Obtain a challenging leadership position applying creative problem solving and lean management skills with a growing company to achieve optimum utilization of its resources and maximum profits.
English, Hindi, Gujarati
COST REDUCTION PROJECT, Reduce the Aluminium foil size upto 15 mm that leads to reduces design scrap., INCREASE PRODUCTION CAPACITY, With use of line balancing that leads to increase hourly production Rate to achieve management Goals, Eliminate wastes of production line like, 1) Equipment failure, 2) set-up loss, 3) Idling of machine and continuous process, Measuring tool - OEE analysis
- I was a coordinating member for sports events for last 3 years and Vice-Captain of my final year cricket team which ended up as runners up.