Summary
Overview
Work History
Education
Skills
Websites
Accomplishments
Certification
Languages
Timeline
Generic
Mohammad Najibullah

Mohammad Najibullah

Mumbai

Summary

To seek and maintain full-time MEP/HVAC Project Manager position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

11
11
years of professional experience
1
1
Certification

Work History

MEP Project Manager

Tuff Offshore Energy And Engineering India Limited
Mumbai
01.2019 - Current
  • Ghantoot Tpt. & Gen. Cot .LLC - Building Division From: 10/2019: Until Now as an MEP Project Manager


  • Monitored construction sites for compliance with safety regulations and adherence to standards.
  • Reduced costs by streamlining contract bidding and procurement processes to assure best prices for materials and services.
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.
  • Assisted in organizing and overseeing assignments to drive operational excellence.
  • Oversaw effective disposal of construction waste and implemented programs to increase use of recycled materials.
  • Scheduled utility service providers according to project timelines.
  • Used computer software to design construction plans and perform calculations.
  • Tracked project costs and other financial metrics to maximize profitability.
  • Obtained building and specialty permits from local jurisdictional agencies.
  • Analyzed and evaluated construction bids to select most cost-effective contractors.
  • Prepared detailed project estimates and reports for management review.
  • Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Developed and implemented construction plans according to client specifications and expectations.
  • Implemented systems to improve process efficiency and reduce project duration.
  • Established and maintained relationships with vendors to source affordable and high quality materials and equipment for construction projects.
  • Collaborated with structural engineers to evaluate structural integrity of projects.
  • Negotiated labor contracts with general contractors and subcontractors.
  • Led design and development of residential and commercial buildings.
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.

Senior HVAC Engineer

KG Mech Electro-Mechanical Private Limited
Hyderabad
10.2016 - 10.2018

RADISSION SAS, Hotel. In Hyderabad, India


Owaisi HOSPITAL in Santosh Nagar, Hyderabad, India. The hospital (127 BED +13 Operation Room + 4 Isolation Room + (24 ICU& CCU) + NICU -

2 X-Ray Lap + Catheter lab + MRI +C.T Scan +Hot lap + CSSD + Laundry + Kitchen.....etc.) and

(Staff Accommodation building 35 flat) and Service block (5 electrical substation + H.V & L.V Room + Chiller yard and Pump room + Reverse osmosis system + Central Medical Gas Station + LPG System). Redesign for more than 60% For HVAC System and Plumbing and fire fitting and revise the

BMS DWG. Make balancing and Aerodynamics for HVAC System and make coordination with low current and medical equipment and medical gas equipment from the hospital subject to new architectural. The project total amount is (300milion INR)



  • Drafted system and equipment designs using CAD software.
  • Repaired and installed split systems, chillers and boilers.
  • Helped maintenance and building engineers make accurate assessments and repair plans for HVAC systems.
  • Coordinated with engineering group and other disciplines to develop new system designs.
  • Prepared reports and studies to resolve open technical issues.
  • Conducted safety analyses and hazard evaluations for systems.
  • Developed instrument diagrams, formal calculations and equipment datasheets.
  • Designed HVAC systems and specified components for successful installation and operation.
  • Compiled operational, performance and safety data on HVAC and support systems.
  • Promoted positive solutions for preventive maintenance, equipment repair and component fabrication to match specifications.
  • Interpreted blueprints, technical drawings, schematics and computer-generated reports for new product development.
  • Created centralized system resulting in increased reliability and profitability.
  • Designed budgets and cost estimates for projects with speed and accuracy while working closely with clients, drafters and employees to determine best courses of action.
  • Developed internal processes and plans for mechanical verification, product development and factory processes.
  • Performed pre-construction, quality and safety management, as well as constructability review, start-up and commissioning.
  • Educated clients on more energy-efficient solutions for old systems that meet project requirements for timelines and budgets.
  • Examined existing documents and blueprints to best update and maintain project records.
  • Designed new automated sensors for Duct leakage test systems.
  • Reviewed designs and counseled In house clients on courses of action to remedy issues while staying under-budget and sticking to timelines.
  • Developed automated calibration for use on Duct leakage test systems.
  • Identified suitable materials for production use that aligned with environmental concerns and budget constraints.
  • Drafted assemblies, models, and other technical drawings.
  • Troubleshot and diagnosed chiller equipment issues, quickly made plans for repairs and monitored use to rectify issues.
  • Liaised effectively between planning department and HVAC facility, keeping parties informed of project changes.
  • Effectively developed models, assemblies and drawings using AutoCAD and Revit.
  • Surveyed potential project sites before design, checking for space restrictions, mechanical feasibility and manufacturers guidelines.
  • Drove reliability and profitability through introduction of VRV system.
  • Supported data center power and cooling infrastructure and consistently applied critical facility operational best practices.
  • Tested newly installed systems, closely monitoring functionality and adherence to operating specifications.
  • Incorporated solutions that met various project challenges and adhered to environmental, packaging and vibration requirements.
  • Eliminated ineffective product line materials to resolve performance challenges and mitigate corrosion.
  • Created, prototyped and tested chiller systems for 10+ clients.
  • Specified system components and directed product modifications to comply with engineering design and performance specifications.
  • Applied mechanical problem solving skills to develop creative solutions for quality products.

MEP Engineer

Nawaz Infrastructure And Developers Private LTD
Gujarat
08.2013 - 09.2016
  • Reliance House Hotel in Jamnagar, Gujarat, India. Handled full responsibility of [HVAC & Plumbing & Fire Fighting], assist for BMS.


  • Carefully analyzed completed projects and studies for compliance with established budgets and policies.
  • Displayed tact and discretion when working with confidential project contracts and contractor information.
  • Gathered statistical information to delegate funds, equipment and personnel without overextending company budget.
  • Established and maintained best practices on maintenance management measures by routinely reviewing and updating ASHRAE standards.
  • Conducted detailed cost estimates for non-complex centralized and decentralized projects.
  • Carefully studied and perfected terminology and symbols directly related to design and drafting of building construction.
  • Interviewed representatives of leading manufacturing companies for pricing and specifications of mechanical equipment and manufacturing plans.
  • Supervised team of installers and mechanics to complete work on time and to company standards.
  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Monitored product quality and communicated necessary improvements to site superintendent.
  • Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.
  • Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.
  • Created and maintained daily and weekly reports for upper management.
  • Scheduled and oversaw maintenance, repair and installation activities.
  • Managed efficient teams of up to 50+ employees.
  • Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity.
  • Utilized proper tools and materials to adhere to safety guidelines.
  • Organized ongoing maintenance schedules to boost system performance.
  • Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.
  • Monitored daily progress and work quality to provide guidance and direction to mechanics and installers.
  • Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
  • Managed efficient teams of up to 50+ employees.
  • Evaluated final results to determine quality levels and isolate root causes of any identified faults.
  • Analyzed problems in load calculations and installation before formulating and enacting solutions.
  • Established and maintained best practices on maintenance management measures by routinely reviewing and updating ASHRAE standards.

Mechanical Engineer (HVAC)

Sulzer Chemtech
Gujarat
08.2012 - 08.2013

Worked extensively on Unit 37 Sulfur Station& Pipe Line Project -Package 11(Oil & Gas Filed), Jamnagar, Gujarat. [Control and administration, Maintenance building, IES, ware house, process utility building, substation- (1&2&3&750), Seet substations, guard houses].


The project total value is (10.2 Million INR ) under M/s.CCC., Gas Company.



  • Learned and adapted quickly to new technology and software applications.
  • Demonstrated creativity and resourcefulness through the development of innovative solutions.
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Demonstrated leadership skills in managing projects from concept to completion.
  • Applied effective time management techniques to meet tight deadlines.
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
  • Proven ability to develop and implement creative solutions to complex problems.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Used strong analytical and problem-solving skills to develop effective solutions for challenging situations.
  • Excellent communication skills, both verbal and written.
  • Proven ability to learn quickly and adapt to new situations.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Identified issues, analyzed information and provided solutions to problems.
  • Developed and maintained courteous and effective working relationships.
  • Passionate about learning and committed to continual improvement.
  • Provided professional services and support in a dynamic work environment.
  • Demonstrated strong organizational and time management skills while managing multiple projects.

Education

Project Management

PMI, USA
United States
07.2023

PG Certification In MEP Designing And Drafting - Electro-Mechanical

KG Mech Electro-Mechanical Private Limited
Hyderabad
01.2019

B.Tech - Mechanical Engineering Technology

Maulana Azad College Of Engineering And Technology
Patna, Bihar
06.2012

Skills

  • Degree in Engineering Discipline
  • Experience in managing external Consultant in a project delivery role
  • High level communication skills
  • High organized
  • Strong demonstrated problem solving skills, hi gh developed negotiation skills and attention to detail
  • Can lead and motivate others and works within a team environment
  • Achieves agreed objective and accepts accountability for results
  • High level of business and financial acumen, Adopts and implements new approaches and practices to meet circumstances
  • Complete the fast truck project before time with zero accident,
  • Ability to start and closed any project at any status
  • Controlling and monitor Time and Cost, Quality, and Procurement, Goal setting of project
  • Manage more than Project at same time by high of quality and Performance Design, site, solutions for (HVAC, FF, PL) systems, Electrical solutions
  • Time management, Specification, submittals, inquiry, calculated; negotiate The contractual issues subject to FIDIC law, Follow up the commercial issues
  • MEP Variation
  • Satisfy the owner without hamper the interests of working and the company
  • Improvement Strategies
  • Subcontractor Reviews
  • Change Management Process
  • Contract Documentation
  • Fire Protection
  • Activities Management
  • Vendor Relations
  • Vendor Selection
  • Project Requirements
  • Microsoft Office
  • Contract Preparation
  • Corrective Actions
  • Constructive Feedback
  • Oversee Subcontractors
  • AutoDesk AutoCAD
  • Plan Modifications and Takeoffs
  • Coordinate Value Engineering Reviews
  • Layout Development
  • Contract Terms Interpretation
  • Building Systems and Services
  • Hardworking and Reliable
  • Blueprint Updating and Distribution
  • Knowledgeable in Construction Safety
  • Specification and Blueprint Interpretation
  • Labor Requirements Determination
  • Jobber Computer Plus
  • Green Building Construction
  • Meet Code Requirements
  • Painting and Plumbing Work Oversight
  • Manage Sustainability Initiatives
  • Conflict Mediation
  • Best Building Practices
  • Administrative Oversight
  • Monitor Construction Quality
  • Safe Job Site Set-Up
  • Calculations and Measurements
  • Energetic and Positive
  • Risk Mitigation
  • HCSS HeavyBid
  • Permit and License Procurement
  • Analytical and Critical Thinking
  • Quality Control Programs
  • Site Delay Investigation
  • Construction Scheduling

Accomplishments

  • 1 - Managed a prestigious Hospital project totaling 300 million INR.

  • Used Microsoft Excel to develop inventory tracking spreadsheets.
  • Supervised team of 50+ staff members.

Certification

Post Graduate certification in MEP designing and drafting

Languages

English
Advanced (C1)

Timeline

MEP Project Manager

Tuff Offshore Energy And Engineering India Limited
01.2019 - Current

Senior HVAC Engineer

KG Mech Electro-Mechanical Private Limited
10.2016 - 10.2018

MEP Engineer

Nawaz Infrastructure And Developers Private LTD
08.2013 - 09.2016

Mechanical Engineer (HVAC)

Sulzer Chemtech
08.2012 - 08.2013

Project Management

PMI, USA

PG Certification In MEP Designing And Drafting - Electro-Mechanical

KG Mech Electro-Mechanical Private Limited

B.Tech - Mechanical Engineering Technology

Maulana Azad College Of Engineering And Technology

Post Graduate certification in MEP designing and drafting

Mohammad Najibullah