Summary
Overview
Work History
Education
Skills
Languages
CERTIFICATION
DATE OF BIRTH
Timeline
Generic
MD JIAUL HAQUE

MD JIAUL HAQUE

Bardhaman

Summary

About 22 years of experience in Construction Management as a Land Surveyor in Highway and Railway Project. Layout of structure like culvert, underpass, RE wall, PCC wall, minor bridges and major bridges in highway & Railway projects. Preparing All Kind of Survey data for Highway & Railway work. Fixing of Alignment and levels for Embankment, Sub grade, Sub-base & Base-course, bituminous course. Having knowledge about horizontal and vertical Traversing and adjustment of traverse error. Prepare cross section in Road Estimator for Earthwork Quantity. Preparation of Client Contractor’s bill. Site measurement & preparation of documents for bill. Monthly reconciliation for used materials. Preparation of Daily and Monthly Progress Report. Prepare Horizontal alignment and Vertical Profile in civil 3D. Having knowledge about building Lay-out and can prepare building drawing in AutoCAD. Preparation of cross section in AUTODESK LAND DESKTOP to calculate quantity from Total Station Data. Preparation of Structure Lay out Drawing for Major Bridge, Minor Bridge, Box culvert, VUP and LVUP in Auto CAD. Calculate horizontal and vertical alignment Data from Plan & Profile for highway and Structure Work. Having adequate Knowledge of Total Station Sokkia (SET-5E,610, CX-101,610k,650,1030R), Nikon (330) and Leica(TC-1201,TS-02, TS-06) Having good knowledge about Auto Level (Sokkia, Nikon, Leica, and Topcon). Co-ordination among consultants, contractors and clients. Preparing Vertical Profile as Per Existing Road Profile.

Overview

22
22
years of professional experience

Work History

Sr. Manager (Survey)

LC Infra Projects Pvt. LTD.
06.2024 - 01.2025
  • Construction of New Broad-Gauge LineTrack Between Yadw(excl.)and Jamkhandi (excl.)fora length of-24.61km Under Bagalkot-Kudachi New Line Project (142Km) including Signal & Telecommunication & Electrical Works.
  • Worth: 420 Crores
  • EPC Contractor: LC Infra Projects Pvt. LTD
  • Client: South Western Railway

Sr. Manager (Survey)

KNIT Infra Private Limited
05.2023 - 06.2024
  • DEVELOPMENT OF 6-LANE ACCESS CONTROLLED GREEN FIELD HIGHWAY FROM Km. 162+500 TO Km. 203+100 BASWANTPUR TO SINGNODI SECTION OF NH- 150C (PACKAGE- IV OF AKKALKOT - KNT/TS BORDER) ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJNA.
  • Worth: 700 Crores
  • Contractor: KNIT Infrastructure PVT. LTD.
  • EPC Contractor: ASHOKA BASWANTPUR SINGNODI ROAD PVT.LTD
  • Client: N.H.A.I
  • Consultant: L.N. Malviya Infra Project Pvt. Ltd.

Assistant Manager (Survey)

Ashoka Buildcon Limited
09.2021 - 12.2022
  • Six Laning of National Corridor NH 19 from Panagarh to Palsit from Km. 521+120 to Km. 588+870 (Total Design Length 67.750 Km) in the state of West Bengal under Bharatmala Pariyojana to be executed by BOT (Toll) Basis
  • Worth: 1567 Crores
  • Concessionaire: Panagarh Palsit Road PVT. LTD.
  • EPC Contractor: Adani Road Transport LTD.
  • Client: N.H.A.I
  • Consultant: L.N. Malviya Infra Project Pvt. Ltd.

Senior Executive (Survey)

Ashoka Buildcon Limited
09.2015 - 10.2018
  • Eastern Peripheral Expressway (NE-II) Kundli-Gaziabad-Palwal
  • Worth: 780 Crores
  • Client: N.H.A.I
  • Consultant: M/s URS Scott Wilson India Private Limited with Consulting Engineers Group Ltd in Association with AECOM India.
  • Instrument used: Total Station 610, sokkia 1030R, leica, Auto Level-Sokkia C-310, Topcon.

Surveyor

Ashoka Buildcon Limited
03.2012 - 09.2015
  • Construction of Four Laning of Sambalpur to Orissa /Chhattisgarh Border section Of NH-6 KM from 0+000 to 88+378 (B.O.T)
  • Worth: 1008 Crores
  • Client: N.H.A.I
  • Consultant: ICT
  • Instrument used: Total Station 610, sokkia 1030R, leica, Auto Level-Sokkia C-310, Topcon.

Assistant Manager (Survey)

Ashoka Buildcon Limited
01.2010 - 03.2012
  • Construction of Six/Eight Lane Vadodara Kim Expressway from Km 279.00 to Km 292.00 (Ankleshwar to Manubar Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on Hybrid Annuity mode (Phase IA-Package IV).
  • Worth: 1600 Crores
  • Client: N.H.A.I
  • Consultant: M/s. SA Infrastructure Consultants Pvt. Ltd.

Senior-Surveyor

DS Construction Ltd.
01.2010 - 03.2012
  • Railway project at Bilashpur (C.G. & M.P.)
  • Worth: 225 Crore
  • Client: R.V.N.L.
  • PMC: BHOBAY Consultancy Pvt. Ltd. (Mumbai)

Surveyor

Sunway Construction Sdn. Bhd.
06.2006 - 12.2009
  • Rehabilitation and upgrading of Km-406to Km 449.15 of NH-76 to 4-lane configuration in the State of Rajasthan Package EW-II (RJ-09)
  • Worth: Rs 387 Crore
  • Client: NHAI, New Delhi
  • Consultant: Wilber Smith Associates. (USA)

Assistant Surveyor

GAMUDA W.C.T INDIA P.V.T.
03.2003 - 05.2006
  • Four Laning including strengthening of existing two-lane pavement of NH-2 from Panagarh to Palsit in the State of West Bengal
  • Worth: 400 Crore
  • Client: N.H.A.I
  • PMC: L.A.S.A
  • Instrument used: Total station Nikon 330, sokkia set-5E Auto level- (Topcon, sokkia, Nikon)

Education

Senior secondary -

West Bengal board of secondary education

Higher secondary - undefined

West Bengal board of higher secondary education

ITI - Survey

East India Technical Institution

Diploma - Civil

Omega Institute of Management and Technology

Skills

  • Land desktop-2009
  • Auto CAD Civil 3D
  • Auto CAD
  • Auto plotter Road Estimator

Languages

Bengali: Speaking - Excellent, Reading - Excellent, Writing - Excellent
English: Speaking - Good, Reading - Good, Writing - Good
Hindi: Speaking - Excellent, Reading - No, Writing - No

CERTIFICATION

I, the undersigned, certify that, to the best of my knowledge and belief, this bio data correctly describes my self, my qualifications and my experience. I understand that any willful mish-statement described herein may lead to my disqualification or dismissal. If employed.

DATE OF BIRTH

1979-04-26

Timeline

Sr. Manager (Survey)

LC Infra Projects Pvt. LTD.
06.2024 - 01.2025

Sr. Manager (Survey)

KNIT Infra Private Limited
05.2023 - 06.2024

Assistant Manager (Survey)

Ashoka Buildcon Limited
09.2021 - 12.2022

Senior Executive (Survey)

Ashoka Buildcon Limited
09.2015 - 10.2018

Surveyor

Ashoka Buildcon Limited
03.2012 - 09.2015

Senior-Surveyor

DS Construction Ltd.
01.2010 - 03.2012

Assistant Manager (Survey)

Ashoka Buildcon Limited
01.2010 - 03.2012

Surveyor

Sunway Construction Sdn. Bhd.
06.2006 - 12.2009

Assistant Surveyor

GAMUDA W.C.T INDIA P.V.T.
03.2003 - 05.2006

Higher secondary - undefined

West Bengal board of higher secondary education

ITI - Survey

East India Technical Institution

Diploma - Civil

Omega Institute of Management and Technology

Senior secondary -

West Bengal board of secondary education
MD JIAUL HAQUE