Chief Engineer
Central Dairy plant
11.2012 - Current
Liaised with regulatory bodies, ensuring all engineering activities complied with legal requirements and industry standards.
Coordinated cross-functional teams across projects, facilitating communication between departments to meet project deadlines.
Directed installation of new machinery and equipment, ensuring compliance with industry standards and safety regulations.
Managed maintenance schedules, overseeing repairs and upgrades to maintain optimal operational efficiency.
Led engineering team in the design, development, and implementation of innovative solutions to complex technical challenges.
Facilitated professional development opportunities for engineering staff, enhancing team capabilities and expertise.
Negotiated contracts with suppliers and vendors, securing high-quality materials and services at competitive prices.
Calculated costs, materials, labour and time required for each project.
Analysed system failures, devising effective solutions to prevent recurrence and enhance reliability.
Kept maintenance logs and confidential records safe on database to enable tracking history, in compliance with privacy regulations.
Ensured optimal functioning of the KCX-2 compressor through regular upkeep.
Preventive maintenance of Cream separator, Pasteurizer, Homogenizer and T.H.E.
Carried out regular cleaning and maintenance duties for boilers.
Follow up of register and there by completion of all pending activities.
Maintenance of generators and periodic checking of oil and coolant levels.
Implemented quality control checks on the sealing process, usage of high quality sealing materials and equipment.
Conduct regular quality checks on packing materials, ensure proper handling and storage to prevent damage.
Implemented temperature monitoring systems to ensure optimal storage and transportation conditions.
Followed hygiene practices by regularly sanitizing equipment and facilities.
Plant Engineer
Ammonia refrigeration, milk concentrate plant and powder plant
11.2012 - Current
Managed overall operations of production plant and maintenance department.
Achieved successful installation and commissioning of a comprehensive array of accessories for the powder plant dryer including air dispenser, cyclone separator, blowers and heaters in addition to various types of dryers.
Performed installation and maintenance of Mycom compressor N8K series (50H.P.).
Executed seamless erection of essential components including I.B.T coil, condenser coil, accumulator, piping, and cooling water line for both chilling plant and milk concentrate plant.
Successfully executed the erection and commissioning of an evaporation unit for a milk concentrate plant. This involved handling crucial tasks such as installing calendria, vapour separator, precondenser, and surface condenser equipment along with overseeing the entire piping work.
Executed erection of a horizontal milk tank, along with installation of P.H.E system, and interconnected the tank with cooling water line through piping.
Facilitated the erection of equipment for milk skimming, including cream separator and pasteurizer.
Demonstrated responsibility by overseeing the erection and commissioning of a one-ton ROSS boiler, a three-ton Thermax boiler, and the installation of I.B.R pipe for boiler piping work.
Installed 3000ltrs R.O plant for boiler feed water tank.
Delivered comprehensive training sessions on equipment operation, elevating staff competency levels.
Coordinated with regulatory bodies to maintain compliance with health, safety, and environmental standards.
Developed and maintained robust relationships with external engineering consultants and service providers.
Optimised inventory levels of spare parts and consumables, preventing production delays due to shortages.
Conducted regular safety audits, significantly reducing workplace accidents and promoting a safety-first culture.
Oversaw the installation and commissioning of new plant machinery, ensuring seamless integration into production lines.
Efficiently executed shut downs for planned maintenance.
Created step-by-step procedures for day-to-day tasks to streamline workflow and improve efficiency.
Developed and implemented operations manuals, policies and procedures and maintenance programmes schedules.
Diagnosed faults in machinery and electrical systems to minimise downtime in production processes.
Supervised subcontractors appropriately and complied with contractual commitments and site operating processes.
Completed all work in line with task schedules and industry best practices.
Conducted routine inspections and maintenance on mechanical equipment to guarantee operational efficiency.
Managed site logbook system and paperwork upkeep for accurate reporting.
Assisted with outside contractor security when brought in to install or service equipment.
Documented all maintenance activities, creating comprehensive reports for management review.
Trained junior engineers and technicians on best practices in maintenance and safety protocols.
Production Manager and R&D Department Official at Modern Dairy Plant Company (Badr Dairy)Production Manager and R&D Department Official at Modern Dairy Plant Company (Badr Dairy)