Summary
Overview
Work History
Education
Skills
Websites
Publication
Languages
Disclaimer
Timeline
Generic

Mayank Agrawal

Water & Wastewater Engineer
Noida

Summary

Professional with 14 years of experience in Water and wastewater domain for Project Management,Bid Process Management, Design and Review for Process & Hydraulic design of Sewer/ water supply/ drainage networks, Design and review of WTPs and STPs and Site activities (Survey Investigations, Sampling).

Overview

14
14
years of professional experience
6
6
years of post-secondary education

Work History

Manager - Water Supply, Sewerage & Rural Unit

Nippon Koei India Pvt Ltd, New Delhi
2022.11 - Current

Job Profile & Key Responsibilities:
Managing and Guiding the Design team for all the relevant project of wet Utilities.
Responsible for Over all Project Management. Design & Review the Detailed Engineering Documents & Drawings
Technical Guidance to all project related issues. Holding key technical discussions with Client and other stake holders.
Frequent meetings with funding Agency, State Govt. & Central Govt.
Site Management and field works
Preparation of Bid Documents and responsible for Bid Process Management in the projects.
Proposal preparation and Business Development.

PROJECT 1:
Name Of Assignment or Project: Capacity Enhancement and Guideline Preparation for the Management of Sewage Sludge (Bio-Solids) in India.
Client: Ministry Of Jal Shakti (National River Conservation Directorate)
Funding Agency: Japan International Cooperative Agency (JICA)
Position Held: National Team Leader/ Sludge Planner
Activities Performed:

Site survey and data collection of various STPs Pan India. Understanding the best & worst practices for STP sludge handling, Study and innovation for the existing technologies for sludge handling, Monitoring, reuse & disposal of Sludge. Preparation of Guidelines for Ministry of Jal Shakti. Dissemination of Guidelines Pan India and updating of the same as per the requirement. Coordination with various Central & state Govt. Ministries. Coordination with JICA.

PROJECT 2:

Name Of Assignment or Project: Data Collection Survey on Disaster Risk Reduction Sector in India

Client: Japan International Cooperative Agency (JICA)

Funding Agency: Japan International Cooperative Agency (JICA)

Position Held: Assistant Engineer- II

Activities Performed:

Responsible for data collection, data analysis, site visits to selected 9 cities, coordination with various state officials, client coordination. Meeting with ULBs and stakeholders of all identified 9 cities. Coordination with stakeholders and ULBs for understanding of the present situation and future interventions proposed. Involved in preparation of preliminary project report of the shortlisted 3 cities for JICA ODA loan for Urban Flood Mitigation project.

PROJECT 3:

Name Of Assignment or Project: Ahmedabad Urban Development Authority (AUDA) – Project Management and Supervision Consultancy [PMSC]

Client: Ahmedabad Urban Development Authority (AUDA)

Funding Agency: ADB

Position Held: : Process Expert (STP)

Activities Performed:

Responsible for reviewing the site survey and investigations reports. Review of Hydraulic network drawings for Sewerage system, water distribution system and Storm water drainage.

Review of process and Hydraulic design/drawings for STPs & WTPs

Assistance in Bid process management for award of work to contractor.

Manager-Design (Head Design)

Welspun Enterprises Limited
2021.10 - 2022.11
  • Hydraulic analysis and detailed design of water supply & Sewerage network
  • Review of Design and Drawing submitted by the Consultants/ contractors for various utilities
  • Wet utilities planning for Smart city Projects
  • Preparation of tender Documents for various components in Infra unit
  • Holding technical and coordination meeting with client
  • Site Management (Land finalization for utilities, Site visits, Survey Supervisions, Stakeholder meetings)
  • Working on Water Gems, Sewer Gems & AutoCAD for design and review.


PROJECT:
NAME OF ASSIGNMENT OR PROJECT: Design and
Execution for Rural water supply schemes for 2500+ villages in 5 districts of UttarPradesh under Jal Jeevan Mission (NMCG).
CLIENT: State Water & Sanitation Mission (SWSM)

POSITION HELD: Head – Design (Water Supply).

ACTIVITIES PERFORMED: Site survey, site coordination, Review of Reports, BOQ, Hydraulic Design, Client Coordination. Attending meetings with Client for discussion on various Project Components, Project planning.

Manager

TATA CONSULTING ENGINEERS LIMITED
2013.12 - 2021.09
  • Job Profile & Key Responsibilities:
    Managing and Guiding the Design team for all the relevant project of wet Utilities.
    Responsible for Over all Project Management. Design & Review the Detailed Engineering Documents & Drawings
    Technical Guidance to all project related issues. Holding key technical discussions with Client and other stake holders.
    Frequent meetings with funding Agency, State Govt. & Central Govt.
    Site Management and field works
    Preparation of Bid Documents and responsible for Bid Process Management in the projects.
    Proposal preparation and Business Development.


PROJECT 1:

NAME OF ASSIGNMENT OR PROJECT: Preparation
of DPR and Detailed Design for Development of Model Village – Sonbarsa, Gorakhpur.

CLIENT: District Administration Gorakhpur and Hindustan Urvarak Rasayan Limited (HURL)

POSITION HELD: Project Manager.

ACTIVITIES PERFORMED: Site survey, site coordination, Preparation of Reports, BOQ, Hydraulic Design, Client Coordination. Attending meetings with Client for discussion on various deliverables for Integrated Sewerage System and Storm Water Drainage System, Smart infrastructure. Assisting project team in preparing BOQ, Conducting workshop and presentation with Client. Conducting Public Consultation Meetings for the Stakeholders, Survey coordination and Project planning.

PROJECT 2:

NAME OF ASSIGNMENT OR PROJECT: Preparation
of DPR and Detailed Design For strengthening Of Water Supply and Sanitation Services Sustainability in Zanzibar.
CLIENT: Zanzibar Water Authority (ZAWA), Zanzibar, Tanzania
POSITION HELD: Project Manager & Procurement Expert.
ACTIVITIES PERFORMED: Site survey, site coordination, Preparation of Reports, BOQ & Bid Preparation, Hydraulic Design, Client Coordination. Attending meetings with Client and ULBs for discussion on the Inception, Feasibility and Detailed Project Reports for Integrated Sewerage System and Water supply schemes, Revising the submitted reports as per Client's observation, Review of detailed design and drawings of above projects, Assisting project team in preparing BOQ and tender documents, Conducting workshop and presentation with Client and ULBs, Conducting Public Consultation Meetings for the Stakeholders, Survey coordination and planning for topography, Geotech and Water sampling.


PROJECT 3:
NAME OF ASSIGNMENT OR PROJECT: Madhya
Pradesh Urban Service Improvement Program (ADB Funded).
CLIENT: Madhya Pradesh Urban Development Company (MPUDC).
POSITION HELD: Assistant Contract Manager and
Hydraulic Engineer.
ACTIVITIES PERFORMED: Hydraulic design Review of External services i.e., Water supply, sewerage system, Evaluation of bid documents and Bid Process Management, assist client in award of work for various schemes covered under the project.


PROJECT4:
NAME OF ASSIGNMENT OR PROJECT: NMCG-PMU-NGRBA Projects.
Client: National Mission for Clean Ganga

POSITION HELD: DPR reviewer & Project Planning.

Activities performed: Review of DPRs for Sewerage, Septage Interception & Diversion Concepts. Review of DPRs for River front development projects. Organizing workshops for various Central Govt. stake holders.

PROJECT 5:
NAME OF ASSIGNMENT OR PROJECT: Prep of DPR's
and PMC to execute Integrated Sewerage and Strom Water Drainage across various towns in Jharkhand Package 1 & 2.
CLIENT: Jharkhand Urban Infrastructure Development Company (JUIDCo).
POSITION HELD: Site Project Manager/ senior surveyor and Procurement Expert.
ACTIVITIES PERFORMED: Assist the Project Team in Preparation of reports, Planning & scheduling, Attending meetings with Client and ULBs for discussion on the Inception, Feasibility and Detailed Project Reports for Integrated Sewerage System and Storm Water Drainage System, Revising the submitted reports as per Client's observation, Review of detailed design and drawings of above projects, Assisting project team in preparing BOQ and tender documents, Conducting workshop and presentation with Client and ULBs, Conducting Public Consultation Meetings for the Stakeholders, Survey coordination and planning for topography, Geotech and Water sampling. Completion of willingness to pay survey, Identification and obtaining revenue details for the land for STP/SPS. Meeting with funding agencies like World Bank,
NCLP, NRCD, Namami Gange, AMRUT. Development of Resources for site work, Preparation & Evaluation of bid documents for various schemes covered under the project with different funding Agencies.

PROJECT 6:
NAME OF ASSIGNMENT OR PROJECT: ADB – UUSDIP
Gharwal Region.
CLIENT: Uttarakhand Urban Sector Development Agency
POSITION HELD: Wet Utility Engineer/ Procurement Expert.
Activities performed: Review & optimization of hydraulic design for Water supply, sewerage system, Meeting with Client, site activities.


PROJECT 7:
NAME OF ASSIGNMENT OR PROJECT: PMC for
area-based development of Satna Smart City.

CLIENT: Satna Smart City Development LTD.

POSITION: Bid Process Management Expert
Activities performed: Hydraulic design of External services i.e., Water supply, sewerage system, drainage system, Solid waste Management, recycle water, Liaison with client, site activities, planning & scheduling of the project, Preparation & Evaluation of bid documents for various schemes covered under the project.


PROJECT 8:
NAME OF ASSIGNMENT OR PROJECT: Kalinga
Nagar project Orissa - 6 MTPA INTEGRATED STEEL PLANT - water supply system.
CLIENT: TATA Steel Limited
POSITION HELD: Project Manager.
Activities performed: Coordination with team and client for day-to-day basis activities. Project Management related activities and updating in the system.


PROJECT 9:
NAME OF ASSIGNMENT OR PROJECT: Design
Review and Construction Supervision for Road Developed by HUDA And DLF at Gurgaon
CLIENT: Haryana Urban Development Authority (HUDA).
POSITION HELD: Drawing and Design reviewer.

ACTIVITIES PERFORMED: Analysis the drawings of the road in order to shift the pipelines as per the
road profile.


PROJECT 10:
NAME OF ASSIGNMENT OR PROJECT: Water Supply
for Madhupur city, Jharkhand
CLIENT: Madhupur Nagar Parishad.

POSITION HELD: Project Manager Cum Procurement Expert
ACTIVITIES PERFORMED: Review & optimization of hydraulic design for Water supply, Meeting with Client, site activities, detailing of survey investigations, Review of BOQs and bid preparation.

PROJECT 11:

NAME OF ASSIGNMENT OR PROJECT: Prep of DPRs
for 24x7 water supply, integrated sewerage and SWD systems for 59 towns Pkg 1, Pkg 7 & Pkg 10
CLIENT: Bihar Urban Infrastructure Development Company (BUIDCo).
POSITION HELD: Project Engineer.
ACTIVITIES PERFORMED: Preparation of DPR for various Towns and working on Water Gem & Sewer Gem software's for designing & optimization of pipelines for water and Sewer, tube well connections, reservoirs sizing and calculation for wastewater generation.

PROJECT 12:
NAME OF ASSIGNMENT OR PROJECT: Consultancy
Services & Preparation of Standardized DJB Schedule of Rates (SoR)
CLIENT: DELHI JAL BOARD (DJB).
POSITION HELD: Project Manager
ACTIVITIES PERFORMED: Preparing detail Rate analysis for all the civil and electromechanical items. Working on various technologies like cured in place piping & spiral wound for sewer rehabilitation under trenchless technology. Tunnel boring & micro tunneling for trenchless technology.

Design Engineer

LARS Enviro Pvt. Ltd.
2011.07 - 2013.07

PROJECT 1:
NAME OF ASSIGNMENT OR PROJECT: Revamping of
ETP for SABMiller, Saharanpur (UP)
CLIENT: SABMiller (Fosters Beer Plant) Saharanpur
POSITION HELD: Design Engineer
KEY RESPONSIBILITIES: Study of
existing system, revamping of existing system, compilation of new additional treatment unit with existing system and making overall system more efficient

PROJECT 2:
NAME OF ASSIGNMENT OR PROJECT: Up-gradation
of ETP to Zero Liquid Discharge for Rajasthan Liquors Dera Bassi, Punjab.
CLIENT: Rajasthan Liquors, Punjab.
POSITION HELD: Design Engineer
KEY RESPONSIBILITIES: Study of
existing system, revamping of existing system, compilation of new additional treatment unit with existing system, deigning UF and RO systems and making overall system more efficient.

PROJECT 3:
NAME OF ASSIGNMENT OR PROJECT: Design of ETP
for Uttarakhand Sugar Mill, Dehradun.
CLIENT: Uttarakhand Co-operative sugar Mill.
POSITION HELD: Design Engineer
KEY RESPONSIBILITIES: Study of Inlet
and desirable outlet parameters, Design of system as per the land available, use of spent wash for Solid waste Management of Begas.

Environmental Engineer

Sophisticated Industrial Material Analytic (SIMA) Labs Pvt. Ltd.
2011.07 - 2013.07

Working on technology-based designing for STP, ETP, WTP, UF & RO Engaging in preparing tenders and proposals for STP, ETP, WTP, UF & RO and contract management & bidding Meeting with clients for technical and commercial activities Determining and writing engineering specifications, planning work, report and coordination Equipment sizing and selection to work directly with clients Evaluating technicalities and preparing datasheets of brought out and fabricated items like Tanks, Filter Column, pump and calibration instruments Preparing piping deliverable list, document control & material control index as per project schedule Conducting work sessions for design development and contract document in conjunction with other staff Reviewing specifications like Piping Material & Valve Material Specification, Piping Standard Drawings Coordinating with Client Engineering Team for resolving site query Interacting with Project Planning & Contract Management Team for any change in work scope with respect to bidding documents/drawings resulting in time/cost implication of a project.


PROJECTS 1:
NAME OF ASSIGNMENT OR PROJECT: 500 KLD STP
(MBR) Shiv Nadar University, Gr. Noida.
CLIENT: Shiv Nadar University.
POSITION HELD: PROJECT/ DESIGN ENGINEER

ACTIVITIES PERFORMED: PREPARATION OF DETAIL DESIGNS AND DRAWINGS, BOQ, BASIC
ENGINEERING DOCUMENT. CO-ordination with execution team, vendor selection and negotiations, Proposals.

PROJECT 2:
NAME OF ASSIGNMENT OR PROJECT: JP Sports city
STP 3 MLD expandable to 18 MLD (SBR) Gr. Noida.
CLIENT: J P Associates.
POSITION HELD: PROJECT/ DESIGN ENGINEER

ACTIVITIES PERFORMED: PREPARATION OF DETAIL DESIGNS AND DRAWINGS, BOQ, BASIC
ENGINEERING DOCUMENT. CO-ordination with execution team, vendor selection and negotiations, Proposals.

PROJECT 3:
NAME OF ASSIGNMENT OR PROJECT: Hero Moto
Corp Ltd, Gurgaon 400 KLD ETP & STP (MBBR) with Zero liquid discharge concept.
CLIENT: HMCL.
POSITION HELD: PROJECT/ DESIGN ENGINEER

ACTIVITIES PERFORMED: PREPARATION OF DETAIL DESIGNS AND DRAWINGS, BOQ, BASIC
ENGINEERING DOCUMENT. CO-ordination with execution team, vendor selection and negotiations, Proposals.

PROJECT 4:
NAME OF ASSIGNMENT OR PROJECT: La Tropicana,
residential 750 KLD STP (MBBR).
CLIENT: PARSAVNATH DEVELOPERS.

POSITION HELD: PROJECT/ DESIGN ENGINEER
ACTIVITIES PERFORMED: PREPARATION OF DETAIL DESIGNS AND DRAWINGS, BOQ, BASIC
ENGINEERING DOCUMENT. CO-ordination with execution team, vendor selection and negotiations, Proposals.


PROJECT 5:
NAME OF ASSIGNMENT OR PROJECT: Pioneer
Developers, residential 900 KLD STP (MBBR).
CLIENT: Pioneer Developers.
POSITION HELD: PROJECT/ DESIGN ENGINEER

ACTIVITIES PERFORMED: PREPARATION OF DETAIL DESIGNS AND DRAWINGS, BOQ, BASIC
ENGINEERING DOCUMENT. CO-ordination with execution team, vendor selection and negotiations, Proposals.

PROJECT 6:
NAME OF ASSIGNMENT OR PROJECT: Dharmpal
Satyapal (DS) Group, 150 m3/hr WTP.
CLIENT: Pioneer Developers.
POSITION HELD: PROJECT/ DESIGN ENGINEER

ACTIVITIES PERFORMED: PREPARATION OF DETAIL DESIGNS AND DRAWINGS, BOQ, BASIC
ENGINEERING DOCUMENT. CO-ordination with execution team, vendor selection and negotiations, Proposals.
PROJECT 7:
NAME OF ASSIGNMENT OR PROJECT: Miscellaneous Projects.
CLIENT: VARIOUS.
POSITION HELD: Project/ Design Engineer

ACTIVITIES PERFORMED: Preparation of detail designs and drawings, BOQ, Basic Engineering Document. Co- ordination with execution team, vendor selection and negotiations, Proposals.
Working on different technologies of STP (Extended Aeration, SAFF, MBBR, SBR, MBR), water treatment plants and ETPs of variable capacity.

Junior Research Fellow

Indian Institute of Technology, Bombay
2011.01 - 2011.12

PROJECT:

NAME OF ASSIGNMENT OR PROJECT: Ganga River
Basin Management Program.
POSITION HELD: Junior Research Fellow (JRF)
ACTIVITIES PERFORMED: Research scholar and Design Engineer in Ganga River basin Management Program under NEERI and MoEF for collection of primary and secondary data from field, project planning, site selection, water sampling schedule, water testing & analysis using most advanced and sophisticated equipment like
UV-Spectrophotometer, AAS, Flame Photometer, Conductivity meter etc. & preparation of project report.

Design Engineer

Clover organic Pvt. Ltd.
2010.06 - 2010.12

PROJECTS 1:
NAME OF ASSIGNMENT OR PROJECT: Reduction of
oil Sludge by Bio-remediation.
CLIENT: Chennai Petroleum Co-operation Ltd. (CPCL)
POSITION HELD: Project Engineer
ACTIVITIES PERFORMED: Study of oil sludge parameters, Identified bacterial range for oil sludge reduction. Pilot plant testing.

PROJECT 2:
NAME OF ASSIGNMENT OR PROJECT: Solid waste
Management and compost formation at Panipat Co- operative Sugar Mill.
CLIENT: Panipat Co-operative Sugar Mill.
POSITION HELD: Project Engineer
ACTIVITIES PERFORMED: Study of SW generated, process for waste Management and windrow method for preparation of compost.

Education

MTech With 9.01percentile - Enviroment Engineer

SGT University
Gurugram
2021.07 - 2023.05

B.Tech With 72.4% - Environmental Engineering

Hindustan College of Science And Technology, UPTU
Mathura
2006.08 - 2010.05

Higher Secondary - Science (PCMC)

Theosophical Inter Collage (CBSE)
Etawah
2001.04 -

Secondary - All Subjects

St. Mary's Inter College (CBSE)
Etawah
2001.04 -

Skills

undefined

Publication

Internationally Published Research paper on Solid Waste Management“The Road to Zero Waste: Anaerobic Digester”, published in Integrated Publishing Association Volume 3 issue 5 2013 Pages1390 to 1397.


www.ipublishing.co.in/ijesarticles/thirteen/lpages/0305/jeslpvol3issue50009.html




Languages

English
Hindi

Disclaimer

I consider myself to be familiar with the various aspects of Environmental Engineering. I hereby declare that the above information given is true to the best of my knowledge.

Timeline

Manager - Water Supply, Sewerage & Rural Unit

Nippon Koei India Pvt Ltd, New Delhi
2022.11 - Current

Manager-Design (Head Design)

Welspun Enterprises Limited
2021.10 - 2022.11

MTech With 9.01percentile - Enviroment Engineer

SGT University
2021.07 - 2023.05

Manager

TATA CONSULTING ENGINEERS LIMITED
2013.12 - 2021.09

Environmental Engineer

Sophisticated Industrial Material Analytic (SIMA) Labs Pvt. Ltd.
2011.07 - 2013.07

Design Engineer

LARS Enviro Pvt. Ltd.
2011.07 - 2013.07

Junior Research Fellow

Indian Institute of Technology, Bombay
2011.01 - 2011.12

Design Engineer

Clover organic Pvt. Ltd.
2010.06 - 2010.12

B.Tech With 72.4% - Environmental Engineering

Hindustan College of Science And Technology, UPTU
2006.08 - 2010.05

Higher Secondary - Science (PCMC)

Theosophical Inter Collage (CBSE)
2001.04 -

Secondary - All Subjects

St. Mary's Inter College (CBSE)
2001.04 -
Mayank AgrawalWater & Wastewater Engineer