B.E Aerospace Engineering with 7+ years of experience in composite industries. Ability to manage multiple task and work under stressful environment. At present working as Assistant Manager -Blades APAC in Vestas Regional Operation Engineering.
Overview
8
8
years of professional experience
5
5
Certifications
Work History
Assistant Manager - Blades APAC
VESTAS
01.2021 - Current
Taking care of major blade related retrofits(Lightning upgrade, TE extender, Copper cap, etc) in Asia Pacific
Processing blade related CIR(Component Inspection Report) and creating reports to the customers and also providing RCA for blade failures
Making weekly and monthly report of blade status to the management
Giving training to the blade technicians and answering the technical queries
Analyzing all the blade repair works like LE erosion, lightning strike, internal damages, cracks etc, and providing reports to the site team
Monitoring blade inspection in most of the sites and giving alert to the site
Answering all the technical queries raised from different sites
Supporting globally for blade related queries and training the newcomers.
Process Engineer
SIEMENS GAMESA RENEWABLE ENERGY - INDUTCH COMPOSITES
05.2018 - 12.2020
In charge of SHELL mould and also have to take care of prefab and make ensure they are working by the process or not
Making Visual work instruction and work instruction for the mould and giving clear cut instruction to the technicians and training them in the shop floor
Making technical documentation and uploading in PLM windchill
Reducing cycle time and repairs using quality tools like 8D
Analysing the repairs like FRL and AIL and changing infusion strategy for getting zero NCR
Giving training to the new technicians and new engineers of the process flow and monitoring their level in the shop floor
Observing the heating panels and make ensure that all the heating zones are working fine and making changes in infusion and adhesive recipes if needed
Have to fix if anything goes wrong in heating panel and am completely responsible for TG SOFTWARE in SGRE plant, NELLORE
I have been in mould erection, mould installation and testing of SG145 and SG122 proto blades
Have participated in QCC and QIT projects in G114,SG122 and SG145 plant and making ILUO chart for the technicians for prefab, shell and finishing
Analysing SIKA test results when blade variant changes and deciding web spacers and padding layers for the WEB
Finally, whatever be the issue in SHELL, my presence is utmost significant to resolve the issue.
Production Engineer
GK MODE FIBER GLASS INDUSTRY
07.2016 - 04.2018
Checking the drawings of FRP product and giving training to the technicians
Analyzing the performance of the process and improving it
Presenting designs to managers and clients
Hands on experience on working with FRP doors, panels and tanks
Hands on experience with 300 BS, 450gsm, 600gsm and roving
Maintaining and giving target to the technicians on shop floor
Developing specific goals and plans to prioritize, organize, and accomplish your work.
Education
Bachelor of Aerospace Engineering -
National Aerospace University Khai University
Kharkiv, Ukraine
04.2001 -
Skills
Expert knowledge on blade materials and blade related issues
undefined
Certification
Bachelor of Aerospace Engineering - 72%- B16NO171052
Timeline
Assistant Manager - Blades APAC
VESTAS
01.2021 - Current
Process Engineer
SIEMENS GAMESA RENEWABLE ENERGY - INDUTCH COMPOSITES