2006–2008 Process Operator
- Operated equipment to ensure safe and efficient production processes.
- Monitored systems for optimal performance and safety compliance.
2008–2011 Chief Process Operator
- Coordinated daily operations to ensure timely project delivery.
- Mentored junior staff on best practices and workflows.
- Coordinated maintenance schedules for equipment and facility upkeep.
2011–2013 Operations Team Lead for Sulfur Recovery Complex Modernization Project (WRMP).
- Developed maintenance schedules for equipment and facility upkeep.
- Implemented safety protocols in all maintenance activities.
- Reviewed completed work orders to verify that tasks had been performed correctly and in accordance with safety regulations.
- Supervised off-site quality control operations for Flour Engineering Design Team in South Carolina.
- Planned and coordinated over 250-unit piping module insulations.
- Operations authority for complex lift management in high-risk environments
- Designed effective lockout/tagout measures to maintain safe work environments.
- Executed successful launch of $1.3 billion Modernization project
2013–2015, Operation Team Lead for the Sulfur Recovery Unit Revamp Project.
- Developed and maintained planning documentation for operational processes.
- Conducted regular safety training sessions for staff on hazardous material protocols.
- Utilized specialized equipment to ensure effective containment and cleanup of hazardous materials.
- Developed Unit Startup/Shutdown Procedures
- Worked with Engineering to revamp legacy Sulfur Recovery Unit systems
- Successful Shutdown/Startup of 9 Sulfur Recovery Units.
2015-2019 Chief Operator
- Managed daily operations and ensured adherence to company policies.
- Oversaw scheduling and resource allocation for staff and equipment.
- Lead Fall Turnaround Cluster for Unit Shutdown and Startup.
2019–Present, Operations Team Lead, Special Project Tank Outages.
- Developed prototypes and conducted testing to validate the design concepts and functionality of sulfur truck loading arms.
- Developed prototypes and conducted testing to validate the design concepts and functionality of Rich Amine Sample Stations.
- Developed and tested prototypes of mechanical components utilizing CAD software for wash spools.
- Worked successfully to plan 22 tank outages in a 6-month time period on high H2S streams.
- Developed uniform training manuals for wash procedures, promoting consistent execution and adherence to compliance standards.