Supervised employee performance, preventive maintenance and safety.
  • Created work schedules and set up training for 30 employees working on Feed mill .
  • Contributed to development, implementation and execution of maintenance programs.
  • Managed efficient teams of up to 10 employees.
  • Set aggressive targets for employees to drive company success and strengthen motivation.
  • Assessed manufacturing processes and recommended improvements to increase productivity.
  • Sourced materials to keep up with production goals and meet customer demands.
  • Studied department operations to assist with development of new or improved methods of tooling and production processes.
  • Monitored team budgets to keep projects on task and avoid waste.
  • Created streamlined production schedules and collaborated with production employees to communicate objectives and goals.
  • Estimated labor requirements to support anticipated workload.
  • Standardized production procedures, job roles and quality assurance guidelines.
  • Implementation 5S in Feed Mill
  • Planned scheduled maintenance outages as part of preventive maintenance program.

Senior Electrical Executive Project

SUGUNA FOODS PVT LTD
04.2021 - 05.2022
  • Supervised project, EC shed, Battery cage, and all Electrical work start through delivery by prioritizing needs and delegating assignments
  • Coordinated presentation project members to detail project scope, progress, and results
  • Tracked all hours and expenses to keep project on task and within budgetary parameters
  • Formulated complete project plans and coordinated engineering, design, and shop drawing efforts
  • Developed executive presentations and reports to facilitate project evaluation and process improvement
  • Liaised between departments to facilitate communication and keep appropriate parties updated on project developments
  • Provided technical direction on Breeder projects and initiatives to other engineers, documentation
  • Checked compliance with company safety plan and delivered recommendations to address regulatory issues
  • Performed on-site field surveys and wrote technical narratives to document processes and resources.
  • ACHIEVEMENT:-
  • Manage Project & Feed Mill Responsibilities.
  • Worked within applicable standards, policies, and regulatory guidelines to promote a safe working environment.

Senior Executive Electrical Feed Mill

Suguna Foods Pvt Ltd
04.2018 - 03.2021
  • RESPONSIBILITIES:-
  • 10-ton-per-hour capacity feed mill working in there and operating control room PLC & MCC system in feed mill fully auto and manual operating system
  • Working with companies SOP JOB Responsible with m feed mill and other experience
  • Executing work safely in live areas with necessary precautions
  • Responsible for preventive,
  • Corrective / Breakdown, mechanical, and electrical maintenance activities at any time
  • Participated in team-building activities to enhance working relationships
  • Identified issues, analyzed information, and provided solutions to problems
  • Maintained energy and enthusiasm in a fast-paced environment
  • Used coordination and planning skills to achieve results according to schedule
  • Worked to maintain outstanding attendance record, consistently arriving to work ready to start immediately
  • Completed paperwork, recognizing discrepancies and promptly addressing them for resolution
  • Eliminated downtime and maximized revenue by providing top-quality control
  • Improved operations through consistent hard work and dedication
  • Quarterly indent need basis for maintenance electrical, mechanical spares accessories in under budget
  • Manage production supervisor, shift in charge, operators to maintenance & operation work monthly
  • Maintain Daily Log Book for Spare stock, Maintenance, Electrical & Mechanical Fault
  • Responsible for monthly Maintenance ERP Entry with Spare
  • Responsible for monthly HSE Report & Permit for the hotline, Height work
  • Ensure Tools & spares to troubleshoot to save time
  • ACHIEVEMENT:
  • Achieved Best Performance Award in 6 months after joining
  • Achieved target every time after Regional Head commitment
  • Interlocking material bin high-level sensor with intake conveyor
  • Interlocking pellet bin with PDL conveyor
  • Repair ASAP system
  • Install new APFC Panel 100 kvar as per plant load requirement
  • 5S Implementation in Feed Mill
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • We carried out day-to-day duties accurately and efficiently.

Senior Electrical Engineer

ARTICULATED VESSELS & UTILITY ENGG.PVT.LTD
08.2012 - 03.2018

DEC.2014 -MAR .2018 VIZIANAGRAM AP

  • Germany based Pulse Grate Biomass Boiler
  • Erection & Commissioning in 6.6MW, POWER PLANT
  • RESPONSIBILITIES:
  • SLD or Control Diagram, P&ID, layout, checking or verifying and reviewing the construction drawings
  • Inspection or installation and testing HT, LT cable
  • Cable routing power & control in JB,LDB,PANELS ,BREAKER, TRANSFORMERS ,LAPT ,NGR,MCC,PCC,BATTERY BANK, ACDB ,DCDB PANEL
  • Installation, checking or testing flow pressure & level transmitters, RTD Thermocouples,& Smart positioners make ABB,SIEMENS, Pneumatic positioners ,motor drives
  • Loop checking & testing Commissioning & pre Commissioning of all field to control , room panels, fuel section, boiler, Turbine & Generator ESP,ACC,DM PLANT ,Fire fighting pump house, instruments, transmitters, control valves, marshalling box, relays panel & motorized dampers ,solenoid switch etc
  • ACHIEVEMENT:
  • Erection & commissioning 132/11kv substation Civil & Electrical, Participated in team-building activities to enhance working relationships.,
  • AUG.2012 -DEC.2014 Raipur (Power plant project & Operation As Electrical Engineer)
  • 1 x 8 MW power plant , 100 TPD X 3 WHRB Horizontal Boiler 36Tan capacity turbine TDPS alternator, 10MVA main & 2MVA Aux Transformer Client Devi, Maintenance work All Motors maintenance in Weekly solve the all electrical problems or maintenance transformer Grid and Auxiliary
  • Operation Work synchronization Grid with T.G
  • Maintenance AC Generators over all protection, over frequency ,under frequency, over voltage, under Voltage phase sequence
  • Turbine Operation work & protection
  • Given shift report & feedback daily plant manager
  • Performed in-depth electrical acceptance testing of completed hardware, including continuity and high-potential isolation testing.
  • Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems.
  • Mentored junior engineers and new hires to better improve competency and efficiency of all staff.

Plant Supervisor

Godrej Agrovet Ltd
04.2010 - 08.2012
  • All Motors Hammer mill, batch mixing, pellet mill, roller, cooler, vibro, bucket elevator maintenance in Weekly, solve the all electrical problems.& mechanical maintenance
  • Lot making by formula, feeding, maintaining productivity, quality control
  • Executing work safely in live areas with necessary precautions
  • Responsible for preventive .corrective /breakdown, and maintenance activities at any time
  • Troubleshooting and preventive maintenance of all types of mechanical, electrical, and production
  • Local purchasing of plant requirement electrical, and mechanical accessories
  • Feedback to daily production report in SAP, to head office
  • Capable of Manpower Management in shift
  • Responsible for lot making to bagging in production time
  • Supervision electrical, mechanical & production ACHIEVEMENT:
  • I have been doing one week of training for advanced-production plant
  • Boiler hydraulic test
  • Scheduled deliveries, employee shifts, and equipment maintenance
  • Monitored safety practices and made changes or recommendations
  • Supervised day-to-day functions of plant
  • Implemented organizational systems to maximize plant efficiency
  • Located and resolved problems with team production and performance to maintain consistent quality levels
  • Increased efficiency [78]% through one-on-one mentoring of staff and [TIME MGM]
  • Supervised ongoing daily production phases.
  • Located and resolved problems with team production and performance to maintain consistent quality levels.

Shift In-charge Electrical

GOPAL SPONGE & POWER PVT LTD SILTARA RAIPUR C, G
10.2008 - 03.2010

1 x 5 MW power plant

  • Where I learn synchronizing with T.G
  • Shift energy consumption of machinery & export -import details reporting to HOD
  • I got position of Shift Engineer within prescribed time based on my performance
  • learned about Testing of Power Transformer
  • Participated in continuous improvement by generating suggestions, engaging in problem-solving activities to support teamwork
  • Carried out day-to-day duties accurately and efficiently
  • Used critical thinking to break down problems, evaluate solutions, and make decisions
  • Identified issues, analyzed information, and provided solutions to problems
  • Maintained energy and enthusiasm in a fast-paced environment.

Diploma Engineer Trainee

G.R SPONGE & POWER PVT LTD
02.2007 - 09.2008
  • 1 X 10 MW power plant Diploma Trainee
  • ACHIEVEMENT:
  • Completed paperwork, recognizing discrepancies and promptly addressing them for resolution
  • Successfully maintained Power plant Sop
  • Worked flexible hours; night, weekend, and holiday shifts
  • Developed team communications and information for meetings
  • Developed and maintained courteous and effective working relationships.
  • Worked flexible hours across the night, weekend, and holiday shifts.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Carried out day-to-day duties accurately and efficiently.
  • Reviewed relevant codes and made decisions by requirements.
  • Analyzed and interpreted data to identify trends and recommend improvements.

Education

M.E - Electrical

CIIMS
Nagpur, MH
12-2019

Diploma - Electrical

Govt .Polytechnical College
Balaghat

Skills

  • - Electrical Engineering
  • - Operations & Maintenance
  • - Engineering Plan
  • - Six Sigma Green Belt
  • - Project Management
  • - Technical Analysis
  • - Inventory Monitoring
  • - Materials Requisition
  • - Vendor Relationship Management
  • - Equipment Inspection
  • - Resource Allocation
  • - Maintenance and Repair Management
  • - Safety Protocols
  • - Preventive Maintenance
  • - Root Cause Analysis
  • - Team Leadership

Certification

• Operations Management & Lean Six Sigma Green Belt: IIM Raipur,India

Aug 2021


• Implementing Maintenance Planning & Scheduling: Reliability Academy, Australia

June 2023 - Nov 202

Accomplishments

• Attained peak production levels through the successful implementation of a maintenance schedule, incorporating controlled wrench time and the 5S methodology in the feed mill.


• Collaborated with a team of five contractors in the development of the Breeder project.


• Received Best Performance Award for meeting production targets with precision and effic

Timeline

Senior Project Engineer

FAMSUN INDIA (Muyang Holdings)
06.2024 - Current

Maintenance Manager

CP FEEDS LTD
05.2022 - Current

• Operations Management & Lean Six Sigma Green Belt: IIM Raipur,India

Aug 2021


• Implementing Maintenance Planning & Scheduling: Reliability Academy, Australia

June 2023 - Nov 202

08-2021

Senior Electrical Executive Project

SUGUNA FOODS PVT LTD
04.2021 - 05.2022

Senior Executive Electrical Feed Mill

Suguna Foods Pvt Ltd
04.2018 - 03.2021

Senior Electrical Engineer

ARTICULATED VESSELS & UTILITY ENGG.PVT.LTD
08.2012 - 03.2018

Plant Supervisor

Godrej Agrovet Ltd
04.2010 - 08.2012

Shift In-charge Electrical

GOPAL SPONGE & POWER PVT LTD SILTARA RAIPUR C, G
10.2008 - 03.2010

Diploma Engineer Trainee

G.R SPONGE & POWER PVT LTD
02.2007 - 09.2008

M.E - Electrical

CIIMS

Diploma - Electrical

Govt .Polytechnical College