Summary
Overview
Work History
Education
Skills
Recognitionandawards
Proficiency
Timeline
Generic

Minark P Patel

Bharuch

Summary

Adept at driving large-scale projects to successful completion, my tenure at Reliance Industries Ltd-DMD showcased my ability to lead complex petrochemical capex initiatives, blending technical competence with strong organizational skills. Expert in engineering specifications and maintenance coordination, I excel in optimizing resource utilization and achieving operational excellence.

Overview

10
10
years of professional experience

Work History

Assistant General Manager

Reliance Industries Ltd-DMD
Dahej
04.2015 - Current

1. Project Management

  • Coordinated MOC efforts, leading to reliable improvements in plant design.
  • Involved in feasibility study, design basis preparation, basic engineering, cost estimation, detailed engineering, model review, material procurement, and Hazop studies in various capex projects.
  • Prepared cost estimates for projects of varying sizes.
  • Contributed to HAZOP and HAZID analyses.
  • Developed and monitored schedules for capex projects.
  • Ensured all deliverables were obtained promptly through coordination with Engineering consultants and MEC.
  • Ensured timely material acquisition through consistent follow-ups.
  • Developed and reviewed the SOW (Scope of Work) for major jobs and new installations.
  • Managed capital expenditure projects within a functioning plant, fostering stakeholder collaboration.
  • Facilitated progress reviews of capex during meetings with concerned personnel.
  • Prepared comprehensive review documents tracking project advancement and resource management.
  • Fostered a performance-oriented environment focused on promoting team collaboration, personal accountability, and long-term business success.
  • Developed and maintained relationships with suppliers, vendors, and community partners.
  • Led meetings with internal team members, consultants, and contractors.
  • Managed multiple projects with competing deadlines simultaneously.
  • Coordinated resources across multiple departments and teams as needed for successful completion of projects.
  • Made changes to project scope and cost and implemented the most effective change management processes to keep projects up-to-date.
  • Played a key role in execution of projects.

2. Shutdown/Turnaround Management

  • Involved in the major shutdown from the very initial stage to perform basic engineering of the job, prepare the BOQ, resource estimation, scope of work, and DOR, along with offer evaluation of the vendor and timeline preparation for the job execution during the shutdown period.
  • Gained proficiency in executing pipeline jobs for the Hydro-Carbon petroleum sector with D&M division.
  • Participated in preparing work permits and HITRA for brown field area's maintenance with risk assessments ensuring zero defect policies.
  • Scheduled resources such as manpower, tools, and supplies required for the successful completion of planned maintenance tasks within the given timeframe.
  • Executed heavy lifting tasks involving columns, heat exchangers, chillers, and pumps in ongoing plant operations and shutdown periods.
  • Monitored progress of activities during the shutdown process.
  • Coordinated with other departments to ensure compliance with regulations during shutdowns.
  • Monitored progress by establishing plans, budgets, and measuring results.
  • Used strong issue resolution and communication skills to cultivate and strengthen lasting client relationships.

Trainee Engineer

Sterling Auxiliaries Pvt. Ltd.
Dahej
09.2014 - 03.2015
  • Routine with plant preventive maintenance of static and rotating equipment.
  • Hands-on practice for overhauling maintenance of gearboxes and pumps.
  • Planning and scheduling for resource allocation, like man and material.
  • Prepare the P.M. chart and implement it for air compressors, chillers, and Thermo Pac (hot oil).
  • Regular maintenance and yearly maintenance of a 12-ton coal-fired boiler and an 8-ton F.O. boiler.
  • Preparing documentation and reports for daily work reports, inventory reports, breakdown reports, and preventive maintenance checklist.

Education

B.E - Mechanical Engineering

S.V.M. Institute Of Technology
Gujarat
01.2014

XII -

Narayan Vidhyalaya Bharuch
Bharuch, Gujarat
01.2010

X -

Shree K.R.Patel Vidhyamandir
Gujarat
01.2008

Skills

  • Technical competence
  • Engineering Specification
  • Mechanical Engineering Problem Solving
  • Engineering Drawings Interpretation
  • Schematic diagrams
  • Assembly and Dismantling Drawings
  • Resource Utilization
  • Troubleshooting
  • Organizational Skills
  • Analytical Skills
  • Maintenance Practices
  • SAP PM Module
  • MMCS
  • Report Generation
  • REIMS
  • Piping Fabrication
  • Erection
  • Testing
  • Commissioning
  • Equipment Erection
  • Installation
  • Procurement Handling
  • Maintenance Coordination
  • Planned Shut Down Execution

Recognitionandawards

  • Exemplary award for Erection and commission of DOW purification column first time in any PET plant.
  • Exemplary award for installation and commission of three pump with cross country pipe line of 2.5Km for DM water at crisis time in time limit of 8 days.
  • Exemplary award for Modification of existing unloading gantry from Acetic acid to PX, for unloading of PX by tanker to avoid plant shut down.
  • As a Project manager, handled EO to sterling line project in which EO is transferred by pipe line from one company to other company first time in INDIA.
  • Got Recognized for the replacement of HCL column in VCM plant in a very short time frame of 8 Days.

Proficiency

  • Technically competent & fully conversant with engineering specification for piping & equipment to handle from erection, commissioning to maintenance. With capability to resolve complex mechanical engineering problems.
  • Conversant with study of engineering drawings, schematic diagrams, assembly & dismantling drawing.
  • Excellent track record in projects with maximum resource utilization.
  • Acknowledged trouble-shooter.
  • Innovative and well organized in work habits, with advanced analytical skills to achieve maintenance in brown field 100% safe practice.
  • Well versed with SAP PM Module (P10 & RP2).
  • Well versed with MMCS (Material Master Control System).
  • Generation of soft reports as per site requirements.
  • Knowledge of REIMS (Reliance Enterprise Information Management System)

Timeline

Assistant General Manager

Reliance Industries Ltd-DMD
04.2015 - Current

Trainee Engineer

Sterling Auxiliaries Pvt. Ltd.
09.2014 - 03.2015

B.E - Mechanical Engineering

S.V.M. Institute Of Technology

XII -

Narayan Vidhyalaya Bharuch

X -

Shree K.R.Patel Vidhyamandir
Minark P Patel