Summary
Overview
Work History
Education
Skills
Software
Professional Registration
Personal Information
Certification
Timeline
Hi, I’m

Mayank Kumar Gupta

MEP General Manager-BIM & Design
Gurgaon

Summary

Customer-oriented MEP General Manager with 18 years of experience focused on increasing revenues and expanding margin. Adaptive and deadline-oriented consistently executes and completes multiple MEP projects in high-stress environments.

Overview

18
years of professional experience
1
Certification

Work History

Intec Infra Technologies Pvt. Ltd.

General Manager-MEP
04.2023 - Current

Job overview


  • Overseeing MEP BIM & Design implementation and integration across all MEP projects. Ensuring that employees have access to the necessary tools and software.
  • Managing client relationships and ensuring project deliverables meet or exceed expectations.
  • Coordinating with other departments (e.g., Architecture, Structural) to ensure seamless integration.
  • Developing and maintaining best practices for the organization. Staying informed on developments in building technologies.
  • Budget management and resource allocation for MEP projects. Generating reports for management on a monthly basis for Projects review.
  • Quality control and assurance of MEP designs and BIM models. Ability to prioritize multiple tasks seamlessly with excellent attention to detail.
  • Mentoring and developing staff to enhance team capabilities. Early design review and constructability analysis.
  • Estimation the Project, Participating in business development activities and proposal preparation. Supporting the HOD/management in defining contractual aspects.
  • Ensuring compliance with relevant codes, standards, and regulations. Preparing schematic drawings, shop drawings and fabrication drawings.
  • Type of MEP Projects handled

Residential Buildings

Commercial Buildings

Mixed use buildings

Airports & Metro Projects


Intec Infra Technologies Pvt. Ltd.

DGM- MEP
04.2020 - 03.2022

Job overview

  • Oversight Manager for MEP Design & BIM Projects
  • Resolving issues which Project Managers & Team are facing.
  • MEP Projects Estimation & Supporting BD Team during Pre BID Stage
  • Team management & Resource allocation based on Projects requirement


Intec Infra Technologies Pvt. Ltd.

Project Manager- MEP
12.2018 - 03.2020

Job overview

  • Project planning and scheduling
  • Resource allocation and management
  • Client communication and relationship management
  • Quality control of MEP models and drawings
  • Controlling the Estimated Project hours by enhancing the productivity methods.
  • Team leadership and performance management
  • Ensuring compliance with industry standards and regulations
  • Conflict resolution and problem-solving
  • Progress reporting and documentation
  • Technology adoption and workflow optimization
  • Contract management and negotiation
  • Overseeing design assistance and value engineering processes

Tractebel Engineering Pvt. Ltd.

Sr. Manager Mechanical
03.2012 - 12.2018

Job overview

  • Cooling & Heat load calculations.
  • Preparation / Review of Detailed HVAC design drawings, Schematic Drawings & Riser Diagrams.
  • Prepare conceptual and detailed engineering design basis report, specifications, standard details, BOQ.
  • Technical Evaluation of the HVAC equipment’s with vendors.
  • Carry out detailed design like heat loads (Software & Excel sheet), Pressurization calculation & pump head calculation.
  • Equipment sizing and selection for HVAC systems
  • Coordination with Architects & structure and provided initial input for preparation of Architectural & structural drawings based on HVAC inputs & participating in IDC process
  • Provided HVAC service input to Electrical and other MEP services in initial stage onwards for smooth progress of the drawings & design.
  • In-depth knowledge of HVAC calculations, and HVAC Standards. (ASHRAE/ISHRAE/NBC/IS/CIBSE Guides

Bluestar Ltd.

Assistant Manager HVAC
02.2011 - 03.2012

Job overview


  • In-depth knowledge of HVAC calculations, and HVAC Standards. (ASHRAE/ISHRAE/NBC/IS/CIBSE Guides
  • Preparing of HVAC GFC drawings.
  • Reviewing Vendor's Technical Submittals/Technical Data Sheet
  • Getting approval of drawings & Submittals from Engineering Consultants.
  • Equipment sizing and selection for HVAC systems.
  • Supporting/Coordinating with site team.

Important Job Handled while working in Bluestar Ltd.

  • Platina Mall Gurgaon
  • Pristine Mall Punjab
  • DLF Building-8
  • MGF Villas
  • Emaar MGF Palm Drive
  • Suncity Trade Tower.
  • ISBT Kashmere Gate Redevelopment

Mott MacDonald Private

Sr. Engineer HVAC
09.2010 - 02.2011

ETA Engineering Pvt. Ltd

Sr. Engineer HVAC
07.2006 - 08.2010

Job overview

Important Job Handled while working in ETA

  • IGI Airport Terminal-3
  • JMD Regent Mall Gurgaon
  • Sherpa Mall Gaziabad
  • MGF Metropolis Mall Gurgaon
  • Orchid Centre Gurgaon


Role: Performing HVAC Design Validation, Preparing of HVAC GFC drawings.

Reviewing Vendor's Technical Submittals/Technical Data Sheet.

Equipment sizing and selection for HVAC systems.

Getting approval of drawings & Submittals from Engineering Consultants.

Education

G.B Pant University, Pantnagar

B.Tech Mechanical Engineering

Skills

Project Management

Software

MS Excel & MS Word

MS Power Point

Elite Chvac

HAP

Navisworks

Revit

Power BI & AI tools

Professional Registration

  • Member of Indian Society of Heating, Refrigerating and Air Conditioning Engineers (ISHRAE)
  • Member of CWC Team ISHRAE Gurgaon Chapter
  • Member of The Institution of Engineers (IEI)

Personal Information

  • Age: 40
  • Date of Birth: 10/04/83
  • Gender: Male
  • Marital Status: Married

Certification

Chartered Engineer CEng

Timeline

General Manager-MEP

Intec Infra Technologies Pvt. Ltd.
04.2023 - Current

DGM- MEP

Intec Infra Technologies Pvt. Ltd.
04.2020 - 03.2022

Project Manager- MEP

Intec Infra Technologies Pvt. Ltd.
12.2018 - 03.2020

Sr. Manager Mechanical

Tractebel Engineering Pvt. Ltd.
03.2012 - 12.2018

Assistant Manager HVAC

Bluestar Ltd.
02.2011 - 03.2012

Sr. Engineer HVAC

Mott MacDonald Private
09.2010 - 02.2011

Sr. Engineer HVAC

ETA Engineering Pvt. Ltd
07.2006 - 08.2010

G.B Pant University, Pantnagar

B.Tech Mechanical Engineering
04.2006
Mayank Kumar GuptaMEP General Manager-BIM & Design