TBM & TUNNELING
- Interface of tunnel and surface functional requirements and gained experience with EPB and Hard Rock Dual mode TBM.
- Management of various disciplinary bodies of tunnel team and whole program planning and execution of TBM activities.
- TBM Launching- Cradle installations and alignment along with associated installation of thrust frame and pedestals.
- Initial drive& Final drive- TBM lowering, Ring delivery, temporary ring installation and dismantling, movement of Back-up gantries.
- Mining, Disposal, Ring (Key) selection, grouting and checking of Steps & Lips between the rings built . Cutterhead intervention- Inspection and drafting of report.
- Primary and secondary grouting- Alcoffine grouting, PU grouting for leakages. Repairing of cracks, leakages or spalls
- First bed concrete along with installation of shear connectors for track.
- Responsible for handling project activities involving working out various requirements with respect to equipments, material, manpower & overall project operation for ensuring timely completion.
- Cut and Cover Station and Ramp
- Overall Site Development and various construction for utility extensions which includes trenches, and diversions.
- Responsible for the Excavation and soil rock supporting system of the shaft which included Control blasting, hard rock breaking and muck disposal ,Shotcrete, Rock Bolt, Rock Anchor etc.being the activities involved.
- Execution and Monitoring the Secant piling,Soldier Pile, capping beam and flood wall activity as per the design criteria and BBS.
- Fabrication and erection of Strut and Waler system including Plunge columns (King posts), brackets etc.
- Directed activities to ensure compliance with environmental regulations and approved method statements.
- Read and interpreted blueprints, technical drawings and schematic drawings.
Architectural Finishing works – Station
- Execution of finishing work of various rooms in station.
- Execution of Blockwork,VDF, SCREED, Tiling drains,Putty and paint work.
- Handling the handover of rooms and Inspection to various respective clients/parties as an interface Leader .
Site Planning & billing and Documentation
● Handling the construction layout drawings and underground
structure drawings.
Preparation of method statement, SOP and amendment as per client’s comments.
● Yearly, monthly, weekly, micro planning of site activities and discussing the same in project meetings.
● Proficient in advance planning and management of materials, manpower, machineries etc.
● Developing a proper plan considering the target dates and various milestones and reviewing.
● Handled billing of subcontractors as per the measurement of work at site.
● Knowledge of the documentation required for the project as per the contractual requirements.
● Client/General consultant Handling.