Summary
Overview
Work History
Education
Skills
Personal Information
Training
Timeline
Generic
MEHDI HUSSAIN

MEHDI HUSSAIN

QAQC Manager
Delli

Summary

Seasoned MEP QA/QC expert with 11 years of experience overseeing quality control for large-scale data center and commercial projects. Consistently achieves project delivery that meets or exceeds stakeholder expectations while adhering to international compliance standards. Adept at leading diverse teams, driving process enhancements, and performing comprehensive audits. Committed to contributing to a prestigious organization by utilizing a strong background in both technical and managerial capacities.

Overview

10
10
years of professional experience
3
3
Languages

Work History

Project Lead QA/QC

Jones Lang LaSalle, JLL
04.2023 - 12.2025

current organization - Colliers

join- 05-01-2026 to present

new delhi noida adani (google data center 48 megawatts)

project: - Adani (Microsoft Data Centre) 48 MW Hyderabad

work scope: -project requirements:

value: 4 billion

scope: mechanical firefighting electrical plumbing apparatus and supplies

proficiency in technical fields

analyze technical schematics

Applied Indian standards including ISHRAE, ASME, ASTM, AWS, NFPA, and SMACNA in projects. Ensured compliance with relevant industry standards to enhance quality and safety. Implemented best practices from ISHRAE and ASME for HVAC systems design and installation. Utilized ASTM and AWS standards to maintain material integrity in construction processes. Integrated NFPA guidelines for fire protection and safety measures in designs. Followed SMACNA standards to optimize ductwork fabrication and installation. Conducted training sessions on adherence to Indian standards for team members. Reviewed project specifications against established standards to ensure regulatory compliance.

quality control procedures:

evaluation of quality assurance and quality control documents (method statements, inspection and test plans, quality assurance plans)

Performed incoming material inspections to ensure compliance with specifications. Executed stage inspections to verify adherence to quality standards. Conducted mock-up inspections to assess design accuracy and functionality.

revitalizing monthly and weekly contractor management reports.

finalize and assess contractor evaluations monthly

collaboration with QA/QC engineers for mock-up RFIs and site inspections

execution and framework:

heating, ventilation, and air conditioning

temperature regulation system

fire protection systems

Operated FHC jockey pumps to sustain optimal water pressure in systems. Managed diesel pumps to ensure reliable fuel supply across operations. Oversaw sprinkler pump functions for effective irrigation and water distribution. Conducted routine maintenance on pump systems to prevent operational failures.

Executed fwu to enhance operational efficiency. Implemented pahu to improve process effectiveness. Developed rtu strategies to optimize resource utilization.

diesel generator units and exhaust solutions

pumping systems and hsd storage options

subject matter proficiency:

imir analysis and evaluation

welding credentials and training

project management coordination:

engineering design assessments

evaluate as-built modifications shop drawings

equipment quality assurance evaluations

issue resolution log oversight

design issue resolution

evaluate WMS and installation checklist

client and vendor meetings

CAD responsibilities

Mechanical Site Engineer

L&T Technology Services
02.2022 - 04.2023
  • Project: - Unified Network Management System (Indian Army Data Centre (Regional data Centre) 5 MW
  • Client: - BSNL Work Scope: - S.I.T.C Mechanical &Electrical
  • Work- Value: - 2700 Cr
  • Key Responsibilities:
  • Testing and commissioning of various mechanical systems
  • Coordination with MEP vendors and central team
  • Project planning and progress tracking
  • Liaison with BSNL and Army representatives
  • Technical Expertise:
  • Chiller testing and commissioning
  • CHWP testing
  • PAHU, TFA, and buffer tank operations
  • Ducting leak tests
  • Primary and secondary pump testing
  • DG exhaust systems
  • VRF systems (IDU & ODU)
  • AutoCAD proficiency
  • Project Management:
  • Vendor coordination (Siemens and IBM)
  • Weekly progress meetings with vendors
  • Regular project plan reviews
  • Drawing approval coordination with central team
  • Weekly meetings with BSNL and Army stakeholders

MEP Senior Engineer

VAYNTECH Pvt. Ltd
01.2020 - 01.2022
  • Project: - Camellias, Aralias& Rasistoflex
  • Work Scope: S.I.T.C of Mechanical, Plumbing & Firefighting Work
  • Key Responsibilities
  • Skills:
  • HVAC Systems:
  • Heat load calculation
  • Design and planning of HVAC systems
  • Oversaw installation and commissioning of VRV systems (IDU and ODU)
  • Conducted site visits for quality assurance
  • Performed testing of refrigerant pipe installations
  • Managed ducting checkpoints, including
  • Airflow supply and return rates
  • Refrigerant pressure (high and low side)
  • Refrigerant flow rate &Leak detection
  • Plumbing Systems:
  • Supervised laying and fixing of CPVC & UPVC pipes for water supply and drainage
  • Oversaw installation of sanitary fixtures
  • Managed water tank installations at terrace level
  • Firefighting Systems:
  • Directed installation and fixing of MS pipelines
  • Supervised installation of hose reels and fire pumps
  • Project Management:
  • Coordinated with contractors to ensure adherence to project timelines and budgets
  • Managed documentation and reporting processes
  • Utilized AutoCAD for design and planning purposes
  • Conducted measurements of executed MEP quantities
  • Handled billing for company and sub-contractors
  • Liaised with clients and contractors

Project Engineer

Fawaz Al- Umrani Contracting
02.2018 - 01.2020
  • S.I.T.C. of Mechanical Works
  • Key skills: - HVAC Systems:
  • Installation and commissioning of chillers, CHWP, primary and secondary pumps
  • Implementation of PAHU and TFA systems
  • Ductwork installation adhering to SMACNA standards
  • Grills installation and balancing
  • Fire Protection:
  • Oversaw installation of MS pipelines for firefighting systems
  • Supervised fixing of hose reels and fire pumps
  • Project Management:
  • Ensured timely completion of all MEP engineering tasks
  • Coordinated with clients and contractors
  • Managed material requirements based on shop drawings and site conditions
  • Implemented ASHRAE standards for HVAC systems
  • Identified and executed extra items on-site
  • Quality Control:
  • Ensured compliance with local building codes and regulations

Contact Private Limited
08.2015 - 01.2018
  • (Commercial and Residential)
  • HVAC & Electrical works
  • Key skills: -
  • Designed and installed both ducted and ductless systems
  • Equipment selection including chillers and air handlers
  • Ductwork and piping design
  • Ventilation and exhaust systems installation
  • Project Management:
  • Handled billing for company and sub-contractors
  • Coordinated with clients and contractors
  • Managed material requirements based on shop drawings and site conditions
  • Identified and executed extra items on-site
  • Technical Expertise:
  • Proficient in HVAC system design and installation
  • Knowledgeable in electrical systems for commercial and residential projects

Education

B. E. - Mechanical Engineering

RGPV University
MP
04.2014

12th - undefined

BSEB
Patna
02.2009

10th - undefined

Bihar Board
Patna
03.2007

Skills

MEP QAQC and execution engineering

Project management

Quality assurance

Sample room design

issue detection and resolution

Cross-departmental leadership

Process optimization

AutoCAD design

mechanical assembly

Document management

Test and commission

Chiller systems design

Data analysis

Data analysis

Full stack web

RTU systems

TFA certification

Fire protection systems

HSD & DG systems

Personal Information

  • Passport Number: N8850051
  • Passport Date Of Issue: 2016-04-03
  • Passport Place Of Issue: Patna
  • Passport Expiry Date: 2026-04-03
  • Date of Birth: 10/05/1992
  • Nationality: Indian
  • Marital Status: Married
  • ID Type: Passport
  • ID Number: N8850051

Training

  • 4 weeks, BHEL Bhopal
  • 6 weeks, Rail Wheel Plant Bela

Timeline

Project Lead QA/QC

Jones Lang LaSalle, JLL
04.2023 - 12.2025

Mechanical Site Engineer

L&T Technology Services
02.2022 - 04.2023

MEP Senior Engineer

VAYNTECH Pvt. Ltd
01.2020 - 01.2022

Project Engineer

Fawaz Al- Umrani Contracting
02.2018 - 01.2020

Contact Private Limited
08.2015 - 01.2018

12th - undefined

BSEB

10th - undefined

Bihar Board

B. E. - Mechanical Engineering

RGPV University
MEHDI HUSSAINQAQC Manager