Summary
Overview
Work History
Education
Skills
Extra-Curricular Activities
Professional Research Projects
Self Assessment
Personal Information
Disclaimer
Timeline
Generic
MANOJ SONVERSHIYA

MANOJ SONVERSHIYA

Chhindwara,MP

Summary

To work in any organization which could provide me stimulating environment and opportunities to continuously develop and learn new prospectives, so as to enables to utilize my conceptuals, analytical and organizational skills.

Overview

11
11
years of professional experience

Work History

Project Engineer

KUMAR .CONSTRUCTION
01.2024 - Current
  • Company Overview: UNDER INNOVENTURE PVT LTD NAGPUR Project ; Phase -2 A TATA PROJECTS LIMITED (P.E.Building Work) GOVERNMENT Of M.I.D.C.UMRED-NAGPUR
  • He is through with SQC work of Surveying, Estimating And costing Of Earth work, High embankment, Sub grade, Excavation, Backfilling,R.C.C Work (Footing, Columns,Bolt Grouting,Bolt casting, Plinth beams, Trimix floors ,Rumps,Slabs, Returns Wall, Bricks work, Plasters,B.B.S.work Billing Work, R.C.C.Work Blasting Machine Foundation & Safety work etc.) Civil work.
  • UNDER -TATA PROJECTS LIMITED (P.E.Building Work) GOVERNMENT Of M.I.D.C.UMRED-NAGPUR

STRUCTURE ENGINEER& Sr ENGINEER

ARUNAV ENTERPRISES PVT LTD
03.2022 - 11.2023
  • Company Overview: UNDER GOV. Of Municipal corporation in Chhindwara Madhya Pradesh Project; Model Road Collected Banglo to Guraiya Mandi Road Work Chhindwara MP
  • He is through with SQC work of Surveying, Estimating And costing Of Earth work, High embankment, Sub grade R.C.C.Bridges work,Drain work,WMM,BT,C.C.Road Work
  • UNDER GOV. Of Municipal corporation in Chhindwara M.P.

PROJ.ENGINEER

S.R.BHARADWAJ.CONSTRUCTION - Rajasthan
07.2018 - 12.2019
  • Company Overview: UNDER GOVT.OF (M.P.W.R.D.) DINDORI MADHYA PRADESH Project ;Phase-2A DAM & CHANNEL WORK DINDORI M.P.
  • He is through with SQC work of Surveying, Estimating And costing Of Earth work, High embankment, Sub grade, Drain work, Channels Excavation,R C.C.work,HP Calvert, Billing work,etc
  • UNDER GOVT.OF (M.P.W.R.D.) DINDORI MADHYA PRADESH

BILLING NGINEER

TRACKS & TOWERS INFRATECH PVT.LTD.-HYDERABAD
07.2017 - 07.2018
  • Company Overview: UNDER ARCOUNS,LTD JABALPUR (M.P) PROJECTS ; Govt Of Railway Phase -2 Railway Corridor Katni to Jabalpur M.P.
  • He is through with SQC work of Surveying, Estimating And costing Of Earth work, High embankment, Subgrade,Blancket Materials, Drain work,Blast aggregate, billing work,etc.
  • UNDER ARCOUNS,LTD JABALPUR (M.P) PROJECTS ; Govt Of Railway Phase -2 Railway Corridor Katni to Jabalpur M.P.

QC & SITE ENGINEER

G.D.C.LTD.NEW DELHI
07.2016 - 07.2017
  • Company Overview: UNDER ADANI RAILWAY PROJECTS LTD Govt. Of SRCPL C G Projects; Phase -2 Railway Corridor Surguja to Surajpur work
  • He is through with SQC work of Surveying, Estimating And costing Of Earth work , high embankment, Subgrade, Blanket, Drain work,R. C.C.work ,Lab testing Report, Documentation File Report's Work
  • UNDER ADANI RAILWAY PROJECTS LTD (Govt. Of S.R.C.P.L) C.G.

PROJ.ENGINEER

C. R. J. CONGRATULATIONS .MP.
12.2015 - 07.2016
  • Company Overview; UNDER G.D.C.LTD Project; Adani Railway Corridor Phase -2 Surguja to Surajpur C.G.
  • he is through with SQC work Of Surveying, Estimating And costing of Earth work, High embankment, Subgrade, Blancket,
  • UNDER G.D.C.LTD Project; Adani Railway Corridor Phase -2 Surguja to Surajpur C.G.

PROJ.ENGINEER

S.S.BROTHRS CONSTRUCTION -BILASPUR C.G.
04.2015 - 12.2015

*Company Overview; UNDER L&T LIMITED ODISHA Project; National Highway NH-42 Road Work Sambalpur to Raul kala *He is through with SQC work Of Surveying, Estimating And costing of Earth work, High embankment, Subgrade,WMM,BT work, *UNDER L&T LIMITED ODISHA Project; National Highway NH-42 Road Work Sambalpur to Raul kala

Sr.ENGINEER

C .R.J. CONSTRUCTION -MP
07.2014 - 04.2015
  • Company Overview; UNDER R.C.C.PVT.LTD.BHOPAL M.P.Project ; Govt Of PWD.Road State highway phase -2 Rajendra Gram to Ganamar ANUPPUR M.P.
  • He is through with SQC work Of Surveying Estimating And costing of Earth work High embankment Subgrade WMM BT work, Slab Calvert,HP Calvert,C.C.Road work & billing work,etc.
  • UNDER R.C.C.PVT.LTD.BHOPAL M.P.Project ; Govt Of PWD.Road State highway phase -2 Rajendra Gram to Ganamar ANUPPUR M.P.
  • Company Overview; UNDER LANCO.INFERTECH LTD.HYDERABAD.Project ; Govt Of M.B.P.L.POWAR PLANT ANUPPUR M.P.
  • He is through with SQC work Of Surveying, Estimating And costing of Earth work, High embankment, Subgrade ,R.C.C.Drain Work, (ASH DYKE AREA,COAL STRUCK YARDS)& billing work,etc. • UNDER LANCO.INFERTECH LTD.HYDERABAD.Project ; Govt Of M.B.P.L.POWAR PLANT ANUPPUR M.P.

Site Engineer

S.R.BHARADWAJ.CONSTRUCTION-RAJASHTHAN
12.2013 - 07.2014
  • Company.Overview;UNDER,COASTAL.PVT.LTD.HYDERABAD.Project ; Govt Of M.B.P.L.POWAR PLANT ANUPPUR M.P.
  • He is through with SQC work Of Surveying, Estimating And costing of Earth work, High embankment, Subgrade ,R.C.C.Drain Work, (R.W.R-1,RWR-2 AREA,DM PLANTS,) billing work,etc. •UNDER,COASTAL.PVT.LTD.HYDERABAD.Project ; Govt Of M.B.P.L.POWAR PLANT ANUPPUR M.P.

Education

B.E - Civil Engineering

National Institute Of Engineering & Technology( N.I.E.T.)
New Delhi
01.2013

Skills

  • WINDOW- 98
  • 2000-2010
  • ME
  • XP
  • MS Office
  • Fundamental of Computer
  • Working Knowledge of Internet
  • AUTO CAD

Extra-Curricular Activities

Paper presentation on the topic 'Problem of Industrial Sickness in India' Paper presentation on the topic 'Role of Youth & Society in Politics'

Professional Research Projects

  • Role of Price and Quality in purchase intention of detergents.
  • Customer satisfaction towards services provided by Airtel Ltd.

Self Assessment

  • Highly determined and hard working with excellent problem solving skill.
  • Ability to communicate at all levels of management, like to interact with different people.
  • Able to work under stress, Ability to learn new things faster, Good leadership skill with the ability to motivate the team.

Personal Information

  • Relocation: Any Where in India & Abroad
  • Father's Name: P.L. Sonvershiya
  • Mother's Name: Smt. Kakai bai
  • Date of Birth: 02/11/81
  • Gender: Male
  • Nationality: Indian
  • Marital Status: married
  • Religion: Hindu

Disclaimer

I, hereby declare that all the information given above are true to the best of my knowledge & will be supported by original document when required for.

Timeline

Project Engineer

KUMAR .CONSTRUCTION
01.2024 - Current

STRUCTURE ENGINEER& Sr ENGINEER

ARUNAV ENTERPRISES PVT LTD
03.2022 - 11.2023

PROJ.ENGINEER

S.R.BHARADWAJ.CONSTRUCTION - Rajasthan
07.2018 - 12.2019

BILLING NGINEER

TRACKS & TOWERS INFRATECH PVT.LTD.-HYDERABAD
07.2017 - 07.2018

QC & SITE ENGINEER

G.D.C.LTD.NEW DELHI
07.2016 - 07.2017

PROJ.ENGINEER

C. R. J. CONGRATULATIONS .MP.
12.2015 - 07.2016

PROJ.ENGINEER

S.S.BROTHRS CONSTRUCTION -BILASPUR C.G.
04.2015 - 12.2015

Sr.ENGINEER

C .R.J. CONSTRUCTION -MP
07.2014 - 04.2015

Site Engineer

S.R.BHARADWAJ.CONSTRUCTION-RAJASHTHAN
12.2013 - 07.2014

B.E - Civil Engineering

National Institute Of Engineering & Technology( N.I.E.T.)
MANOJ SONVERSHIYA