Summary
Overview
Work History
Education
Skills
OVERVIEW
Certification
Timeline
Generic

M.K. Sethu

Summary

Professional Achievements

Overseas Experience

  • Served with US-based consultants Metcalf & Eddy International in the Kingdom of Saudi Arabia, contributing to the execution of major integrated infrastructure projects. Played a key role in stormwater drainage systems for Dammam City, working with Saudi Aramco and the Water & Sewer Directorate (KSA).

India Experience

  • On deputation from TWAD Board (1975), worked with WHO / UNDP, Madras Metropolitan Water Supply & Sewerage Board, Engineering Science Inc. (USA), and Shah Technical Consultants (India) to prepare the Master Plan for Madras City, forecasting water supply, sewerage, and treatment requirements up to the year 2001, nearly 25 years in advance.
  • As Resident Representative – Creative Environmental Consultants, managed and executed four Common Effluent Treatment Plants (CETPs) at Tirupur, with a total project value of ₹220 Crores. The Veerapandi CETP, one of the largest in Asia, treats 12 MLD of chemical effluent.
    Chaired weekly progress review meetings with contractors including BGR (formerly GEA) and ENKEM Engineers Pvt. Ltd.
    Coordinated with private and government agencies on environmental compliance matters.
    Conducted two official inspections at the HDPE pipe manufacturing facility in Thailand to ensure quality compliance prior to shipment.
  • Served as Consultant to Aqua Tecon, Trichy, involved in construction works for the 90 MW BHEL Power Project at Valuthur, Ramanathapuram District.
  • As General Manager (Technical) – LMS Builders, executed TAJSATS and LSG Sky Chefs air catering facilities at the New International Airport, Devanahalli, Bengaluru, and led construction of 32 high-end villas at Peelamedu, Coimbatore for Shriram Properties.
  • As AGM (Projects) – Vishwa Infrastructures, led execution of a 60 MLD Sewage Treatment Plant valued at ₹60 Crores at Perungudi, Chennai, comprising 28 major civil structures, reporting directly to MD, ED, and senior government officials of Metro Water.
  • Employed by Creative Environmental Consultants (CEC), Chennai, and approved as Project Coordinator by L&T, managed water supply, sewerage, firefighting systems, STP, sewage pumping stations, underground sumps, and pump houses for L&T Shipbuilding, Kattupalli.
    Conducted daily toolbox talks, weekly coordination meetings with agencies such as Kirloskar and Tyco, and participated in L&T’s weekly integration meetings to ensure seamless execution.
  • As Team Leader – STUP Consultants, managed Phase-I construction of the ₹120 Crore Mahindra Holidays Resort at Virajpet, Coorg.
  • As GM (Projects) – SAPL, led construction of 10–17 storey high-rise residential buildings and executed external infrastructure works for DELL SEZ, Coimbatore. Coordinated with consultants such as JLL and FABS, and worked closely with leading developers including Akshaya, Lancor, Alaka Palazzo, and S&S Group.
  • Served as Client Representative for Sankar & Associates, successfully completing and handing over eight major institutional, hospital, and commercial projects.
  • As General Manager – MAK India Limited, played a key role in designing and establishing an automated bio-septic tank manufacturing facility, along with execution of multipurpose halls, cow sheds, inoculum tanks (1-lakh & 3-lakh litre capacities), and supporting infrastructure.
  • Most recently, as General Manager – Aadhya Overseas, managed execution of Water Treatment Facilities in Sierra Leone, West Africa, coordinating with government departments, engineers, and international logistics partners.
  • Specialized in delivering complex infrastructure, water, wastewater, and building projects cost-effectively, within stipulated timelines, and in compliance with technical, environmental, and regulatory standards.
Core Strengths

Specialized in delivering complex infrastructure, water, wastewater, and building projects cost-effectively, within stipulated timelines, and in compliance with technical, environmental, and regulatory standards.

Overview

50
50
years of professional experience
1
1
Certification

Work History

General Manager

Aadhya Overseas
01.2023 - 07.2024
  • Managed Water Treatment Plant projects for Kambia and Pujehun Towns, Sierra Leone.
  • Coordinated with process design engineers, government officials, and Water & Sewer Directorate engineers to appraise project progress and ensure compliance.
  • Conducted meetings with the Public Health Minister and other stakeholders to report on ongoing project status.
  • Oversaw procurement and shipment of critical equipment, including 14 panel boards and DI, CI, HDPE pipes, ensuring timely delivery from Tuticorin to Freetown Port.

General Manager

MAK India Limited
05.2021 - 05.2022
  • Managed all civil engineering works and played a key role in establishing the automated production of Bio-Digester Tanks, ensuring process efficiency and quality standards.

Salary: Rs. 8,41,752 per annum.

Reason for Leaving: Limited civil projects at the current company; sought more challenging civil engineering opportunities.

Projects Coordinator

Sankar & Associates Pvt Ltd
10.2016 - 04.2020
  • Managed and executed large institutional, hospital, and commercial projects.
  • Key projects included KMCH Medical College, Sree Saraswathi Thyagaraja College, Joy Alukkas Jewellery Showroom, Hindusthan Hospitals, Maple Tower, and Spotlight.
  • Oversaw the full project lifecycle: planning, execution, site supervision, contractor coordination, and quality control.
  • Collaborated with architects, engineers, and stakeholders to maintain design integrity, regulatory compliance, and client satisfaction.
  • Ensured timely delivery of projects while adhering to technical and safety standards.

Salary: Rs. 1,25,000 per month.
Reason for Leaving: Transitioned to pursue better professional opportunities.

General Manager – Technical

Anish Infrastructures
08.2013 - 10.2016
  • Managed hospitals, colleges, residential, and industrial infrastructure projects, overseeing the full project lifecycle from planning and design coordination to site supervision, contractor management, and quality control. Ensured timely delivery, compliance with technical and safety standards, and alignment with client expectations.

Salary: Rs. 55,000 per month.

Reason for Leaving: Transitioned to pursue better professional opportunities.

General Manager- Projects

SAPL
07.2012 - 01.2013

Managed high-rise residential and Dell SEZ infrastructure projects, overseeing end-to-end project execution. Responsibilities included project planning, scheduling, contractor supervision, quality assurance, and stakeholder coordination to ensure completion on time, within budget, and according to design specifications.

Salary: Rs. 1,37,500 per month.
Reason for Leaving: Successfully completed the projects.

Team Lead

STUP Consultants Pvt Ltd
01.2011 - 12.2012
  • Led a team of 11 supervisory engineers across civil, electrical, mechanical, plumbing, and quality control disciplines.
  • Coordinated with design, architectural, and structural consultants (STUP, Mumbai) to finalize ‘Good for Construction’ drawings and review shop drawings.
  • Managed multiple contractors, including NUTECH Constructions, A.J. Associates, Phoenix Infrastructures & Projects, GR Tech, ensuring timely execution and resolving quality issues.
  • Conducted weekly progress review meetings with vendors, recommended and authorized payment bills, and ensured projects met quality and schedule targets.
  • Represented STUP in a one-to-one discussion with Mr. Horgnies, Head of Societe du Canal de Provence, in Colombo, Sri Lanka (6th Dec 2011).
  • Successfully handed over the project to the client within the stipulated timeline.

Salary: Rs. 1,37,500 per month.

Reason for Leaving: Project completed successfully.

Project Coordinator (Infrastructure Services)

L&T SHIPBUILDING LIMITED
09.2011 - 01.2012

Employed by Creative Environmental Consultants (CEC), Chennai and appointed as Project Coordinator by L&T Shipbuilding, Kattuppalli – Chennai. Oversaw construction and project management for water supply, sewerage, and firefighting systems, including:

  • Sewage Treatment Plant (STP) and sewage pumping stations
  • Fresh water underground sump and overhead tanks
  • Firefighting sump and pump house

Responsibilities included project planning, site supervision, contractor coordination, and ensuring adherence to quality, safety, and technical standards.

Salary: Rs. 1,25,000 per month.

Reason for Leaving: Completed the project successfully.

Assistant General Manager (Projects)

Vishwa Infrastructures and Services Pvt Ltd
06.2009 - 01.2010

Managed end-to-end construction and project execution for major water infrastructure projects, including primary and secondary clarifiers, sludge thickener, balancing tanks, chlorine contact tank, and aeration tanks.

Key Responsibilities & Achievements:

  • Finalized and awarded pile contracts, successfully completing 818 piles with depths ranging from 30 to 40 feet.
  • Reviewed tenders and shop drawings, and issued working drawings for seven major water-retaining structures.
  • Supervised construction of major tanks:
    Chlorine Contact Tank: 23.10 m × 17.36 m × 3.70 m
    Balancing Tank: 44.50 m × 36.00 m × 4.70 m
    Aeration Tank: 55.60 m × 43.00 m × 6.00 m
  • Attended monthly review meetings chaired by Managing Director & Engineering Director of Chennai Metro Water.
  • Coordinated with government bodies, Anna University, and consultants for design approvals and project compliance.
  • Recruited and managed engineering support personnel, defined scopes of work, employed subcontractors, and conducted staff appraisals.
  • Prepared specifications for electro-mechanical and instrumentation systems per CMWSSB Project Manuals.
  • Floated tenders and managed procurement with vendors such as POWERICA, PICO PURO, HILLER DECANTER, JASH, BARON POWER, AMAZON, KAIZEN, ALMECH, securing supplies for penstocks, centrifuges, motors & pumps, VFD drives, 1250 KVA generators, blowers, diffusers, and panel boards.
  • Conducted regular progress review meetings with consultants and company leadership to ensure timely, quality, and compliant project delivery.

Salary: ₹1,25,000 per month.

Reason for Leaving: Transitioned to pursue better professional opportunities and work environment.

General Manager (Technical)

LMS Builders & Engineers Private Limited
04.2008 - 05.2009

Served as General Manager (Technical) overseeing three major projects with a total value of Rs. 71 Cr, including TAJSATS Air Catering Unit (New International Airport), 32 Hi-Tech Villas, and Chinmaya Elementary School with AC Auditorium.

  • Recruited and managed engineering personnel across disciplines and specified scopes for multiple subcontractors and vendors.
  • Coordinated with vendors including Voltas, Thermax, KONE Elevators, Hydranautics, Aim Electrical Controls, and more for civil, mechanical, electrical, and automation works.
  • Oversaw project planning, site execution, contractor supervision, and quality control, ensuring timely completion and adherence to technical and safety standards.
  • Commissioned critical systems for TAJSATS, including sewage and wastewater treatment, water treatment, fire detection & alarm, CCTV, access control, lifts, automated gates, AC & chiller units, boilers, and pipelines.
  • Conducted periodical review meetings with project architects, consultants, client GM/CE, Airport Authority, and Pollution Control Board to appraise progress and ensure compliance.
  • Managed construction of 32 hi-tech villas and school infrastructure, finalizing subcontractors, monitoring progress, and ensuring smooth handover to clients.

Key Achievements:

  • Successfully commissioned and handed over the TAJSATS facility to the client, meeting all technical and safety requirements.
  • Delivered high-quality construction and project management across residential, institutional, and airport infrastructure projects within budget and timelines.

Salary: Rs. 1,00,000 per month.

Reason for Leaving: Completed the projects successfully.

Resident Representative

Creative Environmental Consultants
12.2005 - 04.2008

1. Construction & Project Management – 4 CETPs, Tirupur

  • Managed project supervision for four Zero Liquid Discharge (ZLD) CETPs in Tirupur, totaling ₹220 crore. One CETP commissioned for pre-RO operations; remaining RO plants pending thermal evaporator completion.
  • Appointed and coordinated with main contractors: GEA (now BGR), NUCHEM WEIR INDIA LTD, ENKEM ENGINEERS PVT. LTD.
  • Approved subcontractors for civil works: M.R. Constructions and Periyar Techno Constructions.
  • Conducted site inspections and quality testing, including visits to HDPE manufacturing facilities in Thailand before pipe shipment.
  • Regularly updated and appraised project progress to Chairman and MD of all four CETPs.
  • Liaised with PCB and city municipality officials to ensure regulatory compliance and smooth project execution.

2. Project Study – NIT Trichy Sewage Treatment Facility

  • Conducted field survey and study of the existing STP at NIT Trichy campus.
  • Participated in joint meetings with CEC Head, Expert Mr. Harsha, NIT Director, Prof. & Head of Civil Engineering Dept., and Dr. Ramesh (Environmental Dept.).
  • Presented project proposal and recommendations for upgrading the existing STP infrastructure.

Salary: Rs. 1,00,000 per month.

Reason for Leaving: Completed the projects successfully.

Engineering Consultant

Aqua Tecon
09.2000 - 12.2005
  • Handled construction activities across multiple projects, including office and storage sheds for BHEL Perungulam 95 MW, Ramanad, residential and institutional projects such as Mohammed Sathak Engineering College, shopping complex with lodging facilities, a cluster of six houses at Kilakkarai, and numerous residential buildings in and around Trichy. Responsibilities included site supervision, contractor coordination, and ensuring timely and quality execution.
  • Salary: As per consultation
  • Reason for Leaving: Transitioned to pursue broader professional opportunities and career growth.

Resident Project Engineer

Jausa Contracting Maldives Pvt. Ltd.
06.1998 - 12.1999
  • Led the construction of a 5-storey barracks facility for the National Security department in the Maldives, overseeing site execution, contractor coordination, quality control, and timely project delivery.
  • Salary: Rs. 55,000 per month.
  • Reason for Leaving: Transitioned to pursue broader professional opportunities and better career prospects.

Project Consultant

IMPREGLIO SPA
01.1998 - 06.1998
  • Short-term consultancy focused on enhancing construction supervision methods for water, sewerage, and stormwater drainage projects.
  • Salary: Rs. 70,000 per month.
  • Reason for Leaving: Completion of the short-term assignment.

Engineering Consultant

Self Employed
09.1990 - 12.1997
  • Provided civil engineering consultancy services for housing and industrial projects for both private clients and government agencies in and around Tiruchirappalli. Responsibilities included planning, design coordination, construction supervision, and technical advisory support.
  • Salary: Varied; annual earnings approximately ₹6,00,000
  • Reason for Leaving: Transitioned to pursue broader professional opportunities and higher-value project engagements.

Resident Project Engineer

Metcalf & Eddy Intl.
09.1980 - 08.1990

Served as Project Engineer in the Middle East for over 11 years, representing the internationally renowned US project management firm Metcalf & Eddy and its associate companies, delivering major water supply, sewerage, stormwater drainage, and sewage treatment projects.

Key Responsibilities & Experience:

  • Led construction supervision of water supply pipelines (32 mm to 1200 mm dia.) using Series 5 PVC, SAS 14 PVC, and cement-lined ductile iron pipes over 75+ km.
  • Supervised sewer networks (150 mm to 2200 mm dia.) using HSVCP, FRP, and FRPP materials, including pressure manholes, a then-new concept successfully implemented.
  • Oversaw construction of pumping stations (10–100 HP) and an Activated Sludge Sewage Treatment Plant designed for a population of 0.42 million with per capita water supply of ~450 LPD.
  • Managed large, multi-contractor infrastructure projects with stringent quality, safety, and performance requirements.

Major Projects Executed:

  • Dammam City Storm Water Piped Drainage Project – USD 82 Million (1982)
  • Kafji Water Distribution System – USD 40 Million (1984)
  • Dammam City NE & SW Water Supply & Sewerage Project – USD 25 Million (1987)
  • Eight Integrated Water & Sewerage Infrastructure Projects – USD 320 Million (1989)

Project Monitoring & Technology:

  • Implemented computerized project monitoring systems to analyze lead times, lag times, rolled-up tasks, and task dependencies for effective decision-making.
  • Utilized precision digital theodolites, distance-measuring instruments, and digital plotting techniques, integrating site data with portable computers.
  • Enabled paperless project execution, electronic data exchange between project engineers and contractors, and real-time progress reporting with high accuracy.

Project Management Expertise:

  • Acquired advanced project management skills using computerized tools for risk simulation, delay forecasting, and performance visualization, a hallmark methodology of Metcalf & Eddy.

Salary: 5,500 SAR per month.

Reason for Leaving: Opted to discontinue the overseas assignment due to geopolitical conditions during the Gulf War.

Project Manager

Al Ghaleb & Al Nafal
09.1979 - 08.1980
  • Managed the construction of nine high-tech residential dwellings in Riyadh, Saudi Arabia, overseeing site execution, quality control, and contractor coordination.
  • Salary: 4,000 SAR per month.
  • Reason for Leaving: Moved on to pursue better professional growth and long-term career prospects.

Assistant Engineer

Madras Metropolitan Water Supply & Sewerage Board
05.1975 - 09.1979
  • On deputation from the TWAD Board, worked with WHO/UNDP experts and M/s Engineering Science to prepare the Master Plan for the Madras City Water Supply and Sewerage Board, including forecasting infrastructure requirements up to the year 2001.
  • Reason for Leaving: Pursued an overseas opportunity in the Middle East (Gulf region).

Assistant Engineer

Tamilnadu Water Supply and Drainage Board
06.1974 - 05.1975
  • Executed construction of office and residential buildings, pump houses, control rooms, overhead water tanks, and water mains for drought-relief schemes. Involved in road formation works, culverts, causeways, small bridges, and extensive surveying and leveling activities.
  • Reason for Leaving: Deputed to the WHO / UNDP–supported Chennai Metropolitan Water Supply & Sewerage Master Planning Project.

Education

BE - Civil Engineering

PSG College of Technology
India

Skills

  • Civil Engineering Project Management
  • Water Supply & Sewerage Systems
  • Sewage Treatment Plants (STP) & CETP Projects
  • Water Treatment Plants (WTP)
  • Stormwater Drainage & Pipelines (DI, CI, HDPE, PVC)
  • High-Rise & Residential Building Construction
  • Institutional & Commercial Project Execution
  • Zero Liquid Discharge (ZLD) Projects
  • Contractor & Vendor Management
  • Multi-Disciplinary Team Leadership
  • Project Planning, Scheduling & Monitoring
  • Construction Supervision & Quality Control
  • Government & Regulatory Liaison
  • Cost Estimation & Budget Control
  • Electro-Mechanical & Instrumentation Coordination
  • Tendering & Procurement Management
  • Stakeholder Coordination & Client Management
  • Health, Safety & Environmental Compliance
  • International Project Management (Middle East & Africa)
  • AutoCAD & Technical Drawing Review
  • Paperless Project Monitoring & Digital Documentation

OVERVIEW

  • M.K. Sethu, BE, FIE, FIWWA Chartered Engineer (Civil)
  • Cell: +919500150464

Certification

  • Chartered Engineer: Institution of Engineers, India. (M 110085|2: Year 1995)
  • Fellow: Institution of Engineers, India. (F 104203|5: Year 1996)
  • Life Fellow: Indian Water Works Association: 1996

Timeline

General Manager

Aadhya Overseas
01.2023 - 07.2024

General Manager

MAK India Limited
05.2021 - 05.2022

Projects Coordinator

Sankar & Associates Pvt Ltd
10.2016 - 04.2020

General Manager – Technical

Anish Infrastructures
08.2013 - 10.2016

General Manager- Projects

SAPL
07.2012 - 01.2013

Project Coordinator (Infrastructure Services)

L&T SHIPBUILDING LIMITED
09.2011 - 01.2012

Team Lead

STUP Consultants Pvt Ltd
01.2011 - 12.2012

Assistant General Manager (Projects)

Vishwa Infrastructures and Services Pvt Ltd
06.2009 - 01.2010

General Manager (Technical)

LMS Builders & Engineers Private Limited
04.2008 - 05.2009

Resident Representative

Creative Environmental Consultants
12.2005 - 04.2008

Engineering Consultant

Aqua Tecon
09.2000 - 12.2005

Resident Project Engineer

Jausa Contracting Maldives Pvt. Ltd.
06.1998 - 12.1999

Project Consultant

IMPREGLIO SPA
01.1998 - 06.1998

Engineering Consultant

Self Employed
09.1990 - 12.1997

Resident Project Engineer

Metcalf & Eddy Intl.
09.1980 - 08.1990

Project Manager

Al Ghaleb & Al Nafal
09.1979 - 08.1980

Assistant Engineer

Madras Metropolitan Water Supply & Sewerage Board
05.1975 - 09.1979

Assistant Engineer

Tamilnadu Water Supply and Drainage Board
06.1974 - 05.1975

BE - Civil Engineering

PSG College of Technology
M.K. Sethu