Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.
Overview
2025
2025
years of professional experience
1
1
Certification
Work History
CPP Operator
Geumhwa WTS (Barakah Nuclear Power Plant)
Abu Dhabi
02.2024 - Current
Operate and monitor condensate polishing systems, ensuring optimal performance and efficiency
Prepare facility status reports especially operational concerns
Perform quality control tests on treated water to ensure compliance with regulatory standards
Maintain accurate records of operations, maintenance activities, and safety inspections.
Collaborate with the maintenance team to implement preventive maintenance schedules.
Performed routine maintenance on equipment to ensure optimal performance.
Maintained cleanliness of work area and equipment in accordance with safety regulations.
Conducted regular inspections of machinery to identify any potential issues or malfunctions.
Trained new employees on proper use of equipment, safety protocols, and company policies related to production processes.
Ensured compliance with safety regulations during all meetings and events.
Developed and implemented safety policies and procedures to ensure compliance with federal regulations.
Conducted regular safety meetings, orientations and training sessions for employees.
Coordinated the development of emergency response plans for hazardous materials incidents.
Assisted in the coordination of meetings, including scheduling meeting times, reserving conference rooms, and preparing agendas.
Prepared and distributed meeting minutes to attendees after each meeting.
Maintained records of attendance and contact information for participants.
Maintained records of completed work orders including details such as labor hours, materials used, and services rendered.
Provided technical support to customers concerning installation and repair activities related to their equipment.
Conducted inspections of customer sites to verify compliance with safety regulations and quality standards.
Assisted with training new employees on proper use of tools and equipment related to work order assignments.
Reviewed all incoming requests for emergency repairs or maintenance activities according to established protocols.
Adhered strictly to company guidelines when processing paperwork associated with each work order.
Prepared and planned worksites to help jobs run smoothly.
Filled out work orders, repair logs and maintenance plans to document work completed.
MEP Engineer
Suroj Buildcon Pvt Ltd
Pune
01.2017 - 06.2021
Design and oversee the installation of MEP systems for various projects, ensuring compliance with local codes and industry standards
Conduct load calculations and system sizing for HVAC, electrical, and plumbing systems
Collaborate with architects and contractors to integrate MEP systems into overall project design.
Analyzed the existing building system and provided solutions to improve efficiency.
Reviewed and approved subcontractor documentation related to MEP works.
Conducted site visits to inspect the progress of MEP works.
Prepared detailed design calculations, drawings and technical specifications for HVAC systems.
Coordinated with other disciplines such as Structural, Architectural and Electrical teams for successful completion of projects.
Provided technical advice on installation of mechanical components in accordance with industry standards.
Created 3D models of MEP systems using AutoCAD software.
Carried out detailed testing, commissioning and troubleshooting of electrical equipment's installed at site.
Assisted in preparation of project budget estimates from conceptual stage till completion phase.
Attended meetings with clients, architects and contractors regarding MEP related issues.
Resolved conflicts between different engineering teams during the design process.
Ensured compliance with safety regulations while executing projects.
Supervised day-to-day activities of junior engineers assigned to specific tasks.
Developed strategies to reduce energy consumption by utilizing latest technologies.
Monitored adherence to quality control measures throughout all stages of the project.
Identified potential risks associated with MEP systems and proposed suitable mitigation plans.
Designed fire protection systems as per local codes and regulations.
Verified accuracy and completeness of documents submitted by subcontractors before final approval.
Lead and organized team of contractors, subcontractors and representatives to efficiently install systems.
Explained and outlined difficult installation requirements to allow for adequate time and preparation.
Reviewed, evaluated and negotiated change orders with respect to financial status of team subcontractors.
Facilitated update meetings to set schedule and project timelines for entire team
Created, implemented and executed quality control plan to standardize project development.
Developed lists of components, materials and systems needed to establish budgetary requirements.
Secured state, local and federal agency documentation and temporary certificates for system operation.
Delegated work to staff, setting priorities and goals.
Trained and monitored employees to teach daily tasks and improve performance.
Reported project progress, site problems and labor status to supervisors.
Determined schedules, sequences and assignments for work activities, based on priority, quantity of equipment and personnel skill.
Created work crew schedules and delegated assignments.
Kept records of parts and equipment used in projects to update inventory.
Communicated with distributors to acquire necessary equipment for projects.
General Maintenance Engineer
Damocloids Marine Service
Dubai
11.2014 - 05.2016
Collaborate with cross-functional teams to develop and execute preventive maintenance programs.
Dismantled machines, equipment, or devices to access and remove defective parts.
Cleaned or lubricated shafts, bearings or other parts of machinery.
Installed equipment to improve energy or operational efficiency of residential or commercial buildings.
Performed preventive and corrective maintenance on a variety of equipment, such as pumps, motors, conveyors, and valves.
Maintained records of scheduled maintenance activities.
Ensured compliance with safety regulations during all maintenance operations.
Monitored and adjusted systems to ensure optimal performance levels.
Diagnosed mechanical problems and identified appropriate solutions.
Repaired malfunctioning components using hand tools, power tools, and other specialized equipment.
Conducted regular inspections of facility machinery for signs of wear or damage.
Replaced worn parts or components in accordance with manufacturer specifications.
Assisted in the installation of new equipment according to design specifications.
Provided technical support to other team members when needed.
Developed detailed reports on equipment malfunctions or repairs performed.
Carried out routine lubrication tasks to reduce friction between moving parts.
Followed established procedures for ordering replacement parts and supplies.
Responded quickly to emergency breakdowns in order to minimize disruption of production.
Troubleshot electrical systems using digital multimeters and other testing instruments.
Calibrated sensors used in various industrial processes as required.
Reviewed blueprints, schematics, drawings, technical manuals., for troubleshooting purposes.
Created preventative maintenance schedules for all relevant machinery.
Assessed the need for spare parts inventory and placed orders accordingly.
Maintained equipment performance by cleaning and lubricating components.
Efficiently executed shut downs for planned maintenance.
Diagnosed and repaired mechanical issues according to industry standards.
Inspected generators and backup generators for working conditions to prepare for power outage emergencies.
Assembled and maintained physical structures with hand and power tools.
Implemented troubleshooting techniques to resolve issue.
Repaired machines, equipment or structures using tools or equipment.
Senior Research Analyst
Arcgate
Udaipur
Developed detailed reports and presentations for stakeholders outlining findings from qualitative and quantitative analysis.
Collaborated with cross-functional teams to ensure successful implementation of research initiatives.
Generated ad hoc reports for senior executives summarizing the results of various studies conducted by the team.
Identified areas of improvement within existing processes by conducting a thorough review of current practices.
Assessed the impact of new products or services on customer loyalty by analyzing customer segmentation data.
Maintained up-to-date knowledge of best practices related to research methodology and analytics techniques.
Used findings from research and data to make recommendations for business.
Prepared regulatory documentation and presentations and highlighted findings to support project leads.
Identified and resolved data issues to drive accuracy and integrity.